Generic Requirements Document  

Status: 
Archive (Canceled)

The purpose of the RD is to provide the designer a basis for understanding the project requirements. It also provides the framework for executing this project through the team members. Active involvement by the user during all phases of design and construction is essential to insure the facility meets all functional requirements. The Design Agent (DA) is responsible for verifying the accuracy of the information contained within this document.

Page(s): 
19
Federal Facility Criteria: