Search CCB
UFGS Master Updated May 6, 2013; Posted May 16, 2013
As of June 2008, updated UFGS will be posted quarterly in February, May, August and November.
Unified Facilities Guide Specifications (UFGS) are a joint effort of the U.S. Army Corps of Engineers (USACE), the Naval Facilities Engineering Command (NAVFAC), the Air Force Civil Engineer Center (HQ AFCEC) and the National Aeronautics and Space Administration (NASA). UFGS are for use in specifying construction for the military services.
The Unified Facilities Guide Specifications (UFGS) are published only in electronic format and are intended to be used with SpecsIntact software. The UFGS Master uses the latest CSI MasterFormat, therefore, as of January 2012, the UFGS Working Group decided to discontinue support of MasterFormat 1995. SpecsIntact version 4.5.1 and above will support MasterFormat 2010 and will no longer support the creation of Jobs or Masters using the old MasterFormat 1995 UFGS Master. For backward compatibility, Masters or Jobs created with older versions can still be opened using the latest software versions.
NEW as of May 2013: The May 2013 release incorporates Automatic Paragraph Numbering. Versions of Specsintact older than 4.5.0 are not compatible with this feature. Existing jobs can be converted to the new automatic numbered format. The conversion is a one-way process. To convert, select the job or master, select process menu, choose convert Job/Master to Automatic numbering. More information about Automatic Paragraph Numbering is available on the Specsintact website.
For Specsintact Technical Support, please contact them directly:
Phone: 321-867-8800, E-mail, or visit their Website
In addition, the SpecsIntact Knowledge Base can be found on their website. This is the first resource recommended for those who encounter any problems while using SpecsIntact, including those having problems publishing to Word or PDF formats.
UFGS that have been unified for use by all participating agencies have a level 3 or level 4 MasterFormat™ number. UFGS that are agency-specific have a fifth level number indicating it as an agency specific specification. A specification that has a fifth level number "10" indicates USACE, a "20" indicates NAVFAC, a "30" indicates AFCEC, and a "40" indicates NASA. Preparing agencies are indicated in the UFGS header of each specification. Users of UFGS should first consider a unified UFGS if one is available, next a UFGS identified as specific to their agency and lastly a UFGS identified as specific to another agency.
Points of contact and procedures for the development and maintenance of UFGS documents are prescribed in the latest edition of MIL-STD-3007.
Section templates for MasterFormat 2010 and MasterFormat 1995: These templates are provided to assist the user in creating a new section.
Questions, comments, suggestions and recommended changes for guide specifications are welcome and should be submitted as a Criteria Change Request. To submit a Criteria Change Request, click on the CCR link next to the document below.
| Title | Date | Downloads | CCR | ||||||
|---|---|---|---|---|---|---|---|---|---|
| UFGS MASTERRevised | 05-16-2013 | 15.3 MB | |||||||
| UFGS in PDF - All sections combined into one document. | 05-2013 | 51.5 MB | |||||||
| UFGS Table of Contents | 05-2013 | 82 KB | |||||||
| UFGS Graphics Table of Contents (also includes NAVFAC Regional Specifications Graphics) | 05-2013 | 76 KB | |||||||
| Unified Master Reference List (UMRL) | 04-2013 | 509 KB | |||||||
| UFGS Listing of Revisions and Changes since last update | 05-2013 | 51 KB | |||||||
| UFGS Listing of Revisions, April 2006 to present | 05-2013 | 318 KB | |||||||
| UFGS Master Database Tracking Chart: This document identifies which UFGS sections are currently being edited and at what stage of the review cycle each section is. | 05-2013 | 209 KB | |||||||
| PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP | |||||||||
| Division 00 - Procurement and Contracting Requirements | 05-2013 | 56 KB | |||||||
| UFGS 00 01 15 List of Drawings | 02-2011 | 21 KB | 2 KB | |||||||
| UFGS 00 22 13 Supplementary Instructions to Bidders | 05-2011 | 31 KB | 5 KB | |||||||
| UFGS 00 31 10 Metric Measurements | 04-2006 | 26 KB | 4 KB | |||||||
| UFGS 00 41 00 Bid Schedules | 01-2007 | 78 KB | 6 KB | |||||||
| UFGS 00 73 01 Supplementary Conditions for Guantanamo Bay Projects | 08-2008 | 54 KB | 13 KB | |||||||
| UFGS 00 73 03 Supplementary Conditions for Azores Projects | 08-2008 | 52 KB | 12 KB | |||||||
| UFGS 00 73 04 Supplementary Conditions for Projects in Mediterranean Area | 08-2008 | 52 KB | 11 KB | |||||||
| SPECIFICATIONS GROUP | |||||||||
| GENERAL REQUIREMENTS SUBGROUP | |||||||||
| Division 01 - General Requirements | 05-2013 | 551 KB | |||||||
| UFGS 01 11 00 Summary of Work | 08-2011 | 43 KB | 9 KB | |||||||
| UFGS 01 14 00 Work Restrictions | 11-2011 | 119 KB | 33 KB | |||||||
| UFGS 01 20 00.00 20 Price and Payment Procedures | 11-2011 | 34 KB | 7 KB | |||||||
| UFGS 01 20 01.00 10 Cost and Performance Report | 04-2006 | 37 KB | 7 KB | |||||||
| UFGS 01 22 00.00 10 Measurement and Payment | 04-2006 | 33 KB | 5 KB | |||||||
| UFGS 01 30 00 Administrative Requirements | 11-2011 | 41 KB | 9 KB | |||||||
| UFGS 01 32 01.00 10 Project Schedule | 08-2008 | 62 KB | 15 KB | |||||||
| UFGS 01 32 16.00 20 Construction Progress Documentation | 11-2009 | 35 KB | 3 KB | |||||||
