Search CCB
PG-18-1
The VA has created two lists of contact people for a number of their documents. Please see the Technical Information Library Catalog and the Facilities Quality Service Contact List for this information.
The Department of Veterans Affairs has adopted MasterFormat 2004 as their numbering system for their Master Specifications. All new projects and those now in the Design Development phase should use these specifications. They have created a MATRIX showing the relationship between the section numbers in MasterFormat 1995 and MasterFormat 2004. There are two versions: the first MATRIX-10/07 (dated August 23, 2007; released October 2007) and an updated MATRIX-07/08 (dated July 2008; released July 2008).
The previous Master Construction Specifications in MasterFormat 1995 are available in a .zip file for download; they are for historical reference only and the VA will not be updating them.
NOTICE: During the 7/08 update, VA deleted 10 "front-end" documents. Please see the Standards Update Notice for more information.
| Title | Date | Downloads | |||||||
|---|---|---|---|---|---|---|---|---|---|
| DEPARTMENT OF VETERANS AFFAIRS MASTER SPECIFICATIONS in Microsoft WordRevised | 06-2013 | 9.6 MB | |||||||
| VA Specifications Conversion Matrix from MF95 to MF04; released 07/08 | 07-2008 | 38 KB | |||||||
| VA Specifications Conversion Matrix from MF95 to MF04; released 10/07 | 08-23-2007 | 47 KB | |||||||
| PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP | |||||||||
| Division 00 - Special Sections (MF10: Procurement and Contracting Requirements) | |||||||||
| Standards Update Notice Regarding the Deletion of "Front-End" Specifications | 07-2008 | 7 KB | |||||||
| VA 00 01 10 Department of Veterans Affairs Master Specifications - Table of ContentsRevised | 06-2013 | 116 KB | 392 KB | |||||||
| VA 00 01 15 List of Drawing Sheets | 09-2011 | 10 KB | 26 KB | |||||||
| VA 00 11 21 Request for Proposal to Design Build | 07-2011 | 44 KB | 76 KB | |||||||
| SPECIFICATIONS GROUP | |||||||||
| GENERAL REQUIREMENTS SUBGROUP | |||||||||
| Division 01 - General Requirements | |||||||||
| VA 01 00 00 General Requirements | 05-2013 | 550 KB | 189 KB | |||||||
| VA 01 32 16.01 Architectural and Engineering CPM Schedules | 01-2011 | 20 KB | 53 KB | |||||||
| VA 01 32 16.13 Network Analysis Schedules | 03-2011 | 49 KB | 116 KB | |||||||
| VA 01 32 16.15 Project Schedules: Small Projects - Design/Bid/Build | 04-2013 | 174 KB | 49 KB | |||||||
| VA 01 32 16.16 Network Analysis Schedules (Design-Build Only) | 05-2012 | 55 KB | 118 KB | |||||||
| VA 01 32 16.17 Project Schedules: Small Projects - Design/Build | 04-2011 | 30 KB | 53 KB | |||||||
| VA 01 33 23 Shop Drawings, Product Data and Samples | 03-2012 | 19 KB | 36 KB | |||||||
| VA 01 42 19 Reference Standards | 09-2011 | 65 KB | 41 KB | |||||||
| VA 01 45 29 Testing Laboratory Services | 10-2012 | 54 KB | 89 KB | |||||||
| VA 01 57 19 Temporary Environmental Controls | 01-2011 | 15 KB | 55 KB | |||||||
| VA 01 58 16 Temporary Interior Signage | 08-2011 | 6 KB | 26 KB | |||||||
| VA 01 74 19 Construction Waste Management | 06-2012 | 21 KB | 42 KB | |||||||
| VA 01 81 11 Sustainable Design Requirements | 02-2012 | 238 KB | 97 KB | |||||||
| VA 01 91 00 General Commissioning RequirementsRevised | 06-2013 | 348 KB | 723 KB | |||||||
| FACILITY CONSTRUCTION SUBGROUP | |||||||||
| Division 02 - Existing Conditions | |||||||||
| VA 02 21 00 Site Surveys | 05-2013 | 131 KB | 37 KB | |||||||
| VA 02 41 00 Demolition | 04-2013 | 113 KB | 35 KB | |||||||
| VA 02 65 00 Underground Storage Tank Removal | 05-2013 | 113 KB | 35 KB | |||||||
| VA 02 82 11 Traditional Asbestos Abatement | 07-2011 | 206 KB | 417 KB | |||||||
| VA 02 82 13.13 Glovebag Asbestos Abatement | 07-2011 | 181 KB | 284 KB | |||||||
| VA 02 82 13.19 Asbestos Floor Tile and Mastic Abatement | 07-2011 | 167 KB | 568 KB | |||||||
| VA 02 82 13.21 Asbestos Roofing Abatement | 07-2011 | 145 KB | 226 KB | |||||||
| VA 02 82 13.31 Asbestos Transite Abatement | 07-2011 | 148 KB | 234 KB | |||||||
| VA 02 82 13.41 Asbestos Abatement for Total Demolition Projects | 07-2011 | 207 KB | 279 KB | |||||||
| VA 02 83 33.13 Lead-Based Paint Removal and Disposal | 08-2011 | 29 KB | 52 KB | |||||||
| Division 03 - Concrete | |||||||||
| VA 03 23 00 Stressing Tendons | 07-2011 | 25 KB | 55 KB | |||||||
| VA 03 30 00 Cast-In-Place Concrete | 10-2012 | 86 KB | 133 KB | |||||||
