ETL 07-3 Jet Engine Thrust Standoff Requirements for Airfield Asphalt Edge Pavements  

Date: 
02-14-2007

This ETL presents the standoff distances from jet aircraft during engine run-up required to prevent uplift forces from causing catastrophic failure of asphalt edge pavements. This ETL supersedes ETL 01-5, Jet Engine Thrust Standoff Requirements for Airfield Asphalt Edge Pavements.

Page(s): 
7