| UFGS 01 32 17.00 20 Network Analysis Schedules (NAS) | 08-2010 | 41 KB | 9 KB | |||||||
| UFGS 01 33 00 Submittal Procedures | 05-2011 | 85 KB | 21 KB | |||||||
| UFGS 01 33 23.33 Aviation Fuel System Submittal Requirements | 02-2010 | 24 KB | 3 KB | |||||||
| UFGS 01 33 29 LEED(TM) Documentation | 05-2012 | 41 KB | 7 KB | |||||||
| UFGS 01 35 13 Special Project Procedures | 11-2011 | 44 KB | 10 KB | |||||||
| UFGS 01 35 26 Governmental Safety Requirements | 02-2012 | 101 KB | 27 KB | |||||||
| UFGS 01 35 29.13 Health, Safety, and Emergency Response Procedures for Contaminated Sites | 01-2008 | 89 KB | 23 KB | |||||||
| UFGS 01 35 40.00 20 Environmental Management | 02-2010 | 48 KB | 10 KB | |||||||
| UFGS 01 35 45.00 10 Chemical Data Quality Control | 04-2006 | 60 KB | 14 KB | |||||||
| UFGS 01 42 00 Sources for Reference Publications | 08-2010 | 97 KB | 24 KB | |||||||
| UFGS 01 45 00.00 10 Quality Control | 02-2010 | 49 KB | 11 KB | |||||||
| UFGS 01 45 00.00 20 Quality Control | 11-2011 | 84 KB | 21 KB | |||||||
| UFGS 01 45 00.00 40 Quality Control | 05-2012 | 33 KB | 6 KB | |||||||
| UFGS 01 45 00.10 10 Quality Control System (QCS) | 02-2010 | 35 KB | 7 KB | |||||||
| UFGS 01 45 00.10 20 Quality Control for Minor Construction | 02-2010 | 43 KB | 9 KB | |||||||
| UFGS 01 45 35 Special Inspections | 08-2008 | 41 KB | 8 KB | |||||||
| UFGS 01 50 00 Temporary Construction Facilities and Controls | 08-2009 | 73 KB | 19 KB | |||||||
| UFGS 01 57 16 Temporary Pest Control | 04-2008 | 31 KB | 5 KB | |||||||
| UFGS 01 57 19.00 20 Temporary Environmental Controls | 11-2011 | 99 KB | 26 KB | |||||||
| UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls | 02-2010 | 71 KB | 14 KB | |||||||
| UFGS 01 57 19.02 Temporary Environmental Controls (GTMO) | 01-2008 | 66 KB | 16 KB | |||||||
| UFGS 01 57 20.00 10 Environmental Protection | 04-2006 | 81 KB | 20 KB | |||||||
| UFGS 01 57 23 Temporary Storm Water Pollution | 04-2008 | 57 KB | 13 KB | |||||||
| UFGS 01 58 00 Project Identification | 08-2009 | 39 KB | 7 KB | |||||||
| UFGS 01 62 35 Recycled/Recovered/Biobased Materials | 05-2013 | 27 KB | 5 KB | |||||||
| UFGS 01 73 19 Installation of Government-Furnished Medical Equipment | 04-2006 | 26 KB | 3 KB | |||||||
| UFGS 01 74 19 Construction and Demolition Waste Management | 01-2007 | 37 KB | 7 KB | |||||||
| UFGS 01 75 00 Starting and Adjusting | 05-2012 | 30 KB | 4 KB | |||||||
| UFGS 01 78 00 Closeout Submittals | 08-2011 | 61 KB | 15 KB | |||||||
| UFGS 01 78 23 Operation and Maintenance Data | 07-2006 | 41 KB | 7 KB | |||||||
| UFGS 01 78 23.33 Operation and Maintenance Manuals for Aviation Fuel Systems | 02-2010 | 51 KB | 9 KB | |||||||
| UFGS 01 78 24.00 20 Facility Electronic Operation and Maintenance Support Information (eOMSI) | 08-2012 | 77 KB | 18 KB | |||||||
| UFGS 01 83 00.07 40 Reliability Centered Acceptance for Facility Shells | 02-2012 | 39 KB | 7 KB | |||||||
| UFGS 01 83 13.07 40 Reliability Centered Acceptance for Superstructure Performance Requirements | 02-2012 | 40 KB | 7 KB | |||||||
| UFGS 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems | 02-2012 | 60 KB | 10 KB | |||||||
| UFGS 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems | 02-2012 | 68 KB | 11 KB | |||||||
| UFGS 01 91 00.00 40 Commissioning | 11-2012 | 51 KB | 10 KB | |||||||
| FACILITY CONSTRUCTION SUBGROUP | |||||||||
| Division 02 - Existing Conditions | 05-2013 | 575 KB | |||||||
| UFGS 02 01 50 Operation, Maintenance and Process Monitoring for Soil Vapor Extraction (SVE) Systems | 05-2010 | 83 KB | 19 KB | |||||||
| UFGS 02 32 00 Subsurface Drilling, Sampling, and Testing | 05-2010 | 86 KB | 20 KB | |||||||
| UFGS 02 35 27 Soil-Bentonite (S-B) Slurry Trench | 05-2010 | 77 KB | 18 KB | |||||||
| UFGS 02 41 00 [Demolition] [and] [Deconstruction] | 05-2010 | 78 KB | 20 KB | |||||||
| UFGS 02 42 51 Carpet Removal and Reclamation | 02-2012 | 30 KB | 5 KB | |||||||
| UFGS 02 42 91 Removal and Salvage of Historic Building Materials | 05-2010 | 28 KB | 4 KB | |||||||
| UFGS 02 51 13 Precipitation/Coagulation/Flocculation Water Treatment | 05-2010 | 116 KB | 30 KB | |||||||
| UFGS 02 53 13 Remediation of Contaminated Soils and Sludges By Incineration | 05-2010 | 100 KB | 22 KB | |||||||
| UFGS 02 53 16 Remediation of Contaminated Soils By Thermal Desorption | 02-2010 | 79 KB | 18 KB | |||||||
| UFGS 02 54 20 Bioremediation of Soils Using Landfarming Systems | 02-2010 | 156 KB | 42 KB | |||||||
| UFGS 02 54 21 Bioremediation of Soils Using Windrow Composting | 02-2010 | 132 KB | 34 KB | |||||||
| UFGS 02 54 23 Soil Washing Through Separation/Solubilization | 02-2010 | 102 KB | 24 KB | |||||||
| UFGS 02 55 00 Solidification/Stabilization (S/S) of Contaminated Material | 02-2010 | 49 KB | 10 KB | |||||||
| UFGS 02 56 13 Waste Containment Geomembrane | 02-2010 | 77 KB | 16 KB | |||||||
| UFGS 02 56 14 Clay Barrier Layer | 02-2010 | 53 KB | 11 KB | |||||||
| UFGS 02 56 15 Geosynthetic Clay Liner (GCL) | 02-2010 | 52 KB | 11 KB | |||||||
| UFGS 02 61 13 Excavation and Handling of Contaminated Material | 02-2010 | 62 KB | 13 KB | |||||||
| UFGS 02 61 23 Removal and Disposal of PCB Contaminated Soils | 04-2006 | 54 KB | 12 KB | |||||||
| UFGS 02 62 16 Commissioning and Demonstration for Soil Vapor Extraction (SVE) Systems | 02-2010 | 76 KB | 15 KB | |||||||