| VA 03 30 53 (Short-Form) Cast-In-Place Concrete | 10-2012 | 37 KB | 70 KB | |||||||
| VA 03 37 13 Shotcrete | 07-2011 | 19 KB | 49 KB | |||||||
| VA 03 41 13 Precast Concrete Hollow Core Planks | 07-2011 | 12 KB | 33 KB | |||||||
| VA 03 41 33 Precast Structural Pretensioned Concrete | 07-2011 | 21 KB | 44 KB | |||||||
| VA 03 45 00 Precast Architectural Concrete | 09-2011 | 223 KB | 87 KB | |||||||
| VA 03 51 13 Cementitious Wood Fiber Decks | 09-2011 | 47 KB | 37 KB | |||||||
| VA 03 51 16 Gypsum Concrete Roof Decks | 09-2011 | 36 KB | 34 KB | |||||||
| VA 03 52 00 Lightweight Concrete Roof Insulation | 09-2011 | 58 KB | 40 KB | |||||||
| VA 03 55 11 Gypsum Concrete Floor Decks | 07-2011 | 13 KB | 34 KB | |||||||
| Division 04 - Masonry | |||||||||
| VA 04 05 13 Masonry Mortaring | 09-2011 | 49 KB | 39 KB | |||||||
| VA 04 05 16 Masonry Grouting | 09-2011 | 31 KB | 33 KB | |||||||
| VA 04 05 31 Masonry Tuck Pointing | 10-2008 | 27 KB | 35 KB | |||||||
| VA 04 20 00 Unit Masonry | 05-2012 | 76 KB | 112 KB | |||||||
| VA 04 72 00 Cast Stone MasonryRevised | 06-2013 | 126 KB | 74 KB | |||||||
| Division 05 - Metals | |||||||||
| VA 05 12 00 Structural Steel Framing | 11-2012 | 28 KB | 47 KB | |||||||
| VA 05 21 00 Steel Joist Framing | 03-2010 | 14 KB | 38 KB | |||||||
| VA 05 31 00 Steel Decking | 10-2012 | 32 KB | 58 KB | |||||||
| VA 05 36 00 Composite Metal Decking | 07-2011 | 18 KB | 41 KB | |||||||
| VA 05 40 00 Cold-Formed Metal Framing | 07-2011 | 19 KB | 41 KB | |||||||
| VA 05 50 00 Metal Fabrications | 09-2011 | 281 KB | 108 KB | |||||||
| VA 05 51 00 Metal Stairs | 09-2011 | 45 KB | 36 KB | |||||||
| Division 06 - Wood and Plastic (MF10: Wood, Plastics and Composites) | |||||||||
| VA 06 10 00 Rough Carpentry | 09-2011 | 143 KB | 63 KB | |||||||
| VA 06 16 63 Cementitious Sheathing | 05-2012 | 17 KB | 33 KB | |||||||
| VA 06 20 00 Finish CarpentryRevised | 06-2013 | 143 KB | 67 KB | |||||||
| Division 07 - Thermal and Moisture Protection | |||||||||
| VA 07 01 50.19 Preparation for Re-Roofing | 10-2010 | 20 KB | 61 KB | |||||||
| VA 07 08 00 Facility Exterior Closure CommissioningRevised | 06-2013 | 102 KB | 33 KB | |||||||
| VA 07 11 13 Bituminous Dampproofing | 05-2012 | 13 KB | 28 KB | |||||||
| VA 07 12 00 Built-Up Bituminous Waterproofing | 09-2011 | 54 KB | 38 KB | |||||||
| VA 07 13 00 Sheet Waterproofing | 04-2013 | 101 KB | 32 KB | |||||||
| VA 07 13 52 Modified Bituminous Sheet Waterproofing | 09-2011 | 43 KB | 35 KB | |||||||
| VA 07 14 21 Latex Mastic Deck Covering | 09-2011 | 19 KB | 28 KB | |||||||
| VA 07 18 13 Pedestrian Traffic Coatings | 09-2011 | 32 KB | 38 KB | |||||||
| VA 07 21 13 Thermal Insulation | 06-2012 | 24 KB | 51 KB | |||||||
| VA 07 21 23 Loose-Fill Insulation | 06-2012 | 18 KB | 42 KB | |||||||
| VA 07 22 00 Roof and Deck Insulation | 10-2010 | 32 KB | 72 KB | |||||||
| VA 07 24 00 Exterior Insulation and Finish Systems | 10-2011 | 98 KB | 62 KB | |||||||
| VA 07 27 26 Fluid Applied Membrane Air Barriers, Vapor Permeable | 08-2012 | 38 KB | 69 KB | |||||||
| VA 07 27 27 Fluid Applied Membrane Air Barriers, Vapor Retarding | 08-2012 | 38 KB | 68 KB | |||||||
| VA 07 31 13 Asphalt Shingles | 05-2012 | 18 KB | 32 KB | |||||||
| VA 07 31 26 Slate Shingles | 03-2012 | 13 KB | 28 KB | |||||||
| VA 07 31 29.13 Wood Shingles | 05-2012 | 17 KB | 32 KB | |||||||
| VA 07 32 13 Clay Roof Tiles | 05-2012 | 18 KB | 33 KB | |||||||
| VA 07 40 00 Roofing and Siding Panels | 10-2011 | 82 KB | 45 KB | |||||||
| VA 07 51 00 Built-Up Bituminous Roofing | 05-2013 | 254 KB | 73 KB | |||||||
| VA 07 51 00.11 Built-Up Bituminous Roofing, Hot Applied | 05-2013 | 361 KB | 117 KB | |||||||
| VA 07 51 00.13 Built-Up Bituminous Roofing, Cold-Applied | 10-2010 | 49 KB | 107 KB | |||||||
| VA 07 52 16 Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing, Hot-Applied | 02-2013 | 310 KB | 103 KB | |||||||
| VA 07 52 16.13 Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing, Cold-AppliedRevised | 06-2013 | 158 KB | 97 KB | |||||||
| VA 07 53 23 Ethylene-Propylene-Diene-Monomer Roofing | 08-2008 | 177 KB | 80 KB | |||||||
| VA 07 54 16 Ethylene Interpolymer (KEE) Roofing | 10-2010 | 38 KB | 91 KB | |||||||
| VA 07 54 19 Polyvinyl-Chloride (PVC) Roofing | 11-2012 | 58 KB | 96 KB | |||||||
| VA 07 54 23 Thermoplastic Polyolefin (TPO) Roofing | 01-2013 | 260 KB | 88 KB | |||||||
