This page contains document links to Construction Criteria Base

Ammunition and Explosive Storage Magazines

by Transystems Corporation (Compiled for the Unified Facilities Criteria (UFC))

Composite Box 421-80-02

Approved for New Construction ECM Designation Designer & Drawing Number DDESB Approval Date
No 7-BAR COE Composite Box 421-80-02 1-Mar-00

Files for Reference -
Digital Drawings - Documentation -
Comments/Design Considerations -
This magazine uses a Blast and Fragment Resistant (BFR) wall system that is also known as the AGAN Steel Panel (ASP) System. Removed from the authorized new construction list on the advice of Huntsville Division COE, as the U.S. distributor for this magazine design is no longer in business.

Back to ECM No Longer Approved for New Construction, But Still in Use