| UFGS 02 65 00 Underground Storage Tank Removal | 02-2010 | 119 KB | 30 KB | |||||||
| UFGS 02 66 00 Select Fill and Topsoil for Landfill Cover | 02-2010 | 42 KB | 8 KB | |||||||
| UFGS 02 66 10 Test Fill | 02-2010 | 41 KB | 7 KB | |||||||
| UFGS 02 81 00 Transportation and Disposal of Hazardous Materials | 02-2010 | 57 KB | 12 KB | |||||||
| UFGS 02 82 14.00 10 Asbestos Hazard Control Activities | 02-2010 | 164 KB | 45 KB | |||||||
| UFGS 02 82 16.00 20 Engineering Control of Asbestos Containing Materials | 08-2011 | 103 KB | 24 KB | |||||||
| UFGS 02 82 33.13 20 Removal/Control and Disposal of Paint with Lead | 08-2011 | 79 KB | 18 KB | |||||||
| UFGS 02 83 13.00 20 Lead in Construction | 08-2011 | 73 KB | 17 KB | |||||||
| UFGS 02 83 19.00 10 Lead Based Paint Hazard Abatement, Target Housing and Child Occupied Facilities | 02-2010 | 54 KB | 11 KB | |||||||
| UFGS 02 84 16 Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury | 04-2006 | 41 KB | 7 KB | |||||||
| UFGS 02 84 33 Removal and Disposal of Polychlorinated Biphenyls (PCBs) | 04-2006 | 53 KB | 11 KB | |||||||
| UFGS 02 85 00.00 20 Mold Remediation | 05-2011 | 95 KB | 24 KB | |||||||
| Division 03 - Concrete | 05-2013 | 707 KB | |||||||
| UFGS 03 01 30.71 Concrete Rehabilitation | 04-2006 | 42 KB | 7 KB | |||||||
| UFGS 03 01 30 Restoration of Concrete in Historic Structures | 11-2009 | 81 KB | 20 KB | |||||||
| UFGS 03 01 32 Concrete Rehabilitation for Civil Works | 11-2009 | 198 KB | 48 KB | |||||||
| UFGS 03 11 13.00 10 Structural Cast-In-Place Concrete Forming | 08-2010 | 47 KB | 10 KB | |||||||
| UFGS 03 11 19.00 10 Insulating Concrete Forming | 02-2012 | 45 KB | 9 KB | |||||||
| UFGS 03 15 00.00 10 Concrete Accessories | 08-2010 | 50 KB | 11 KB | |||||||
| UFGS 03 20 00.00 10 Concrete Reinforcing | 08-2010 | 56 KB | 12 KB | |||||||
| UFGS 03 23 00 Steel Stressing Tendons and Accessories for Prestressed Concrete | 11-2009 | 40 KB | 8 KB | |||||||
| UFGS 03 30 00.00 10 Cast-In-Place Concrete | 11-2010 | 159 KB | 42 KB | |||||||
| UFGS 03 30 00 Cast-In-Place Concrete | 11-2011 | 233 KB | 60 KB | |||||||
| UFGS 03 30 53 Miscellaneous Cast-In-Place Concrete | 04-2008 | 78 KB | 18 KB | |||||||
| UFGS 03 31 01.00 10 Cast-In-Place Structural Concrete for Civil Works | 11-2010 | 127 KB | 32 KB | |||||||
| UFGS 03 31 29 Marine Concrete | 08-2012 | 188 KB | 51 KB | |||||||
| UFGS 03 33 00 Cast-In-Place Architectural Concrete | 11-2009 | 30 KB | 4 KB | |||||||
| UFGS 03 35 00.00 10 Concrete Finishing | 11-2010 | 73 KB | 18 KB | |||||||
| UFGS 03 37 00 Preplaced-Aggregate Concrete | 11-2009 | 113 KB | 28 KB | |||||||
| UFGS 03 37 13 Shotcrete | 11-2009 | 61 KB | 13 KB | |||||||
| UFGS 03 37 23 Roller-Compacted Concrete for Mass Concrete Construction | 11-2009 | 190 KB | 51 KB | |||||||
| UFGS 03 37 29 Concrete for Concrete Cutoff Walls | 11-2009 | 106 KB | 26 KB | |||||||
| UFGS 03 39 00.00 10 Concrete Curing | 11-2010 | 39 KB | 7 KB | |||||||
| UFGS 03 40 00.00 10 Plant-Precast Concrete Products for Below Grade Construction | 08-2006 | 63 KB | 13 KB | |||||||
| UFGS 03 41 16.08 Precast Concrete Slabs (MAX. SPAN 8'- 0" O.C.) | 08-2012 | 50 KB | 9 KB | |||||||
| UFGS 03 41 33 Precast Structural Pretensioned Concrete | 02-2011 | 121 KB | 25 KB | |||||||
| UFGS 03 44 00 Reinforced Autoclave Aerated Concrete Panels | 02-2013 | 83 KB | 17 KB | |||||||
| UFGS 03 45 00 Precast Architectural Concrete | 11-2011 | 130 KB | 30 KB | |||||||
| UFGS 03 45 33 Precast [Prestressed] Structural Concrete | 04-2008 | 79 KB | 18 KB | |||||||
| UFGS 03 47 13 Tilt-Up Concrete | 08-2008 | 41 KB | 7 KB | |||||||
| UFGS 03 51 01 Precast Roof Decks | 01-2008 | 29 KB | 5 KB | |||||||
| UFGS 03 52 00 Lightweight Concrete Roof Insulation | 08-2011 | 41 KB | 7 KB | |||||||
| UFGS 03 52 16.19 Lightweight Insulation Concrete Overlay | 08-2011 | 41 KB | 7 KB | |||||||
| UFGS 03 52 16 Lightweight Insulation Concrete | 04-2008 | 35 KB | 6 KB | |||||||
| UFGS 03 53 14.00 20 Light Reflective Nonferrous Metallic Aggregate Floor System | 02-2010 | 33 KB | 6 KB | |||||||
| UFGS 03 55 16 Gypsum Concrete Floor Planks | 04-2008 | 30 KB | 5 KB | |||||||
| UFGS 03 62 16 Metallic Non-Shrink Grouting | 02-2012 | 28 KB | 4 KB | |||||||
| UFGS 03 70 00 Mass Concrete | 02-2010 | 212 KB | 54 KB | |||||||
| Division 04 - Masonry | 05-2013 | 146 KB | |||||||
| UFGS 04 01 00.91 Restoration and Cleaning of Masonry in Historic Structures | 05-2012 | 102 KB | 27 KB | |||||||
| UFGS 04 01 20 Rehabilitation of Reinforced and Unreinforced Masonry Walls Using FRP Composite Structural Repointing | 10-2007 | 68 KB | 16 KB | |||||||
| UFGS 04 01 21 Rehabilitation of Reinforced and Unreinforced Masonry Walls Using Surface Applied FRP Composites | 10-2007 | 79 KB | 19 KB | |||||||
| UFGS 04 20 00 Masonry | 02-2011 | 179 KB | 47 KB | |||||||
| UFGS 04 21 13.13 Nonbearing Masonry Veneer/Steel Stud Walls | 10-2007 | 82 KB | 20 KB | |||||||
| UFGS 04 21 26 Glazed Structural Clay Tile and Prefaced Concrete Masonry Units | 11-2009 | 39 KB | 7 KB | |||||||
| UFGS 04 23 00 Glass Masonry Units | 11-2009 | 34 KB | 6 KB | |||||||
| Division 05 - Metals | 05-2013 | 238 KB | |||||||
| UFGS 05 05 23.13 10 Ultrasonic Inspection of Weldments | 11-2008 | 72 KB | 16 KB | |||||||
| UFGS 05 05 23 Welding, Structural | 11-2008 | 53 KB | 10 KB | |||||||
| UFGS 05 12 00 Structural Steel | 11-2011 | 82 KB | 18 KB | |||||||
| UFGS 05 14 00.13 Welding Structural Aluminum Framing | 11-2010 | 36 KB | 6 KB | |||||||
| UFGS 05 21 13 Deep Longspan Steel Joist Framing | 08-2009 | 32 KB | 5 KB | |||||||
| UFGS 05 21 16 Longspan Steel Joist Framing | 08-2009 | 32 KB | 5 KB | |||||||
| UFGS 05 21 19 Open Web Steel Joist Framing | 07-2007 | 30 KB | 4 KB | |||||||
| UFGS 05 21 23 Steel Joist Girder Framing | 07-2007 | 30 KB | 4 KB | |||||||
| UFGS 05 30 00 Steel Decks | 11-2011 | 85 KB | 19 KB | |||||||
| UFGS 05 40 00 Cold-Formed Metal Framing | 05-2010 | 47 KB | 9 KB | |||||||
| UFGS 05 50 13 Miscellaneous Metal Fabrications | 05-2010 | 73 KB | 17 KB | |||||||
| UFGS 05 50 14 Structural Metal Fabrications | 11-2008 | 88 KB | 22 KB | |||||||
| UFGS 05 50 15 Civil Works Fabrications | 08-2008 | 74 KB | 16 KB | |||||||
| UFGS 05 51 00 Metal Stairs | 02-2012 | 57 KB | 11 KB | |||||||
| UFGS 05 51 33 Metal Ladders | 05-2010 | 38 KB | 7 KB | |||||||
| UFGS 05 52 00 Metal Railings | 02-2011 | 53 KB | 10 KB | |||||||
| UFGS 05 59 10 Rolling Cover for Aviation Refueling Vaults | 02-2010 | 43 KB | 9 KB | |||||||
| UFGS 05 59 13 Fabrication of Hydraulic Steel Structures | 08-2009 | 103 KB | 28 KB | |||||||
| UFGS 05 72 00 Decorative Metal Specialties | 02-2012 | 58 KB | 11 KB | |||||||
| Division 06 - Wood, Plastics and Composites | 05-2013 | 124 KB | |||||||
| UFGS 06 10 00 Rough Carpentry | 02-2012 | 152 KB | 36 KB | |||||||
| UFGS 06 13 33 Pier Timberwork | 04-2006 | 41 KB | 8 KB | |||||||
| UFGS 06 18 00 Glue-Laminated Construction | 05-2009 | 40 KB | 7 KB | |||||||
| UFGS 06 20 00 Finish Carpentry | 02-2012 | 73 KB | 16 KB | |||||||
| UFGS 06 41 16.00 10 Laminate Clad Architectural Casework | 08-2010 | 73 KB | 16 KB | |||||||
| UFGS 06 61 16 Solid Polymer (Solid Surfacing) Fabrications | 08-2010 | 62 KB | 13 KB | |||||||
| UFGS 06 71 33 Fiberglass Reinforced Plastic (FRP) Ladders | 05-2012 | 41 KB | 8 KB | |||||||
| UFGS 06 73 01 Fiberglass Reinforced Plastic (FRP) Grating | 02-2012 | 37 KB | 7 KB | |||||||
| UFGS 06 82 14 Fiberglass Reinforced Plastic (FRP) Pipe and Tube Railings | 05-2012 | 46 KB | 9 KB | |||||||
| Division 07 - Thermal and Moisture Protection | 05-2013 | 529 KB | |||||||
| UFGS 07 08 27.00 10 Building Air Barrier System Testing for Commissioning | 02-2013 | 61 KB | 14 KB | |||||||
| UFGS 07 11 13 Bituminous Dampproofing | 08-2011 | 35 KB | 6 KB | |||||||
| UFGS 07 12 00 Built-Up Bituminous Waterproofing | 04-2006 | 50 KB | 10 KB | |||||||
| UFGS 07 13 53 Elastomeric Sheet Waterproofing | 04-2006 | 46 KB | 9 KB | |||||||
| UFGS 07 14 00 Fluid-Applied Waterproofing | 02-2012 | 48 KB | 10 KB | |||||||
| UFGS 07 16 19 Metallic Oxide Waterproofing | 01-2007 | 39 KB | 7 KB | |||||||
| UFGS 07 17 00 Bentonite Waterproofing | 04-2006 | 27 KB | 4 KB | |||||||
| UFGS 07 19 00 Water Repellents | 05-2011 | 50 KB | 9 KB | |||||||
| UFGS 07 21 13 Board and Block Insulation | 05-2011 | 65 KB | 12 KB | |||||||
| UFGS 07 21 16 Mineral Fiber Blanket Insulation | 11-2011 | 44 KB | 9 KB | |||||||
| UFGS 07 21 23 Loose Fill Thermal Insulation | 05-2011 | 44 KB | 9 KB | |||||||
| UFGS 07 22 00 Roof and Deck Insulation | 08-2011 | 88 KB | 20 KB | |||||||
| UFGS 07 24 00 Exterior Insulation and Finish Systems | 05-2011 | 79 KB | 19 KB | |||||||
| UFGS 07 31 13 Asphalt Shingles | 11-2011 | 59 KB | 12 KB | |||||||
| UFGS 07 31 26 Slate Roofing | 08-2009 | 43 KB | 9 KB | |||||||
| UFGS 07 32 13 Roof Tiles | 04-2006 | 43 KB | 7 KB | |||||||
| UFGS 07 32 14 Clay Tile Roofing Replacement or Repair | 04-2006 | 52 KB | 10 KB | |||||||
| UFGS 07 41 13 Metal Roof Panels | 05-2011 | 111 KB | 28 KB | |||||||
| UFGS 07 41 63 Fabricated Roof Panel Assemblies | 05-2009 | 95 KB | 24 KB | |||||||
| UFGS 07 42 13 Metal Wall Panels | 05-2011 | 75 KB | 17 KB | |||||||
| UFGS 07 42 63 Fabricated Wall Panel Assemblies | 05-2011 | 76 KB | 17 KB | |||||||
| UFGS 07 51 13 Built-Up Asphalt Roofing | 05-2012 | 115 KB | 28 KB | |||||||
| UFGS 07 52 00 Modified Bituminous Membrane Roofing | 05-2012 | 131 KB | 34 KB | |||||||
| UFGS 07 53 23 Ethylene-Propylene-Diene-Monomer Roofing | 05-2012 | 100 KB | 24 KB | |||||||
| UFGS 07 54 19 Polyvinyl Chloride Roofing | 02-2013 | 91 KB | 23 KB | |||||||
| UFGS 07 55 00 Protected Membrane Roofing (PMR) | 08-2009 | 42 KB | 9 KB | |||||||
| UFGS 07 57 13 Sprayed Polyurethane Foam (SPF) Roofing | 05-2011 | 126 KB | 25 KB | |||||||
| UFGS 07 60 00 Flashing and Sheet Metal | 08-2008 | 103 KB | 20 KB | |||||||
| UFGS 07 61 01 Copper Roof System | 08-2009 | 40 KB | 8 KB | |||||||
| UFGS 07 61 14.00 20 Steel Standing Seam Roofing | 05-2011 | 76 KB | 19 KB | |||||||
| UFGS 07 61 15.00 20 Aluminum Standing Seam Roofing | 05-2011 | 74 KB | 18 KB | |||||||
| UFGS 07 62 10 Copper Sheet Metal Flashing | 08-2009 | 51 KB | 11 KB | |||||||
| UFGS 07 72 00 Roof Ventilators, Gravity-Type | 08-2009 | 32 KB | 5 KB | |||||||
| UFGS 07 81 00 Spray-Applied Fireproofing | 02-2011 | 52 KB | 10 KB | |||||||
| UFGS 07 84 00 Firestopping | 05-2010 | 40 KB | 8 KB | |||||||
| UFGS 07 92 00 Joint Sealants | 01-2007 | 48 KB | 9 KB | |||||||
| Division 08 - Openings | 05-2013 | 559 KB | |||||||
| UFGS 08 11 13 Steel Doors and Frames | 02-2010 | 58 KB | 12 KB | |||||||
| UFGS 08 11 16 Aluminum Doors and Frames | 08-2008 | 45 KB | 9 KB | |||||||
| UFGS 08 11 69 Metal Storm Doors | 02-2010 | 36 KB | 6 KB | |||||||
| UFGS 08 11 73 Sliding Fire Doors | 01-2007 | 42 KB | 8 KB | |||||||
| UFGS 08 13 73 Sliding Metal Doors | 02-2011 | 60 KB | 14 KB | |||||||
| UFGS 08 14 00 Wood Doors | 08-2011 | 54 KB | 11 KB | |||||||
| UFGS 08 22 20 Fiberglass Reinforced Plastic (FRP) Doors and Frames | 05-2009 | 52 KB | 11 KB | |||||||
| UFGS 08 32 13 Aluminum Sliding Glass Doors | 11-2008 | 37 KB | 7 KB | |||||||
| UFGS 08 33 13 Metal Rolling Counter Doors | 05-2009 | 37 KB | 7 KB | |||||||
| UFGS 08 33 23 Overhead Coiling Doors | 07-2007 | 64 KB | 14 KB | |||||||
| UFGS 08 34 01 Forced Entry Resistant Components | 08-2009 | 77 KB | 18 KB | |||||||
| UFGS 08 34 02 Bullet-Resistant Components | 08-2009 | 85 KB | 21 KB | |||||||
| UFGS 08 34 16.10 Steel Sliding Hangar Doors | 04-2006 | 68 KB | 15 KB | |||||||
| UFGS 08 34 16.20 Vertical Lift Fabric Doors | 10-2006 | 50 KB | 12 KB | |||||||
| UFGS 08 34 16 Corrosion Control Hangar Doors | 04-2006 | 90 KB | 25 KB | |||||||
| UFGS 08 34 19.10 20 Rolling Service [and Fire] Doors | 02-2012 | 45 KB | 9 KB | |||||||
| UFGS 08 34 49.00 20 Hemp Shielded Door | 04-2006 | 68 KB | 16 KB | |||||||
| UFGS 08 34 53 Security Doors and Frames | 08-2008 | 27 KB | 4 KB | |||||||
| UFGS 08 34 59 Vault Doors and Day Gates | 08-2008 | 30 KB | 5 KB | |||||||
| UFGS 08 34 63 Detention Hollow Metal Frames, Doors, and Door Frames | 05-2011 | 41 KB | 8 KB | |||||||
| UFGS 08 34 73 Sound Control Door Assemblies | 05-2012 | 59 KB | 12 KB | |||||||
| UFGS 08 36 13 Sectional Overhead Doors | 08-2011 | 45 KB | 9 KB | |||||||
| UFGS 08 36 19 Vertical Lift Doors | 11-2011 | 41 KB | 8 KB | |||||||
| UFGS 08 39 53 Blast Resistant Doors (Oval Arch Magazines) | 04-2006 | 38 KB | 7 KB | |||||||
| UFGS 08 39 54 Blast Resistant Doors | 08-2009 | 90 KB | 20 KB | |||||||
| UFGS 08 41 13 Aluminum-Framed Entrances and Storefronts | 02-2011 | 47 KB | 9 KB | |||||||
| UFGS 08 44 00 Curtain Wall and Glazed Assemblies | 08-2011 | 143 KB | 36 KB | |||||||
| UFGS 08 51 13 Aluminum Windows | 05-2011 | 83 KB | 19 KB | |||||||
| UFGS 08 51 23 Steel Windows | 08-2011 | 66 KB | 15 KB | |||||||
| UFGS 08 51 69.10 Aluminum Storm Windows | 04-2006 | 30 KB | 5 KB | |||||||
| UFGS 08 52 00 Wood Windows | 08-2011 | 51 KB | 10 KB | |||||||
| UFGS 08 52 70 Wood Windows - Repair and Rehabilitation | 08-2009 | 38 KB | 7 KB | |||||||
| UFGS 08 53 00 Plastic Windows | 08-2011 | 56 KB | 12 KB | |||||||
| UFGS 08 56 46.10 20 Radio Frequency Shielded Enclosures, Demountable Type | 08-2011 | 59 KB | 13 KB | |||||||
| UFGS 08 56 46.20 20 Radio Frequency Shielded Enclosures, Welded Type | 08-2011 | 63 KB | 15 KB | |||||||
| UFGS 08 56 53 Blast Resistant Tempered Glass Windows | 08-2011 | 54 KB | 10 KB | |||||||
| UFGS 08 56 63 Detention and Security Windows | 04-2006 | 33 KB | 5 KB | |||||||
| UFGS 08 60 45 [Skylights] [and] [Translucent Panels] | 02-2012 | 56 KB | 13 KB | |||||||
| UFGS 08 71 00 Door Hardware | 08-2008 | 73 KB | 16 KB | |||||||
| UFGS 08 71 63.10 Electrical Locking Control for Brigs | 04-2006 | 58 KB | 13 KB | |||||||
| UFGS 08 71 63 Detention Hardware | 04-2006 | 57 KB | 9 KB | |||||||
| UFGS 08 81 00 Glazing | 08-2011 | 96 KB | 22 KB | |||||||
| UFGS 08 87 16 Fragment Retention Film for Glass | 08-2009 | 43 KB | 9 KB | |||||||
| UFGS 08 88 53 Detention and Security Glazing | 05-2011 | 34 KB | 5 KB | |||||||
| UFGS 08 91 00 Metal [Wall] [and] [Door] Louvers | 05-2011 | 36 KB | 6 KB | |||||||
| Division 09 - Finishes | 05-2013 | 700 KB | |||||||
| UFGS 09 06 90 Color Schedule | 05-2009 | 42 KB | 5 KB | |||||||
| UFGS 09 22 00 Supports for Plaster and Gypsum Board | 02-2010 | 30 KB | 4 KB | |||||||
| UFGS 09 22 36 Lath | 01-2008 | 36 KB | 6 KB | |||||||
| UFGS 09 23 00 Gypsum Plastering | 08-2010 | 57 KB | 11 KB | |||||||
| UFGS 09 23 82 Fireproof Gypsum Plastering | 05-2010 | 27 KB | 4 KB | |||||||
| UFGS 09 24 23 Stucco | 05-2009 | 39 KB | 7 KB | |||||||
| UFGS 09 26 00 Veneer Plaster | 05-2011 | 43 KB | 8 KB | |||||||
| UFGS 09 29 00 Gypsum Board | 05-2011 | 74 KB | 15 KB | |||||||
| UFGS 09 30 00 Ceramic Tile, Quarry Tile and Paver Tile | 08-2010 | 62 KB | 13 KB | |||||||
| UFGS 09 35 16 Chemical-Resistant Quarry Tile | 08-2010 | 37 KB | 7 KB | |||||||
| UFGS 09 51 00 Acoustical Ceilings | 08-2010 | 70 KB | 16 KB | |||||||
| UFGS 09 62 38 Static-Control Flooring | 11-2012 | 62 KB | 13 KB | |||||||
| UFGS 09 64 00 Portable (Demountable) Wood Flooring | 08-2010 | 40 KB | 7 KB | |||||||
| UFGS 09 64 23 Wood Parquet Flooring | 08-2010 | 42 KB | 8 KB | |||||||
| UFGS 09 64 29 Wood Strip Flooring | 08-2010 | 40 KB | 8 KB | |||||||
| UFGS 09 64 66 Wood Athletic Flooring | 08-2010 | 66 KB | 14 KB | |||||||
| UFGS 09 65 00 Resilient Flooring | 08-2010 | 63 KB | 13 KB | |||||||
| UFGS 09 65 66 Resilient Athletic Flooring | 08-2010 | 42 KB | 8 KB | |||||||
| UFGS 09 66 13 Portland Cement Terrazzo | 08-2010 | 36 KB | 6 KB | |||||||
| UFGS 09 66 16 Terrazzo Tile | 08-2010 | 34 KB | 6 KB | |||||||
| UFGS 09 66 23 Resinous Terrazzo Flooring | 08-2010 | 33 KB | 6 KB | |||||||
| UFGS 09 67 23.13 Standard Resinous Flooring | 08-2010 | 54 KB | 10 KB | |||||||
| UFGS 09 67 23.14 Chemical Resistive Resinous Flooring | 08-2010 | 57 KB | 11 KB | |||||||
| UFGS 09 67 23.15 Fuel Resistive Resinous Flooring, 3-Coat System | 08-2010 | 97 KB | 19 KB | |||||||
| UFGS 09 67 23.16 Fuel Resistive Resinous Flooring, 5-Coat System | 08-2010 | 115 KB | 23 KB | |||||||
| UFGS 09 68 00 Carpet | 05-2010 | 60 KB | 14 KB | |||||||
| UFGS 09 69 13 Rigid Grid Access Flooring | 11-2010 | 87 KB | 21 KB | |||||||
| UFGS 09 69 19 Stringerless Access Flooring | 11-2010 | 81 KB | 20 KB | |||||||
| UFGS 09 72 00 Wallcoverings | 11-2012 | 54 KB | 11 KB | |||||||
| UFGS 09 83 13 Acoustical Wall Treatment | 08-2010 | 32 KB | 5 KB | |||||||
| UFGS 09 90 00 Paints and Coatings | 05-2011 | 193 KB | 41 KB | |||||||
| UFGS 09 96 00 High-Performance Coatings | 07-2007 | 49 KB | 9 KB | |||||||
| UFGS 09 96 59 High-Build Glaze Coatings | 05-2011 | 42 KB | 8 KB | |||||||
| UFGS 09 97 01.00 10 Metallizing: Hydraulic Structures | 05-2009 | 91 KB | 23 KB | |||||||
| UFGS 09 97 02 Painting: Hydraulic Structures | 11-2009 | 231 KB | 60 KB | |||||||
| UFGS 09 97 13.00 40 Steel Coatings | 07-2007 | 40 KB | 8 KB | |||||||
| UFGS 09 97 13.15 Epoxy/Fluoropolyurethane Interior Coating of Welded Steel Petroleum Fuel Tanks | 02-2010 | 143 KB | 33 KB | |||||||
| UFGS 09 97 13.16 Interior Coating of Welded Steel Water Tanks | 05-2011 | 156 KB | 31 KB | |||||||
| UFGS 09 97 13.17 Three Coat Epoxy Interior Coating of Welded Steel Petroleum Fuel Tanks | 02-2010 | 131 KB | 30 KB | |||||||
| UFGS 09 97 13.25 Maintenance, Repair, and Coating of Tall Antenna Towers | 05-2011 | 163 KB | 32 KB | |||||||
| UFGS 09 97 13.26 Coating of Steel Waterfront Structures | 04-2006 | 36 KB | 6 KB | |||||||
| UFGS 09 97 13.27 Exterior Coating of Steel Structures | 02-2010 | 131 KB | 31 KB | |||||||
| UFGS 09 97 13.28 Protection of Buried Steel Piping and Steel Bulkhead Tie Rods | 02-2010 | 38 KB | 6 KB | |||||||
| UFGS 09 97 23.13 Interior Lining For Concrete Storage Tanks (For Petroleum Fuels) | 05-2011 | 74 KB | 17 KB | |||||||
| UFGS 09 97 23.16 Linseed Oil Protection of Concrete Surfaces | 11-2010 | 24 KB | 3 KB | |||||||
| UFGS 09 97 23 Metallic Type Conductive/Spark Resistant Concrete Floor Finish | 04-2006 | 46 KB | 9 KB | |||||||
| UFGS 09 97 30 Preparation of Historic Wood and Metal Surfaces for Painting | 05-2009 | 43 KB | 9 KB | |||||||
| Division 10 - Specialties | 05-2013 | 154 KB | |||||||
| UFGS 10 10 00 Visual Communications Specialties | 02-2009 | 48 KB | 10 KB | |||||||
| UFGS 10 14 00.20 Interior Signage | 11-2012 | 58 KB | 13 KB | |||||||
| UFGS 10 14 01 Exterior Signage | 04-2006 | 59 KB | 13 KB | |||||||
| UFGS 10 21 13 Toilet Compartments | 01-2007 | 59 KB | 13 KB | |||||||
| UFGS 10 21 23.16 Cubicle Track and Hardware | 04-2006 | 29 KB | 4 KB | |||||||
| UFGS 10 22 13 Wire Mesh Partitions | 08-2010 | 36 KB | 5 KB | |||||||
| UFGS 10 22 19 Demountable Moveable Partitions | 08-2010 | 42 KB | 8 KB | |||||||
| UFGS 10 22 26.13 Accordion Folding Partitions | 08-2010 | 46 KB | 8 KB | |||||||
| UFGS 10 22 26.23 Coiling Partitions | 08-2010 | 45 KB | 8 KB | |||||||
| UFGS 10 22 39 Folding Panel Partitions | 05-2011 | 48 KB | 10 KB | |||||||
| UFGS 10 22 43 Sliding Partitions | 05-2011 | 48 KB | 10 KB | |||||||
| UFGS 10 26 13 Wall and Corner Guards | 08-2010 | 42 KB | 8 KB | |||||||
| UFGS 10 28 13 Toilet Accessories | 07-2006 | 51 KB | 11 KB | |||||||
| UFGS 10 44 16 Fire Extinguishers | 05-2012 | 35 KB | 5 KB | |||||||
| UFGS 10 51 13 Metal Lockers | 05-2011 | 40 KB | 6 KB | |||||||
| UFGS 10 56 13 Steel Shelving | 04-2006 | 29 KB | 4 KB | |||||||
| UFGS 10 71 13.13 Storm Shutters | 04-2006 | 49 KB | 8 KB | |||||||
| Division 11 - Equipment | 05-2013 | 255 KB | |||||||
| UFGS 11 05 40 Common Work Results for Foodservice Equipment | 08-2008 | 75 KB | 18 KB | |||||||
| UFGS 11 06 40.13 Foodservice Equipment Schedule | 01-2008 | 55 KB | 8 KB | |||||||
| UFGS 11 13 10 Dock Levelers | 08-2009 | 57 KB | 13 KB | |||||||
| UFGS 11 24 27 Air Stripper | 10-2007 | 77 KB | 19 KB | |||||||
| UFGS 11 27 13 Radiographic Darkroom Equipment | 04-2006 | 41 KB | 7 KB | |||||||
| UFGS 11 31 13 Electric Kitchen Equipment | 08-2008 | 37 KB | 7 KB | |||||||
| UFGS 11 41 11 Refrigerated and Frozen Food Storage Equipment | 01-2008 | 49 KB | 10 KB | |||||||
| UFGS 11 42 00 Food Preparation Equipment | 01-2008 | 34 KB | 5 KB | |||||||
| UFGS 11 44 00 Food Cooking Equipment | 01-2008 | 50 KB | 10 KB | |||||||
| UFGS 11 46 00 Food Dispensing Equipment | 01-2008 | 35 KB | 6 KB | |||||||
| UFGS 11 47 00 Ice Machines | 02-2009 | 32 KB | 5 KB | |||||||
| UFGS 11 48 00 Cleaning and Disposal Equipment | 01-2008 | 83 KB | 18 KB | |||||||
| UFGS 11 53 00 Laboratory Equipment and Fumehoods | 05-2011 | 50 KB | 9 KB | |||||||
| UFGS 11 68 13 Playground Equipment | 02-2009 | 71 KB | 16 KB | |||||||
| UFGS 11 70 00 General Requirements for Medical and Dental Equipment | 05-2011 | 39 KB | 8 KB | |||||||
| UFGS 11 71 00 Warming Cabinets, Sterilizers, and Associated Equipment | 02-2009 | 83 KB | 20 KB | |||||||
| UFGS 11 72 13 Medical Equipment, Miscellaneous | 04-2006 | 43 KB | 8 KB | |||||||
| UFGS 11 74 00 Dental Equipment | 04-2006 | 34 KB | 6 KB | |||||||
| UFGS 11 82 20 Incinerators, General Purpose | 08-2008 | 181 KB | 53 KB | |||||||
| Division 12 - Furnishings | 05-2013 | 163 KB | |||||||
| UFGS 12 21 00 Window Blinds | 08-2010 | 43 KB | 9 KB | |||||||
| UFGS 12 22 00 Curtains and Drapes | 08-2010 | 49 KB | 10 KB | |||||||
| UFGS 12 24 13 Roller Window Shades | 08-2010 | 39 KB | 8 KB | |||||||
| UFGS 12 31 00 Manufactured Metal Casework | 05-2009 | 69 KB | 15 KB | |||||||
| UFGS 12 32 00 Manufactured Wood Casework | 05-2009 | 62 KB | 11 KB | |||||||
| UFGS 12 34 00 Manufactured Plastic Casework | 05-2010 | 40 KB | 7 KB | |||||||
| UFGS 12 35 20 Foodservice Casework, Countertops and Accessories | 08-2010 | 45 KB | 8 KB | |||||||
| UFGS 12 35 70 Medical and Dental Casework | 08-2010 | 33 KB | 6 KB | |||||||
| UFGS 12 36 00.00 20 Manufactured Vanities | 08-2011 | 26 KB | 3 KB | |||||||
| UFGS 12 36 00 Countertops | 05-2009 | 52 KB | 10 KB | |||||||
| UFGS 12 48 13.13 Entrance Floor Mats | 02-2011 | 34 KB | 6 KB | |||||||
| UFGS 12 50 00 Furniture Systems | 02-2009 | 97 KB | 25 KB | |||||||
| UFGS 12 55 00 Detention Furniture and Accessories | 04-2006 | 29 KB | 5 KB | |||||||
| UFGS 12 65 00 Fixed Seating | 08-2008 | 50 KB | 11 KB | |||||||
| UFGS 12 93 00 Site Furnishings | 02-2009 | 91 KB | 20 KB | |||||||
| Division 13 - Special Construction | 05-2013 | 127 KB | |||||||
| UFGS 13 17 43 Hydrotherapy Equipment | 02-2011 | 32 KB | 5 KB | |||||||
| UFGS 13 21 26 Cold-Storage Rooms (Prefabricated Panel Type) | 04-2006 | 33 KB | 5 KB | |||||||
| UFGS 13 21 48 Prefabricated Audiometric Rooms | 04-2006 | 45 KB | 8 KB | |||||||
| UFGS 13 27 54.00 10 Electromagnetic (EM) Shielding | 10-2007 | 156 KB | 43 KB | |||||||
| UFGS 13 34 19 Metal Building Systems | 11-2011 | 115 KB | 28 KB | |||||||
| UFGS 13 48 00.00 10 Seismic Protection for Mechanical Equipment | 10-2007 | 47 KB | 9 KB | |||||||
| UFGS 13 48 00 Seismic Protection for Miscellaneous Equipment | 08-2008 | 53 KB | 11 KB | |||||||
| UFGS 13 49 19 X-Ray Shielding | 02-2009 | 61 KB | 13 KB | |||||||
| Division 14 - Conveying Equipment | 05-2013 | 91 KB | |||||||
| UFGS 14 21 00.00 20 Electric Traction Elevators | 05-2012 | 85 KB | 19 KB | |||||||
| UFGS 14 21 13 Electric Traction Freight Elevators | 02-2009 | 80 KB | 19 KB | |||||||
| UFGS 14 21 23 Electric Traction Passenger Elevators | 02-2009 | 84 KB | 19 KB | |||||||
| UFGS 14 24 00 Hydraulic Elevators | 08-2010 | 92 KB | 22 KB | |||||||
| UFGS 14 92 00 Pneumatic-Tube System | 02-2009 | 45 KB | 10 KB | |||||||
| FACILITY SERVICES SUBGROUP | |||||||||
| Division 21 - Fire Suppression | 05-2013 | 438 KB | |||||||
| UFGS 21 12 00 Standpipe Systems | 05-2011 | 63 KB | 13 KB | |||||||
| UFGS 21 13 00.00 40 Fire-Suppression Sprinkler Systems | 08-2010 | 91 KB | 22 KB | |||||||
| UFGS 21 13 13.00 10 Wet Pipe Sprinkler System, Fire Protection | 05-2009 | 90 KB | 22 KB | |||||||
| UFGS 21 13 13.00 20 Wet-Pipe Sprinkler System, Fire Protection | 04-2008 | 77 KB | 18 KB | |||||||
| UFGS 21 13 16.00 20 Dry-Pipe Fire Sprinkler Systems | 04-2006 | 58 KB | 14 KB | |||||||
| UFGS 21 13 17.00 10 Dry Pipe Sprinkler System, Fire Protection | 05-2009 | 85 KB | 21 KB | |||||||
| UFGS 21 13 18.00 10 Preaction and Deluge Sprinkler Systems, Fire Protection | 05-2009 | 105 KB | 27 KB | |||||||
| UFGS 21 13 19.00 20 [Deluge] [Preaction] Fire Sprinkler Systems | 11-2009 | 71 KB | 17 KB | |||||||
| UFGS 21 13 20.00 20 Foam Fire Extinguishing for Aircraft Hangars | 11-2009 | 123 KB | 31 KB | |||||||
| UFGS 21 13 21.00 20 Foam Fire Extinguishing for Fuel Tank Protection | 11-2009 | 121 KB | 30 KB | |||||||
| UFGS 21 13 22.00 20 Foam Fire Extinguishing for Haz/Flam Material Facility | 11-2009 | 127 KB | 32 KB | |||||||
| UFGS 21 13 24.00 10 Aqueous Film-Forming Foam (AFFF) Fire Protection System | 10-2007 | 105 KB | 28 KB | |||||||
| UFGS 21 13 26.00 40 Deluge Fire-Suppression Sprinkler Systems | 08-2010 | 70 KB | 17 KB | |||||||
| UFGS 21 21 00.00 40 Carbon-Dioxide Fire Extinguishing Systems | 08-2010 | 46 KB | 9 KB | |||||||
| UFGS 21 21 00 Fire Extinguishing Sprinkler Systems (Residential) | 04-2006 | 57 KB | 12 KB | |||||||
| UFGS 21 21 01.00 20 Carbon Dioxide Fire Extinguishing (High Pressure) | 11-2009 | 68 KB | 16 KB | |||||||
| UFGS 21 21 02.00 20 Carbon Dioxide Fire Extinguishing (Low Pressure) | 11-2009 | 83 KB | 20 KB | |||||||
| UFGS 21 21 03.00 10 Wet Chemical Fire Extinguishing System | 02-2009 | 35 KB | 6 KB | |||||||
| UFGS 21 22 00.00 20 Halon 1301 Fire Extinguishing | 05-2011 | 75 KB | 18 KB | |||||||
| UFGS 21 22 00.00 40 Clean Agent Fire Extinguishing Systems | 05-2013 | 71 KB | 10 KB | |||||||
| UFGS 21 23 00.00 20 Wet Chemical Fire Extinguishing for Kitchen Cabinet | 04-2006 | 37 KB | 7 KB | |||||||
| UFGS 21 30 00 Fire Pumps | 04-2008 | 119 KB | 31 KB | |||||||
| Division 22 - Plumbing | 05-2013 | 542 KB | |||||||
| UFGS 22 00 00 Plumbing, General Purpose | 11-2011 | 287 KB | 73 KB | |||||||
| UFGS 22 00 70 Plumbing, Healthcare Facilities | 11-2011 | 239 KB | 65 KB | |||||||
| UFGS 22 05 48.00 20 Mechanical Sound, Vibration, and Seismic Control | 04-2006 | 217 KB | 26 KB | |||||||
| UFGS 22 05 83.63 Cured-In Place Pipe (CIPP) Lining | 08-2010 | 37 KB | 7 KB | |||||||
| UFGS 22 07 19.00 40 Plumbing Piping Insulation | 02-2011 | 65 KB | 13 KB | |||||||
| UFGS 22 10 00.00 10 Vertical Pumps, Axial-Flow and Mixed-Flow Impeller-Type | 07-2007 | 152 KB | 41 KB | |||||||
| UFGS 22 11 23.00 10 Submersible Pump, Axial-Flow and Mixed-Flow Type | 07-2007 | 90 KB | 24 KB | |||||||
| UFGS 22 13 29 Sanitary Sewerage Pumps | 02-2011 | 96 KB | 20 KB | |||||||
| UFGS 22 13 36 Pneumatic Sewage Ejectors | 02-2009 | 44 KB | 9 KB | |||||||
| UFGS 22 14 29.00 40 Sump Pumps | 08-2011 | 60 KB | 12 KB | |||||||
| UFGS 22 15 09.00 40 General Service Compressed-Air Systems Cleaning Procedures | 02-2011 | 51 KB | 10 KB | |||||||
| UFGS 22 15 13.16 40 High-Pressure Compressed-Air Piping and Valves, Stainless | 02-2011 | 102 KB | 22 KB | |||||||