| VA 07 56 00 Fluid-Applied Roofing | 10-2011 | 54 KB | 43 KB | |||||||
| VA 07 57 13 Sprayed Polyurethane Foam Roofing | 10-2011 | 38 KB | 39 KB | |||||||
| VA 07 60 00 Flashing and Sheet Metal | 10-2010 | 51 KB | 101 KB | |||||||
| VA 07 61 16 Batten Seam Sheet Metal Roofing | 10-2011 | 25 KB | 29 KB | |||||||
| VA 07 71 00 Roof Specialties | 10-2011 | 50 KB | 37 KB | |||||||
| VA 07 72 00 Roof Accessories | 10-2011 | 68 KB | 42 KB | |||||||
| VA 07 81 00 Applied Fireproofing | 11-2011 | 65 KB | 51 KB | |||||||
| VA 07 84 00 Firestopping | 10-2011 | 33 KB | 32 KB | |||||||
| VA 07 92 00 Joints Sealants | 12-2011 | 35 KB | 56 KB | |||||||
| VA 07 95 13 Expansion Joint Cover Assemblies | 10-2011 | 94 KB | 49 KB | |||||||
| Division 08 - Doors and Windows (MF10: Openings) | |||||||||
| VA 08 11 13 Hollow Metal Doors and Frames | 01-2013 | 174 KB | 62 KB | |||||||
| VA 08 11 61 Detention Door Screens | 10-2011 | 43 KB | 35 KB | |||||||
| VA 08 11 73 Sliding Metal Fire Doors | 10-2011 | 17 KB | 27 KB | |||||||
| VA 08 14 00 Interior Wood Doors | 10-2012 | 33 KB | 56 KB | |||||||
| VA 08 17 10 Integrated Door Assemblies | 03-2012 | 46 KB | 138 KB | |||||||
| VA 08 17 10 Integrated Door Assemblies | 03-2012 | 46 KB | 138 KB | |||||||
| VA 08 31 13 Access Doors and Frames | 10-2011 | 40 KB | 33 KB | |||||||
| VA 08 33 00 Coiling Doors and Grilles | 10-2011 | 96 KB | 50 KB | |||||||
| VA 08 33 13 Coiling Counter Doors | 10-2011 | 53 KB | 37 KB | |||||||
| VA 08 34 36 Darkroom Doors | 10-2011 | 15 KB | 28 KB | |||||||
| VA 08 34 53 Security Doors and Frames | 12-2009 | 76 KB | 75 KB | |||||||
| VA 08 34 59 Vault Doors and Day Gates | 10-2011 | 16 KB | 29 KB | |||||||
| VA 08 35 13.13 Accordion Folding Doors | 10-2011 | 24 KB | 29 KB | |||||||
| VA 08 36 13 Sectional Doors | 10-2011 | 60 KB | 39 KB | |||||||
| VA 08 38 16 Flexible Traffic Doors | 10-2011 | 17 KB | 27 KB | |||||||
| VA 08 41 13 Aluminum-Framed Entrances and Storefronts | 10-2011 | 59 KB | 38 KB | |||||||
| VA 08 42 33 Revolving Door Entrances | 10-2011 | 109 KB | 53 KB | |||||||
| VA 08 44 13 Glazed Aluminum Curtain Walls | 10-2011 | 213 KB | 83 KB | |||||||
| VA 08 51 13 Aluminum Windows | 11-2012 | 37 KB | 61 KB | |||||||
| VA 08 51 13.11 Side-Hinged Aluminum Windows | 05-2013 | 152 KB | 46 KB | |||||||
| VA 08 51 23 Steel Windows | 10-2011 | 95 KB | 48 KB | |||||||
| VA 08 51 69.11 Aluminum Storm Windows | 10-2011 | 37 KB | 33 KB | |||||||
| VA 08 56 19 Pass Windows | 10-2011 | 20 KB | 28 KB | |||||||
| VA 08 56 53 Blast Resistant Windows | 05-2012 | 28 KB | 56 KB | |||||||
| VA 08 56 59 Service and Teller Window Units | 10-2011 | 30 KB | 35 KB | |||||||
| VA 08 56 66 Detention Window Screens | 10-2011 | 51 KB | 36 KB | |||||||
| VA 08 63 00 Metal-Framed Skylights | 10-2011 | 93 KB | 49 KB | |||||||
| VA 08 71 00 Door Hardware | 03-2012 | 183 KB | 287 KB | |||||||
| VA 08 71 13 Automatic Door Operators | 06-2012 | 24 KB | 42 KB | |||||||
| VA 08 71 13.11 Low Energy Power Assist Door Operators | 01-2011 | 16 KB | 50 KB | |||||||
| VA 08 80 00 Glazing | 10-2012 | 80 KB | 115 KB | |||||||
| VA 08 90 00 Louvers and Vents | 10-2011 | 70 KB | 42 KB | |||||||
| Division 09 - Finishes | |||||||||
| VA 09 06 00 Schedule for Finishes | 10-2011 | 363 KB | 834 KB | |||||||
| VA 09 22 16 Non-Structural Metal Framing | 07-2010 | 27 KB | 49 KB | |||||||
| VA 09 23 00 Gypsum Plastering | 10-2011 | 91 KB | 51 KB | |||||||
| VA 09 24 00 Portland Cement Plastering | 10-2011 | 75 KB | 46 KB | |||||||
| VA 09 26 00 Veneer Plastering | 10-2011 | 54 KB | 40 KB | |||||||
| VA 09 29 00 Gypsum Board | 02-2013 | 154 KB | 51 KB | |||||||
| VA 09 30 13 Ceramic/Porcelain Tiling | 05-2012 | 59 KB | 93 KB | |||||||
| VA 09 51 00 Acoustical Ceilings | 10-2010 | 26 KB | 57 KB | |||||||
| VA 09 54 23 Linear Metal Ceilings | 10-2011 | 82 KB | 45 KB | |||||||
| VA 09 63 13 Brick Flooring | 09-2012 | 27 KB | 36 KB | |||||||
| VA 09 63 40 Stone Flooring | 10-2011 | 19 KB | 29 KB | |||||||
| VA 09 65 13 Resilient Base and Accessories | 10-2011 | 44 KB | 36 KB | |||||||
| VA 09 65 16 Resilient Sheet Flooring | 07-2010 | 25 KB | 47 KB | |||||||
| VA 09 65 19 Resilient Tile Flooring | 03-2011 | 19 KB | 39 KB | |||||||
| VA 09 66 13 Portland Cement Terrazzo Flooring | 10-2011 | 63 KB | 39 KB | |||||||
| VA 09 66 16 Terrazzo Floor Tile | 10-2011 | 46 KB | 43 KB | |||||||
| VA 09 67 23.20 Resinous (Epoxy Base) With Vinyl Chip Broadcast (RES-2) | 05-2011 | 38 KB | 107 KB | |||||||
