Ellsworth Air Force Base - Installation Development and Design (ID2) (ACC)  

Date: 
06-21-2010

Current guidance removes design process short-circuits by realigning constraints, changing mandates into a performance framework and limiting prescriptive requirements to those critical in meeting Command Installation functional requirements.

Page(s): 
141
Federal Facility Criteria: