Ammunition and Explosive Storage Magazines

by Transystems Corporation (Compiled for the Unified Facilities Criteria (UFC))

Modified Freloc Stradley (Steel Oval Arch) 33-15-15

Approved for New Construction ECM Designation Designer & Drawing Number DDESB Approval Date
No 7-BAR U.S. Army Engineer Command (Europe) Modified FRELOC Stradley (Steel Oval Arch) 33-15-15 22-Aug-80

Files for Reference -
Digital Drawings -
Comments/Design Considerations -
This design includes a double leaf door system, similar to the 33-15-61 two-leaf sliding door tested as part of ESKIMO 11.

Back to ECM No Longer Approved for New Construction, But Still in Use

WBDG Services Construction Criteria Base