| VA 09 67 23.30 Resinous (Epoxy Resin Composition) Mortar Flooring (RES-3) | 05-2011 | 37 KB | 103 KB | |||||||
| VA 09 67 23.50 Resinous (Epoxy Terrazzo) Flooring (RES-5) | 10-2010 | 37 KB | 113 KB | |||||||
| VA 09 67 23.60 Resinous (Urethane and Epoxy Mortar) Flooring (RES-6) | 05-2011 | 45 KB | 128 KB | |||||||
| VA 09 68 00 Carpeting | 10-2011 | 65 KB | 43 KB | |||||||
| VA 09 68 21 Athletic Carpeting | 11-2011 | 30 KB | 40 KB | |||||||
| VA 09 69 00 Access Flooring | 11-2011 | 126 KB | 63 KB | |||||||
| VA 09 72 16 Vinyl-Coated Fabric Wall Coverings | 11-2011 | 40 KB | 36 KB | |||||||
| VA 09 72 31 Polypropylene Fabric Wallcovering | 11-2011 | 36 KB | 34 KB | |||||||
| VA 09 84 33 Sound-Absorbing Wall Units | 11-2011 | 23 KB | 30 KB | |||||||
| VA 09 91 00 Painting | 06-2012 | 68 KB | 105 KB | |||||||
| VA 09 94 19 Multicolor Interior Finishing | 05-2013 | 115 KB | 35 KB | |||||||
| VA 09 96 59 High-Build Glazed Coatings | 05-2013 | 96 KB | 30 KB | |||||||
| VA 09 97 33.10 Resinous Coating Systems for Walls and Ceilings (RES-W) | 11-2010 | 26 KB | 67 KB | |||||||
| Division 10 - Specialties | |||||||||
| VA 10 11 13 Chalkboards and Markerboards | 10-2011 | 30 KB | 33 KB | |||||||
| VA 10 11 23 Tackboards | 11-2011 | 32 KB | 34 KB | |||||||
| VA 10 13 00 Directories | 11-2011 | 129 KB | 58 KB | |||||||
| VA 10 14 00 Signage | 11-2011 | 118 KB | 55 KB | |||||||
| VA 10 21 13 Toilet Compartments | 05-2012 | 16 KB | 34 KB | |||||||
| VA 10 21 16 Shower and Dressing Compartments | 11-2011 | 25 KB | 31 KB | |||||||
| VA 10 21 23 Cubicle Curtain Tracks | 11-2011 | 45 KB | 36 KB | |||||||
| VA 10 22 13 Wire Mesh Partitions | 11-2011 | 25 KB | 31 KB | |||||||
| VA 10 22 19.13 Demountable Metal Partitions | 06-2012 | 18 KB | 45 KB | |||||||
| VA 10 22 26.13 Accordion Folding Partitions | 11-2011 | 38 KB | 35 KB | |||||||
| VA 10 25 13 Patient Bed Service Walls | 11-2011 | 96 KB | 47 KB | |||||||
| VA 10 26 00 Wall and Door Protection | 01-2011 | 11 KB | 39 KB | |||||||
| VA 10 28 00 Toilet, Bath and Laundry Accessories | 11-2011 | 125 KB | 60 KB | |||||||
| VA 10 44 13 Fire Extinguisher Cabinets | 11-2011 | 14 KB | 28 KB | |||||||
| VA 10 75 00 Flagpoles | 11-2011 | 20 KB | 30 KB | |||||||
| Division 11 - Equipment | |||||||||
| VA 11 05 12 General Motor Requirements for Equipment | 11-2011 | 37 KB | 59 KB | |||||||
| VA 11 12 00 Parking Control Equipment | 11-2011 | 94 KB | 50 KB | |||||||
| VA 11 17 36 Package Transfer Units | 02-2013 | 103 KB | 33 KB | |||||||
| VA 11 26 00 Unit Kitchens | 11-2011 | 38 KB | 34 KB | |||||||
| VA 11 27 00 Photographic Processing Equipment | 11-2011 | 37 KB | 55 KB | |||||||
| VA 11 40 11 Custom Fabricated Foodservice Equipment | 11-2011 | 75 KB | 73 KB | |||||||
| VA 11 40 21 Food Service Equipment - Utility Distribution System | 11-2011 | 58 KB | 60 KB | |||||||
| VA 11 41 00 Food Storage Equipment | 11-2011 | 78 KB | 92 KB | |||||||
| VA 11 41 21 Walk-In Coolers and Freezers | 11-2011 | 71 KB | 43 KB | |||||||
| VA 11 44 00 Food Cooking Equipment | 11-2011 | 131 KB | 142 KB | |||||||
| VA 11 48 00 Cleaning and Disposal Equipment | 11-2011 | 81 KB | 77 KB | |||||||
| VA 11 53 13 Laboratory Fume Hoods | 01-2011 | 25 KB | 73 KB | |||||||
| VA 11 53 23 Laboratory Refrigerators | 11-2011 | 37 KB | 34 KB | |||||||
| VA 11 53 53 Biological Safety Cabinets and Laminar Airflow Work Stations | 01-2011 | 19 KB | 63 KB | |||||||
| VA 11 53 61 Custom Fabricated Laboratory Equipment | 11-2011 | 50 KB | 68 KB | |||||||
| VA 11 53 71 Solution Warming Cabinets | 11-2011 | 22 KB | 61 KB | |||||||
| VA 11 71 01 Medical Washing and Sterilizing Equipment | 02-2011 | 25 KB | 99 KB | |||||||
| VA 11 71 02 Laboratory Washing and Sterlizing Equipment | 10-2011 | 80 KB | 145 KB | |||||||
| VA 11 73 00 Ceiling Mounted Patient Lift System | 07-2010 | 13 KB | 75 KB | |||||||
| VA 11 78 00 Mortuary Equipment | 11-2011 | 39 KB | 46 KB | |||||||
| VA 11 78 13 Mortuary Refrigerators | 11-2011 | 44 KB | 35 KB | |||||||
| VA 11 79 13 Hydrotherapy Equipment | 11-2011 | 24 KB | 41 KB | |||||||
| VA 11 82 19 Packaged Incinerators | 11-2011 | 128 KB | 58 KB | |||||||
| Division 12 - Furnishings | |||||||||
| VA 12 22 16 Drapery Track and Accessories | 11-2011 | 26 KB | 34 KB | |||||||
| VA 12 24 00 Window Shades | 11-2011 | 54 KB | 45 KB | |||||||
| VA 12 24 21 Lightproof Shades | 11-2011 | 26 KB | 37 KB | |||||||
| VA 12 31 00 Manufactured Metal Casework | 04-2011 | 35 KB | 67 KB | |||||||
| VA 12 32 00 Manufactured Wood Casework | 11-2011 | 65 KB | 44 KB | |||||||
| VA 12 34 00 Manufactured Plastic Casework | 11-2011 | 126 KB | 70 KB | |||||||
| VA 12 35 70.21 Medication Cabinet | 11-2011 | 51 KB | 37 KB | |||||||
| VA 12 36 00 CountertopsRevised | 06-2013 | 133 KB | 83 KB | |||||||
| VA 12 56 70.11 Suspended Table | 11-2011 | 40 KB | 36 KB | |||||||
| Division 13 - Special Construction | |||||||||
| VA 13 05 41 Seismic Restraint Requirements for Non-Structural Components | 08-2011 | 22 KB | 45 KB | |||||||
| VA 13 17 23 Therapeutic Pools | 11-2011 | 65 KB | 60 KB | |||||||
| VA 13 17 23.11 Therapeutic Pool Accessories | 11-2011 | 40 KB | 35 KB | |||||||
| VA 13 19 13 Kennel Enclosures and Gates | 11-2011 | 23 KB | 30 KB | |||||||
| VA 13 21 29 Constant Temperature Rooms | 11-2011 | 53 KB | 56 KB | |||||||
| VA 13 34 19 Metal Building Systems | 01-2013 | 177 KB | 53 KB | |||||||
| VA 13 49 00 Radiation Protection | 07-2011 | 29 KB | 54 KB | |||||||
| Division 14 - Conveying Equipment | |||||||||
| VA 14 12 11 Electric Dumbwaiter Geared Traction and Winding Drum | 05-2011 | 79 KB | 126 KB | |||||||
| VA 14 21 00 Electric Traction Elevators | 09-2011 | 154 KB | 251 KB | |||||||
| VA 14 21 11 Traction Cartlift | 06-2011 | 349 KB | 138 KB | |||||||
| VA 14 24 00 Hydraulic Elevators | 05-2011 | 149 KB | 222 KB | |||||||
| VA 14 24 11 Hydraulic Cartlift | 06-2011 | 343 KB | 133 KB | |||||||
| VA 14 91 33 Laundry and Linen Chutes | 06-2012 | 22 KB | 40 KB | |||||||
| VA 14 91 82 Trash Chutes | 06-2012 | 22 KB | 40 KB | |||||||
| FACILITY SERVICES SUBGROUP | |||||||||
| Division 21 - Fire Suppression | |||||||||
| VA 21 05 11 Common Work Results for Fire Suppression | 11-2009 | 30 KB | 73 KB | |||||||
| VA 21 05 12 General Motor Requirements for Fire-Suppression Equipment | 05-2003 | 37 KB | 75 KB | |||||||
| VA 21 08 00 Commissioning of Fire Supression SystemsRevised | 06-2013 | 129 KB | 38 KB | |||||||
| VA 21 10 00 Water-Based Fire-Suppression Systems | 09-2011 | 50 KB | 85 KB | |||||||
| VA 21 12 00 Fire-Suppression Standpipes | 12-2005 | 98 KB | 66 KB | |||||||
| VA 21 13 13 Wet-Pipe Sprinkler Systems | 05-2008 | 110 KB | 75 KB | |||||||
| Division 22 - Plumbing | |||||||||
| VA 22 05 11 Common Work Results for Plumbing | 04-2011 | 58 KB | 91 KB | |||||||
| VA 22 05 12 General Motor Requirements for Plumbing Equipment | 12-2009 | 20 KB | 70 KB | |||||||
| VA 22 05 19 Meters and Gages for Plumbing Piping | 02-2010 | 15 KB | 44 KB | |||||||
| VA 22 05 23 General-Duty Valves for Plumbing Piping | 12-2009 | 23 KB | 62 KB | |||||||
| VA 22 05 33 Heat Tracing for Plumbing Piping | 12-2009 | 17 KB | 53 KB | |||||||
| VA 22 08 00 Commissioning of Plumbing SystemsRevised | 06-2013 | 129 KB | 33 KB | |||||||
| VA 22 07 11 Plumbing Insulation | 05-2011 | 53 KB | 116 KB | |||||||
| VA 22 11 00 Facility Water Distribution | 05-2011 | 97 KB | 58 KB | |||||||
| VA 22 11 23 Domestic Water Pumps | 11-2010 | 23 KB | 52 KB | |||||||
| VA 22 12 16 Facility Elevated, Potable-Water Storage Tanks | 05-2011 | 26 KB | 49 KB | |||||||
| VA 22 13 00 Facility Sanitary and Vent Piping | 06-2012 | 47 KB | 84 KB | |||||||
| VA 22 13 23 Sanitary Waste Interceptors | 12-2009 | 12 KB | 36 KB | |||||||
| VA 22 13 29 Sanitary Sewerage Pumps | 05-2013 | 119 KB | 39 KB | |||||||
| VA 22 13 33 Packages, Submersible Sewerage Pump Units | 11-2010 | 15 KB | 40 KB | |||||||
| VA 22 13 36 Packaged, Wastewater Pump Units | 01-2011 | 13 KB | 43 KB | |||||||
| VA 22 14 00 Facility Storm Drainage | 12-2009 | 32 KB | 69 KB | |||||||
| VA 22 14 29 Sump Pumps | 01-2011 | 10 KB | 40 KB | |||||||
| VA 22 14 33 Packages, Pedestal Drainage Pump Units | 11-2010 | 16 KB | 40 KB | |||||||
| VA 22 14 36 Packaged, Submersible, Drainage Pump Units | 01-2011 | 10 KB | 41 KB | |||||||
| VA 22 15 00 General Service Compressed-Air Systems | 12-2009 | 22 KB | 59 KB | |||||||
| VA 22 31 11 Water Softeners | 02-2011 | 17 KB | 60 KB | |||||||
| VA 22 33 00 Electric Domestic Water Heaters | 02-2010 | 20 KB | 47 KB | |||||||
| VA 22 34 00 Fuel-Fired Domestic Water Heaters | 02-2010 | 22 KB | 51 KB | |||||||
| VA 22 35 00 Domestic Water Heat Exchangers | 02-2010 | 21 KB | 44 KB | |||||||
| VA 22 40 00 Plumbing Fixtures | 03-2011 | 97 KB | 147 KB | |||||||
| VA 22 42 26 Commercial Disposers | 11-2010 | 27 KB | 99 KB | |||||||
