ETL 97-9 Criteria and Guidance for C-17 Contingency Operations on Semi-Prepared Airfields  

Date: 
11-25-1997

This ETL provides criteria and guidance for design, construction, maintenance, and evaluation of semi-prepared airfields for contingency and training operations of C-17 aircraft. It supersedes ETL 97-9 dated 15 October1997. Visual Flight Rules (VFR) apply for the dimensional criteria in Section 3.

Page(s): 
165