UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Sectionsort descending Action Change # Nature of Change or Revision
Aug-2014 N UFGS 00 01 15 List of Drawings C 1 Added editor's note to import list of drawings as Excel XML spreadsheet.
Feb-2011 N UFGS 00 01 15 List of Drawings R Deleted references to diskettes
Jan-2007 N UFGS 00 01 15 List of Drawings R No Nature of Change statement provided.
Feb-2024 N UFGS 00 01 15 List of Drawings R Complete review and update.
May-2011 N UFGS 00 22 13 Supplementary Instructions to Bidders R Reference update: modified subpart 1.1
Aug-2008 N UFGS 00 22 13 Supplementary Instructions to Bidders R Minor revisions throughout
Feb-2014 N UFGS 00 22 13 Supplementary Instructions to Bidders D Superseded by UFGS 00 22 13.00 20 Supplementary Instructions to Offerors Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Jan-2007 N UFGS 00 22 13 Supplementary Instructions to Bidders R No Nature of Change statement provided.
May-2016 N UFGS 00 22 13.00 20 Supplementary Instructions to Offerors C 2 Administrative, revised use of "The Contractor" and "shall"
May-2014 N UFGS 00 22 13.00 20 Supplementary Instructions to Offerors C 1 Changed Physical Security Equipment (PSE) to Electronic Security Equipment (ESS) and modified FF&E and A/V CLIN.
Feb-2014 N UFGS 00 22 13.00 20 Supplementary Instructions to Offerors N New; Superseding UFGS 00 22 13 Supplementary Instructions to Bidders
Nov-2018 N UFGS 00 22 13.00 20 Supplementary Instructions to Offerors C 3 Deleted requirement for Azores excess shipping cost provisions. 
May-2022 N UFGS 00 22 13.00 20 Supplementary Instructions to Offerors D This Section has been removed from the UFGS data set and superseded by a Word document (for NAVFAC use). The new Price Schedule can be accessed here. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2013 A UFGS 00 31 10 Metric Measurements D Section removed from UFGS Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2014 N UFGS 00 41 00 Bid Schedules D Deleted, Superseded by UFGS 00 22 13.00 20 Supplementary Instructions to Offerors through unification. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Jan-2007 N UFGS 00 41 00 Bid Schedules R No Nature of Change statement provided.
Jul-2006 A UFGS 00 62 35 Recycled / Recovered Materials D Superseded by UFGS 01 62 35 Recycled / Recovered Materials Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2016 N UFGS 00 73 01 Supplementary Conditions for Guantanamo Bay Projects C 2 Added requirement for restrictions on Radio Transmitter Equipment previously located in Section 01 57 19.02.
Feb-2014 N UFGS 00 73 01 Supplementary Conditions for Guantanamo Bay Projects C 1 Deleted subpart 1.3.1.3 "Waiver for Workers' Compensation"
Aug-2008 N UFGS 00 73 01 Supplementary Conditions for Guantanamo Bay Projects R Section title has been changed from Special Conditions for Guantanamo Bay Projects
May-2020 N UFGS 00 73 01 Supplementary Conditions for Guantanamo Bay Projects D Information in this Section is now provided in (Superseded by) UFGS 01 14 00 WORK RESTRICTIONS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2008 N UFGS 00 73 02 Supplementary Conditions for Iceland Projects R Section title has been changed from Special Conditions for Iceland Projects
May-2012 N UFGS 00 73 02 Supplementary Conditions for Iceland Projects D Section has been deleted as the base in Iceland is now closed. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Apr-2008 N UFGS 00 73 03 Supplementary Conditions for Azores Projects R Added URL for file attachments/graphics
Aug-2008 N UFGS 00 73 03 Supplementary Conditions for Azores Projects R Section title has been changed from Special Conditions for Azores Projects
Oct-2007 N UFGS 00 73 03 Supplementary Conditions for Azores Projects R Renumbered paragraphs
Nov-2018 N UFGS 00 73 03 Supplementary Conditions for Azores Projects D Section is outdated and not used. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Apr-2008 N UFGS 00 73 04 Supplementary Conditions for Projects in Mediterranean Area R Added URL for file attachments/graphics
Aug-2008 N UFGS 00 73 04 Supplementary Conditions for Projects in Mediterranean Area R Section title has been changed from Special Conditions for Projects in Mediterranean Area
Aug-2020 N UFGS 00 73 04 Supplementary Conditions for Projects in Mediterranean Area D Information in this Section is now provided in (Superseded by) UFGS 01 14 00 WORK RESTRICTIONS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2015 N UFGS 01 11 00 Summary of Work R Revised throughout. Removed Project Environmental Goals covered under UFGS 01 33 29 Sustainability Reporting.
Nov-2014 N UFGS 01 11 00 Summary of Work C 1 SRF Update: Replaces 01 35 40.00 20 ENVIRONMENTAL MANAGEMENT with 01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS.
Jan-2008 N UFGS 01 11 00 Summary of Work R Added NASA requirements; this section supersedes UFGS 01 11 00.00 40
Aug-2011 N UFGS 01 11 00 Summary of Work R Modifed note before PART 1; modified note in subpart 1.14.1; added note in part 1.5; removed all notes in PART 3
Jul-2007 N UFGS 01 11 00 Summary of Work R Corrected hyperlink to CCB.
Jul-2006 N UFGS 01 11 00 Summary of Work R Added sustainable design requirements
May-2021 N UFGS 01 11 00 Summary of Work C 1 In response to CCR 8732, unnecessary brackets were removed from the last sentence in the 2nd paragraph under (1.8) LOCATION OF UNDERGROUND UTILITIES retaining the sentence as a standard requirement.
Aug-2021 N UFGS 01 11 00 Summary of Work C 2 In response to CCR 9971, added note to Submittal Article for NAVFAC PAC requirement to remove Government approval of salvage plan, and modified corresponding paragraph in text.
Feb-2024 N UFGS 01 11 00 Summary of Work R Complete review and update to include removal of FAR references, NASA-tailored requirements, and included requirements on Navy drawings.
Jan-2008 S UFGS 01 11 00.00 40 Summary of Work D Superseded by UFGS 01 11 00 Summary of Work (Preparing Activity: NAVFAC) Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Jun-2006 S UFGS 01 11 00.00 40 Summary of Work N New - Superseding UFGS 01 11 10.00 40 Summary of Work
Jul-2006 S UFGS 01 11 10.00 40 Summary of Work D Superseded by UFGS 01 11 00.00 40 Summary of Work Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2017 N UFGS 01 14 00 Work Restrictions C 4 Incorporation of DBIDS procedures for access to NAVY Installations.
May-2011 N UFGS 01 14 00 Work Restrictions R Modified subparts 1.4.1.2, 1.4.1.3, 1.4.10 and 1.5.7
Feb-2016 N UFGS 01 14 00 Work Restrictions C 3 Added requirement for utility cutover and connection to existing sanitary sewer line.
Aug-2014 N UFGS 01 14 00 Work Restrictions C 2 Fixed tailoring and bracket issue throughout. Revised Employment Restrictions for Bremerton, WA
Aug-2013 N UFGS 01 14 00 Work Restrictions C 1 Tailoring and changes for NAVFAC NW throughout
Nov-2011 N UFGS 01 14 00 Work Restrictions R Deleted subpart 1.5.18: "Commonwealth of Puerto Rico"; modified subparts 1.5.7 and 1.5.9
Aug-2018 N UFGS 01 14 00 Work Restrictions C 5 Removal of reference in para 1.6 to cancelled FAC.
Jul-2007 N UFGS 01 14 00 Work Restrictions R Added paragraph on smoking policy.
Jul-2006 N UFGS 01 14 00 Work Restrictions R Added NAVFAC Pacific color restrictions
Apr-2006 N UFGS 01 14 00 Work Restrictions R Various changes to incorporate Navy Regional requirements
Nov-2018 N UFGS 01 14 00 Work Restrictions C 6 Changed tailoring tags from NAVFAC PAC to NAVFAC HI based on CCRs, removed outdated information for Naval Shipyard Pearl Harbor, HI, and added personnel security requirements for use in secure or controlled areas.
May-2019 N UFGS 01 14 00 Work Restrictions C 7 In response to CCR 7479, the location and phone number for SWFPAC Pass and ID office has been updated in paragraph 1.16.1.1 Vehicle Access
Feb-2020 N UFGS 01 14 00 Work Restrictions C 8 In response to CCR 7400, Specifier Note in paragraph (1.5.8) Occupied (and Existing) Building[s] updated to clarify the Government’s responsibility to remove or relocate equipment and direct users on how to modify this section; per CCR 7849, Saturday working hours were updated to reflect an 8-1/2 hour work period in paragraph (1.5.5) Working Hours.