| VA 22 61 13.74 Dental Compressed-Air Piping | 12-2009 | 23 KB | 56 KB | |||||||
| VA 22 61 19.74 Dental Compressed-Air Equipment | 12-2009 | 40 KB | 78 KB | |||||||
| VA 22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities | 08-2012 | 82 KB | 148 KB | |||||||
| VA 22 62 19.74 Dental Vacuum and Evacuation Equipment | 12-2010 | 18 KB | 53 KB | |||||||
| VA 22 63 00 Gas Systems for Laboratory and Healthcare Facilities | 12-2010 | 67 KB | 134 KB | |||||||
| VA 22 66 00 Chemical-Waste Systems for Laboratory and Healthcare Facilities | 12-2009 | 31 KB | 68 KB | |||||||
| VA 22 67 19.16 Reverse-Osmosis Water Equipment | 02-2011 | 15 KB | 61 KB | |||||||
| VA 22 67 21 Water Dealkalizing System | 02-2011 | 13 KB | 47 KB | |||||||
| Division 23 - Heating, Ventilating, and Air Conditioning | |||||||||
| VA 23 05 10 Common Work Results for Boiler Plant and Steam Generation | 11-2010 | 83 KB | 126 KB | |||||||
| VA 23 05 11 Common Work Results for HVAC | 11-2010 | 65 KB | 104 KB | |||||||
| VA 23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment | 11-2010 | 24 KB | 70 KB | |||||||
| VA 23 05 41 Noise and Vibration Control for HVAC Piping and Equipment | 11-2010 | 50 KB | 155 KB | |||||||
| VA 23 05 51 Noise and Vibration Control for Boiler Plant | 11-2010 | 6 KB | 30 KB | |||||||
| VA 23 05 93 Testing, Adjusting and Balancing for HVAC | 05-2011 | 33 KB | 61 KB | |||||||
| VA 23 07 11 HVAC and Boiler Plant Insulation | 05-2011 | 83 KB | 163 KB | |||||||
| VA 23 08 00 Commissioning of HVAC SystemsRevised | 06-2013 | 129 KB | 33 KB | |||||||
| VA 23 08 11 Demonstrations and Tests for Boiler Plant | 11-2010 | 13 KB | 36 KB | |||||||
| VA 23 09 11 Instrumentation and Control for Boiler Plant | 11-2010 | 123 KB | 223 KB | |||||||
| VA 23 09 23 Direct-Digital Control System for HVAC | 09-2011 | 164 KB | 300 KB | |||||||
| VA 23 10 00 Facility Fuel Systems | 09-2011 | 78 KB | 109 KB | |||||||
| VA 23 11 23 Facility Natural-Gas Piping | 05-2011 | 24 KB | 46 KB | |||||||
| VA 23 21 11 Boiler Plant Piping Systems | 09-2011 | 95 KB | 152 KB | |||||||
| VA 23 21 13 Hydronic Piping | 09-2012 | 230 KB | 96 KB | |||||||
| VA 23 21 23 Hydronic Pumps | 02-2010 | 17 KB | 48 KB | |||||||
| VA 23 22 13 Steam and Condensate Heating Piping | 03-2010 | 51 KB | 101 KB | |||||||
| VA 23 22 23 Steam Condensate Pumps | 02-2010 | 26 KB | 51 KB | |||||||
| VA 23 23 00 Refrigerant Piping | 02-2010 | 30 KB | 53 KB | |||||||
| VA 23 25 00 HVAC Water Treatment | 02-2010 | 35 KB | 63 KB | |||||||
| VA 23 31 00 HVAC Ducts and Casings | 03-2013 | 234 KB | 80 KB | |||||||
| VA 23 34 00 HVAC Fans | 11-2009 | 46 KB | 73 KB | |||||||
| VA 23 36 00 Air Terminal Units | 03-2010 | 22 KB | 49 KB | |||||||
| VA 23 37 00 Air Outlets and Inlets | 11-2009 | 33 KB | 63 KB | |||||||
| VA 23 38 13 Commercial-Kitchen Hoods | 01-2011 | 18 KB | 72 KB | |||||||
| VA 23 40 00 HVAC Air Cleaning Devices | 02-2012 | 196 KB | 127 KB | |||||||
| VA 23 50 11 Boiler Plant Mechanical Equipment | 05-2011 | 116 KB | 188 KB | |||||||
| VA 23 51 00 Breechings, Chimneys, and Stacks | 05-2011 | 28 KB | 50 KB | |||||||
| VA 23 52 25 Low Pressure Water Heating Boilers | 05-2010 | 75 KB | 136 KB | |||||||
| VA 23 52 33 Water-Tube Boilers | 05-2011 | 98 KB | 151 KB | |||||||
| VA 23 52 39 Fire-Tube Boilers | 05-2011 | 78 KB | 116 KB | |||||||
| VA 23 56 00 Solar Energy Heating System | 01-2013 | 190 KB | 107 KB | |||||||
| VA 23 57 33 Geothermal Energy - Direct Use (Heating Applications) | 01-2013 | 119 KB | 71 KB | |||||||
| VA 23 64 00 Packaged Water Chillers | 04-2011 | 73 KB | 116 KB | |||||||
| VA 23 65 00 Cooling Towers | 02-2010 | 66 KB | 108 KB | |||||||
| VA 23 72 00 Air-to-Air Energy Recovery Equipment | 05-2011 | 25 KB | 76 KB | |||||||
| VA 23 73 00 Indoor Central-Station Air-Handling Units | 04-2011 | 46 KB | 90 KB | |||||||
| VA 23 74 13 Packaged, Outdoor, Central-Station Air-Handling Units | 04-2011 | 48 KB | 85 KB | |||||||
| VA 23 81 00 Decentralized Unitary HVAC Equipment | 02-2011 | 57 KB | 139 KB | |||||||
| VA 23 81 23 Computer-Room Air Conditioners | 04-2011 | 49 KB | 98 KB | |||||||
| VA 23 81 43 Air-Source Unitary Heat Pumps | 04-2011 | 23 KB | 62 KB | |||||||
| VA 23 81 46 Water-Source Unitary Heat Pumps | 04-2011 | 47 KB | 106 KB | |||||||
| VA 23 81 49 Ground-Source Heat Pumps | 01-2013 | 152 KB | 86 KB | |||||||
| VA 23 82 00 Convection Heating and Cooling Units | 04-2011 | 31 KB | 55 KB | |||||||