May-2020 N UFGS 01 14 00 Work Restrictions C 9 Incorporates requirements of UFGS 00 73 01 SUPPLEMENTARY CONDITIONS FOR GUANTANAMO BAY and cancels UFGS 00 73 01; In response to CCR 7820, refinement of electronic security system equipment categories within paragraph Electronic Security Systems Equipment (1.5.1.2.3)
Aug-2020 N UFGS 01 14 00 Work Restrictions C 10 Incorporate EURAFCENT requirements from, and supersede UFGS 00 74 00 SUPPLEMENTARY CONDITIONS FOR PROJECTS IN MEDITERRANEAN AREA. Also, incorporate the following CCRs: CCR 8681, revised requirements to ensure adherence to all appropriate PPE in paragraphs "Activity Regulations" (1.5.1) and "Shipyard Regulations" (1.5.3); CCR 8683, updated Specifier Note and paragraph "Working Hours" (1.5.5) to reflect the work schedules for various regions.
Nov-2020 N UFGS 01 14 00 Work Restrictions C 11 Updated Additional Personnel Requirements (1.5.1.2) and subparagraph to clarify work restrictions for secure facilities. Incorporated the following CCRs: CCR 9027, revised General Note in relation to tailoring options included in the section; CCR 9028, corrected tailoring in Part 1; and CCR 9029, corrected subpart hierarchy by moving "Unarmed Escort Services" paragraph into "CONTRACTED SERVICES FOR NBK BANGOR, SILVERDALE, WA. (1.16).
May-2021 N UFGS 01 14 00 Work Restrictions C 12 In response to CCR 9908, paragraph Shipyard Area Work Clearance Request (1.5.10) has been tailored for Navy.
Aug-2021 N UFGS 01 14 00 Work Restrictions C 13 In response to the following CCRs: 9044, added Note to Submittal Article with instructions for Navy Design-Build projects; 9826, updated last sentence in Activity Regulations paragraph (1.5.1) to clarify identifying Contractor equipment; 3976, replaced "must" with "will" or "may" throughout Part 1 as appropriate.
Feb-2022 N UFGS 01 14 00 Work Restrictions C 14 In response to CCR 11282, "Naval Base, Norfolk VA" and "Naval Air Station, Norfolk, VA" changed to "Naval Station Norfolk, Norfolk, VA".
Nov-2022 N UFGS 01 14 00 Work Restrictions R Complete review to reset section date; address CCRs 12149 & 12150, added "U.S. persons" to General Construction and Finish Work note and paragraph.
Feb-2023 N UFGS 01 14 00 Work Restrictions C 1 In response to CCR 12429, updated work requirements at Naval Base Kitsap.
Nov-2020 N UFGS 01 20 00 Price and Payment Procedures N New Unified Section; Superseding UFGS 01 20 00.00 20 and UFGS 01 22 00.00 10 PRICE AND PAYMENT PROCEDURES
Feb-2021 N UFGS 01 20 00 Price and Payment Procedures C 1 In response to CCR 9618, reference to FAR 32.503-6 has been replaced with "FAR 32.103 Progress payments under construction contracts" in paragraph (1.7.1) "Obligation of Government Payments" .
Aug-2021 N UFGS 01 20 00 Price and Payment Procedures C 2 In response to CCR 9972, included timeline requirements for both Schedule of Prices and Earned Value Report and corrected typo in Note in Data Required paragraph.
Feb-2023 N UFGS 01 20 00 Price and Payment Procedures C 3 In response to CCR 12177, replaced "lump sum" with "Job" in second Note for Army projects, removed "lump sum" from DREDGING paragraph (1.11).
May-2016 N UFGS 01 20 00.00 20 Price and Payment Procedures C 1 Updated invoice form numbers and DFARS clause for submission of Invoices.
Feb-2010 N UFGS 01 20 00.00 20 Price and Payment Procedures R 1.3.2 Title change and paragraph change
Aug-2009 N UFGS 01 20 00.00 20 Price and Payment Procedures R Updated the last criteria NOTE (Costloaded NAS) in the introduction; updated paras 1.3, 1.5,1.6, 1.7.2.
Aug-2011 N UFGS 01 20 00.00 20 Price and Payment Procedures R Modified subpart 1.5.1
Feb-2011 N UFGS 01 20 00.00 20 Price and Payment Procedures R Major revision
Nov-2011 N UFGS 01 20 00.00 20 Price and Payment Procedures R Modified note in subpart 1.5.g
Jul-2006 N UFGS 01 20 00.00 20 Price and Payment Procedures R Added requirements relating to precast/prestressed concrete piles
Feb-2020 N UFGS 01 20 00.00 20 Price and Payment Procedures C 2 In response to CCRs 8045 and 8049 subparts (1.3.1) Data Required and (1.3.2) Schedule Instructions updated to distinguish the requirements between schedule of prices and earned value reports.
Aug-2020 N UFGS 01 20 00.00 20 Price and Payment Procedures C 3 In response to CCR 8819, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01 and in paragraph "Data Required" (1.3.1)
Nov-2020 N UFGS 01 20 00.00 20 Price and Payment Procedures D Superseded by new unified section, UFGS 01 20 00 PRICE AND PAYMENT PROCEDURES. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2015 A UFGS 01 20 01.00 10 Cost and Performance Report D Superseded by UFGS 01 35 13.43 10 Special Project Procedures for Contaminated Sites; Scheduled maintenance update of section. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2015 A UFGS 01 22 00.00 10 Price and Payment Procedures R Scheduled maintenance update of section; Superseding UFGS 01 22 00.00 10 Measurement and Payment to comply with CSI MasterFormat.
Nov-2020 A UFGS 01 22 00.00 10 Price and Payment Procedures D Superseded by new unified section UFGS 01 20 00 PRICE AND PAYMENT PROCEDURES. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2011 N UFGS 01 30 00 Administrative Requirements R Modified subparts 1.2, 1.7, 1.9, 1.15 and 1.16
Aug-2015 N UFGS 01 30 00 Administrative Requirements R Revised throughout.
Feb-2010 N UFGS 01 30 00 Administrative Requirements R Minor revision to paragraphs 1.10 and 1.11
Nov-2009 N UFGS 01 30 00 Administrative Requirements R Deleted paragraph 1.15
Aug-2014 N UFGS 01 30 00 Administrative Requirements C 2 Deleted 35 mm slides as picture media
Aug-2012 S UFGS 01 30 00 Administrative Requirements C 1 Modified subpart 1.10
Aug-2008 N UFGS 01 30 00 Administrative Requirements R Added requirements for NAVFAC Red Zone, revised section references from MF95 to MF2004, and added missing Section References (SRF) tags
Nov-2011 N UFGS 01 30 00 Administrative Requirements R Modified note in subpart 1.6, deleted subpart 1.12 "Fair Labor Standards Act for Puerto Rico", modified note in subpart 1.14
Apr-2007 N UFGS 01 30 00 Administrative Requirements R Deleted insurance requirements for NAVFAC Pacific.
Oct-2006 N UFGS 01 30 00 Administrative Requirements R Added NAVFAC SW Tailoring Option
Jul-2006 N UFGS 01 30 00 Administrative Requirements R Added sustainable design requirements
Apr-2006 N UFGS 01 30 00 Administrative Requirements R Various changes to incorporate Navy Regional requirements
Nov-2019 N UFGS 01 30 00 Administrative Requirements C 1 In response to CCR 6757, paragraph FIRST TIER CONTRACTOR REQUIREMENTS FOR ASBESTOS CONTAINING MATERIALS (1.7) was deleted as it is repetitive of requirements already noted in Section 02 82 00 ASBESTOS REMEDIATION; per CCR 6658, Air Force tailoring has been added to the paragraphs "Duties" (1.7.2.1) and FACILITY TURNOVER PLANNING MEETINGS (NAVFAC Red Zone - NRZ) (1.9) since AFCEC/CF utilizes the Red Zone processes.
Feb-2020 N UFGS 01 30 00 Administrative Requirements C 2 In response to CCR 7879, updated language in subpart (1.12.1) Formal Partnering Specifier Note to ensure the facilitator is independent of both agencies involved in the project.
May-2020 N UFGS 01 30 00 Administrative Requirements C 3 In response to CCR 8484, updated paragraph Formal Partnering (1.12.1) to ensure the facilitator is independent of both agencies involved in the project.
Aug-2020 N UFGS 01 30 00 Administrative Requirements C 4 In response to CCRS 8820 and 9015, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01, updated paragraph "Formal Partnering" (1.12.1), and added paragraph "MOBILIZATION" (1.14).
Nov-2020 N UFGS 01 30 00 Administrative Requirements R Revised to include NAVFAC Design-Build Division 01 tailoring option and incorporate CCRs.
Aug-2021 N UFGS 01 30 00 Administrative Requirements C 1 In response to CCR 10208, updated requirements for NAVFAC PAC DB and DBB in Partnering and Mobilization paragraphs.
May-2022 N UFGS 01 30 00 Administrative Requirements C 2 Per CCR 9893, updated the Note in paragraph COLOR BOARDS FOR AIR FORCE PROJECTS (1.3) tailored for AIR FORCE to include AFI citation.
Aug-2023 N UFGS 01 30 00 Administrative Requirements C 3 Revised benchmarks for NAVFAC partnering based on 11013.40B