| VA 23 82 16 Air Coils | 04-2011 | 17 KB | 49 KB | |||||||
| VA 23 84 00 Humidity Control Equipment | 05-2011 | 38 KB | 96 KB | |||||||
| Division 25 - Integrated Automation | |||||||||
| VA 25 10 10 Advanced Utility Metering System | 02-2010 | 135 KB | 240 KB | |||||||
| Division 26 - Electrical | |||||||||
| VA 26 05 11 Requirements for Electrical Installations | 12-2012 | 145 KB | 60 KB | |||||||
| VA 26 05 13 Medium-Voltage Cables | 12-2012 | 165 KB | 60 KB | |||||||
| VA 26 05 19 Low-Voltage Electrical Power Conductors and Cables | 12-2012 | 84 KB | 63 KB | |||||||
| VA 26 05 26 Grounding and Bonding for Electrical Systems | 12-2012 | 164 KB | 60 KB | |||||||
| VA 26 05 33 Raceway and Boxes for Electrical Systems | 09-2010 | 30 KB | 64 KB | |||||||
| VA 26 05 36 Wireways for Radiology Equipment | 09-2010 | 15 KB | 41 KB | |||||||
| VA 26 05 39 Underfloor Raceways for Electrical Systems | 12-2012 | 117 KB | 45 KB | |||||||
| VA 26 05 41 Underground Electrical Construction | 12-2012 | 171 KB | 61 KB | |||||||
| VA 26 05 73 Overcurrent Protective Device Coordination Study | 12-2012 | 38 KB | 46 KB | |||||||
| VA 26 08 00 Commissioning of HVAC SystemsRevised | 06-2013 | 130 KB | 34 KB | |||||||
| VA 26 09 23 Lighting Controls | 09-2010 | 22 KB | 54 KB | |||||||
| VA 26 11 16 Secondary Unit Substations | 12-2012 | 185 KB | 67 KB | |||||||
| VA 26 12 19 Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers | 12-2012 | 197 KB | 77 KB | |||||||
| VA 26 13 13 Medium-Voltage Circuit Breaker Switchgear | 12-2012 | 189 KB | 86 KB | |||||||
| VA 26 13 16 Medium-Voltage Fusible Interrupter Switches | 12-2012 | 78 KB | 57 KB | |||||||
| VA 26 20 11 Isolated Power Systems | 12-2012 | 125 KB | 48 KB | |||||||
| VA 26 22 00 Low-Voltage Transformers | 12-2012 | 136 KB | 67 KB | |||||||
| VA 26 23 00 Low-Voltage Switchgear | 12-2012 | 233 KB | 80 KB | |||||||
| VA 26 23 13 Generator Paralleling Controls | 12-2012 | 95 KB | 58 KB | |||||||
| VA 26 24 13 Distribution Switchboards | 12-2012 | 129 KB | 68 KB | |||||||
| VA 26 24 16 Panelboards | 12-2012 | 132 KB | 51 KB | |||||||
| VA 26 24 19 Motor-Control Centers | 12-2012 | 140 KB | 53 KB | |||||||
| VA 26 25 11 Busways | 12-2012 | 131 KB | 52 KB | |||||||
| VA 26 26 00 Power Distribution Units for Uninterruptible Power Systems | 12-2012 | 132 KB | 54 KB | |||||||
| VA 26 27 26 Wiring Devices | 12-2012 | 141 KB | 50 KB | |||||||
| VA 26 29 11 Motor Starters | 12-2012 | 199 KB | 69 KB | |||||||
| VA 26 29 21 Disconnect Switches | 12-2012 | 118 KB | 46 KB | |||||||
| VA 26 32 13 Engine Generators | 12-2012 | 323 KB | 115 KB | |||||||
| VA 26 33 53 Static Uninterruptible Power Supply | 12-2012 | 142 KB | 75 KB | |||||||
| VA 26 35 26 Harmonic Filters | 12-2012 | 114 KB | 46 KB | |||||||
| VA 26 36 23 Automatic Transfer Switches | 12-2012 | 213 KB | 70 KB | |||||||
| VA 26 41 00 Facility Lightning Protection | 12-2012 | 127 KB | 49 KB | |||||||
| VA 26 42 00 Cathodic Protection | 12-2012 | 185 KB | 78 KB | |||||||
| VA 26 43 13 Transient-Voltage Surge Suppression | 12-2012 | 109 KB | 46 KB | |||||||
| VA 26 51 00 Interior Lighting | 12-2012 | 239 KB | 82 KB | |||||||
| VA 26 55 71 Medical and Surgical Lighting Fixtures | 09-2010 | 24 KB | 55 KB | |||||||
| VA 26 56 00 Exterior Lighting | 09-2010 | 35 KB | 71 KB | |||||||
| Division 27 - Communications | |||||||||
| VA 27 05 11 Requirements for Communications Installations | 11-2009 | 26 KB | 51 KB | |||||||
| VA 27 05 26 Grounding and Bonding for Communications Systems | 10-2006 | 89 KB | 94 KB | |||||||
| VA 27 05 33 Raceways and Boxes for Communications Systems | 12-2005 | 104 KB | 77 KB | |||||||
| VA 27 05 61 Leased Space, Communications Equipment and Systems | 02-2009 | 43 KB | 49 KB | |||||||
| VA 27 08 00 Commissioning of Communications SystemsRevised | 06-2013 | 129 KB | 33 KB | |||||||
| VA 27 10 00 Structured Cabling | 12-2005 | 38 KB | 44 KB | |||||||
| VA 27 11 00 Communications Equipment Room FittingsRevised | 06-2013 | 194 KB | 253 KB | |||||||
| VA 27 15 00 Communications Horizontal CablingRevised | 06-2013 | 284 KB | 395 KB | |||||||
| VA 27 31 00 Voice Communications Switching and Routing EquipmentRevised | 06-2013 | 245 KB | 258 KB | |||||||
| VA 27 31 31 Voice Communications Switching and Routing Equipment - ExtensionRevised | 06-2013 | 235 KB | 250 KB | |||||||
| VA 27 32 41 Two-Way Radio Equipment and SystemsRevised | 06-2013 | 230 KB | 294 KB | |||||||
| VA 27 41 31 Master Antenna Television Equipment and SystemsRevised | 06-2013 | 173 KB | 132 KB | |||||||
| VA 27 51 16 Public Address and Mass Notification SystemsRevised | 06-2013 | 239 KB | 253 KB | |||||||
| VA 27 51 23 Intercommunications and Program SystemsRevised | 06-2013 | 169 KB | 116 KB | |||||||
| VA 27 52 23 Nurse Call and Code Blue SystemsRevised | 06-2013 | 295 KB | 445 KB | |||||||
| VA 27 52 31 Security Emergency Call, Duress Alarm, and TelecommunicationsRevised | 06-2013 | 164 KB | 107 KB | |||||||
| VA 27 52 41 Miscellaneous Medical Systems | 12-2005 | 37 KB | 41 KB | |||||||
| VA 27 53 19 Distributed Radio Antenna (Within Building) Equipment and System | 09-2012 | 1.1 MB | 845 KB | |||||||
| Division 28 - Electronic Safety and Security | |||||||||
| VA 28 05 00 Common Work Results for Electronic Safety and Security | 09-2011 | 729 KB | 252 KB | |||||||
| VA 28 05 13 Conductors and Cables for Electronic Safety and Security | 09-2011 | 37 KB | 83 KB | |||||||
| VA 28 05 26 Grounding and Bonding for Electronic Safety and Security | 09-2011 | 74 KB | 77 KB | |||||||
| VA 28 05 28.33 Conduits and Backboxes for Electronic Safety and Security | 09-2011 | 152 KB | 84 KB | |||||||
| VA 28 08 00 Commissioning of Electronic Safety and Security SystemsRevised | 06-2013 | 130 KB | 33 KB | |||||||
| VA 28 13 00 Physical Access Control System | 10-2011 | 246 KB | 365 KB | |||||||
| VA 28 13 16 Physical Access Control System and Database Management | 09-2011 | 158 KB | 124 KB | |||||||
| VA 28 13 53 Security Access Detection | 09-2011 | 199 KB | 153 KB | |||||||
| VA 28 16 00 Intrusion Detection System | 10-2011 | 119 KB | 285 KB | |||||||
| VA 28 23 00 Video Surveillance | 09-2011 | 206 KB | 528 KB | |||||||
| VA 28 26 00 Electronic Personal Protection System (EPPS) | 09-2011 | 63 KB | 158 KB | |||||||
| VA 28 31 00 Fire Detection and Alarm | 10-2011 | 542 KB | 177 KB | |||||||
| SITE AND INFRASTRUCTURE SUBGROUP | |||||||||
| Division 31 - Earthwork | |||||||||
| VA 31 20 00 Earthwork | 10-2012 | 71 KB | 111 KB | |||||||
| VA 31 20 11 Earthwork (Short Form) | 10-2012 | 59 KB | 93 KB | |||||||
| VA 31 23 19 Dewatering | 10-2012 | 24 KB | 72 KB | |||||||
| VA 31 23 23.33 Flowable Fill | 10-2012 | 29 KB | 50 KB | |||||||
| VA 31 32 23 Pressure Grouting Soil Stabilization | 10-2012 | 20 KB | 39 KB | |||||||
| VA 31 62 00 Driven Piles | 10-2012 | 53 KB | 87 KB | |||||||
| VA 31 63 16 Auger Cast Grout Piles | 10-2012 | 50 KB | 77 KB | |||||||
| VA 31 63 26 Drilled Caissons | 10-2012 | 40 KB | 67 KB | |||||||
| Division 32 - Exterior Improvements | |||||||||
| VA 32 05 23 Cement and Concrete for Exterior ImprovementsRevised | 05-2013 | 267 KB | 107 KB | |||||||
| VA 32 12 16 Asphalt Paving | 10-2009 | 16 KB | 48 KB | |||||||
| VA 32 14 16 Brick Unit Paving | 04-2010 | 8 KB | 28 KB | |||||||
| VA 32 17 23 Pavement Markings | 04-2010 | 18 KB | 35 KB | |||||||
| VA 32 31 13 Chain Link Fences and GatesRevised | 05-2013 | 167 KB | 52 KB | |||||||
| VA 32 31 53 Perimeter Security Fences and GatesRevised | 05-2013 | 123 KB | 38 KB | |||||||
| VA 32 84 00 Planting Irrigation | 10-2011 | 253 KB | 113 KB | |||||||
| VA 32 90 00 Planting | 10-2011 | 378 KB | 152 KB | |||||||
| Division 33 - Utilities | |||||||||
| VA 33 08 00 Commissioning of Site Utility SystemsRevised | 06-2013 | 109 KB | 34 KB | |||||||
| VA 33 10 00 Water UtilitiesRevised | 06-2013 | 312 KB | 123 KB | |||||||
| VA 33 30 00 Sanitary Sewerage UtilitiesRevised | 06-2013 | 216 KB | 107 KB | |||||||
| VA 33 40 00 Storm Drainage Utilities | 10-2011 | 281 KB | 118 KB | |||||||
| VA 33 46 13 Foundation Drainage | 10-2011 | 184 KB | 102 KB | |||||||
| VA 33 51 00 Natural-Gas Distribution | 10-2011 | 213 KB | 120 KB | |||||||
| VA 33 63 00 Steam Energy DistributionRevised | 06-2013 | 504 KB | 246 KB | |||||||
| Division 34 - Transportation | |||||||||
| VA 34 71 13 Vehicle Barriers | 05-2013 | 91 KB | 30 KB | |||||||
| VA 34 75 13.13 Active Vehicle Barriers | 05-2013 | 164 KB | 50 KB | |||||||
| Division 48 - Electrical Power Generation | |||||||||
| VA 48 14 00 Solar Energy Electrical Power Generation System | 01-2013 | 124 KB | 83 KB | |||||||
| VA 48 15 00 Wind Energy Electrical Power Generation System | 01-2013 | 105 KB | 62 KB | |||||||
| VA 48 16 23 Geothermal Energy - Electricity Generation System | 01-2013 | 107 KB | 82 KB | |||||||