| UFGS 22 15 14.00 40 General Service Compressed-Air Systems, Low Pressure | 02-2011 | 103 KB | 27 KB | |||||||
| UFGS 22 15 19.13 20 Large Nonlubricated Reciprocating Air Compressors (Over 300 HP) | 11-2009 | 85 KB | 21 KB | |||||||
| UFGS 22 15 19.19 20 Nonlubricated Rotary Screw Air Compressors (100 HP and Larger) | 05-2011 | 83 KB | 21 KB | |||||||
| UFGS 22 15 26.00 20 High and Medium Pressure Compressed Air Piping | 04-2006 | 151 KB | 36 KB | |||||||
| UFGS 22 16 19.26 20 Large Centrifugal Air Compressors (Over 200 HP) | 11-2009 | 83 KB | 21 KB | |||||||
| UFGS 22 31 00 Water Softeners, Cation-Exchange (Sodium Cycle) | 02-2009 | 67 KB | 17 KB | |||||||
| UFGS 22 33 30.00 10 Solar Water Heating Equipment | 04-2008 | 91 KB | 22 KB | |||||||
| UFGS 22 60 70 Gas and Vacuum Systems for Healthcare Facilities | 05-2009 | 176 KB | 39 KB | |||||||
| UFGS 22 66 53.00 40 Laboratory Chemical Waste and Vent Piping | 02-2011 | 34 KB | 5 KB | |||||||
| Division 23 - Heating, Ventilating, and Air Conditioning | 05-2013 | 2.1 MB | |||||||
| UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems | 08-2010 | 228 KB | 62 KB | |||||||
| UFGS 23 01 30.41 HVAC System Cleaning | 08-2010 | 47 KB | 9 KB | |||||||
| UFGS 23 03 00.00 20 Basic Mechanical Materials and Methods | 08-2010 | 36 KB | 7 KB | |||||||
| UFGS 23 05 15 Common Piping for HVAC | 02-2009 | 124 KB | 32 KB | |||||||
| UFGS 23 05 48.00 40 Vibration and Seismic Controls for HVAC Piping and Equipment | 02-2011 | 62 KB | 10 KB | |||||||
| UFGS 23 05 93 Testing, Adjusting, and Balancing for HVAC | 08-2009 | 166 KB | 35 KB | |||||||
| UFGS 23 07 00 Thermal Insulation for Mechanical Systems | 02-2013 | 198 KB | 42 KB | |||||||
| UFGS 23 08 00.00 10 Commissioning of HVAC Systems | 01-2008 | 118 KB | 18 KB | |||||||
| UFGS 23 08 01.00 20 Testing Industrial Ventilation Systems | 04-2006 | 105 KB | 18 KB | |||||||
| UFGS 23 09 13.34 40 Control Valves, Self-Contained | 02-2011 | 35 KB | 6 KB | |||||||
| UFGS 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC | 08-2009 | 170 KB | 49 KB | |||||||
| UFGS 23 09 23 Lonworks Direct Digital Control for HVAC and Other Building Control Systems | 05-2011 | 297 KB | 66 KB | |||||||
| UFGS 23 09 33.00 40 Electric and Electronic Control System for HVAC | 08-2010 | 90 KB | 22 KB | |||||||
| UFGS 23 09 53.00 20 Space Temperature Control Systems | 02-2010 | 143 KB | 37 KB | |||||||
| UFGS 23 11 25 Facility Gas Piping | 11-2008 | 87 KB | 21 KB | |||||||
| UFGS 23 21 13.00 20 Low Temperature Water (LTW) Heating System | 04-2006 | 87 KB | 22 KB | |||||||
| UFGS 23 21 13.23 20 [High] [Medium] Temperature Water System Within Buildings | 07-2007 | 67 KB | 15 KB | |||||||
| UFGS 23 22 13.35 40 Steam Traps | 02-2011 | 28 KB | 4 KB | |||||||
| UFGS 23 22 23.00 40 Steam Condensate Pumps | 02-2011 | 43 KB | 9 KB | |||||||
| UFGS 23 22 25.00 40 Steam Valves | 02-2011 | 55 KB | 8 KB | |||||||
| UFGS 23 22 26.00 20 Steam System and Terminal Units | 02-2010 | 84 KB | 20 KB | |||||||
| UFGS 23 23 00 Refrigerant Piping | 10-2007 | 87 KB | 22 KB | |||||||
| UFGS 23 25 00 Chemical Treatment of Water for Mechanical Systems | 11-2008 | 75 KB | 15 KB | |||||||
| UFGS 23 31 13.00 40 Metal Ducts | 11-2012 | 91 KB | 21 KB | |||||||
| UFGS 23 33 56 Self-Acting Blast Valves | 02-2009 | 50 KB | 9 KB | |||||||
| UFGS 23 34 23.00 40 HVAC Power Ventilators | 02-2011 | 42 KB | 7 KB | |||||||
| UFGS 23 35 00.00 10 Overhead Vehicle Tailpipe [and Welding Fume] Exhaust Removal System(s) | 02-2009 | 57 KB | 13 KB | |||||||
| UFGS 23 35 19.00 20 Industrial Ventilation and Exhaust | 02-2010 | 150 KB | 38 KB | |||||||
| UFGS 23 36 00.00 40 Air Terminal Units | 02-2011 | 84 KB | 13 KB | |||||||
| UFGS 23 37 13.00 40 Diffusers, Registers and Grills | 05-2010 | 38 KB | 6 KB | |||||||
| UFGS 23 40 00.00 10 Chemical, Biological and Radiological (CBR) Air Filtration System | 10-2007 | 69 KB | 17 KB | |||||||
| UFGS 23 41 13.00 40 Panel Filters | 05-2010 | 45 KB | 9 KB | |||||||
| UFGS 23 51 43.00 20 Dust and Gas Collector, Dry Scrubber and Fabric Filter Type | 02-2010 | 343 KB | 103 KB | |||||||
| UFGS 23 51 43.01 20 Mechanical Cyclone Dust Collector of Flue Gas Particulates | 04-2006 | 110 KB | 26 KB | |||||||
| UFGS 23 51 43.02 20 Electrostatic Dust Collector of Flue Gas Particulates | 04-2006 | 137 KB | 35 KB | |||||||
| UFGS 23 51 43.03 20 Fabric Filter Dust Collector of Fly Ash Particles in Flue Gas | 02-2010 | 150 KB | 38 KB | |||||||
| UFGS 23 52 00 Heating Boilers | 04-2008 | 213 KB | 59 KB | |||||||
| UFGS 23 52 33.01 20 Steam Heating Plant Watertube (Shop Assembled) Coal/Oil or Coal | 11-2008 | 446 KB | 120 KB | |||||||
| UFGS 23 52 33.02 20 Steam Heating Plant Watertube (Field Erected) Coal/Oil or Coal | 11-2008 | 513 KB | 138 KB | |||||||
| UFGS 23 52 33.03 20 Water-Tube Boilers, Oil/Gas or Oil | 11-2008 | 264 KB | 69 KB | |||||||
| UFGS 23 52 43.00 10 Heat Recovery Boilers | 04-2008 | 188 KB | 55 KB | |||||||
| UFGS 23 52 43.00 20 Low Pressure Water Heating Boilers (Under 800,000 BTU/HR Output) | 07-2006 | 54 KB | 11 KB | |||||||
| UFGS 23 52 46.00 20 Low Pressure Water Heating Boilers (Over 800,000 BTU/HR Output) | 04-2006 | 50 KB | 10 KB | |||||||
| UFGS 23 52 49.00 20 Steam Boilers and Equipment (500,000 - 18,000,000 BTU/HR) | 11-2008 | 88 KB | 24 KB | |||||||
| UFGS 23 52 53.00 20 Steam Boilers and Equipment (18,000,000 - 60,000,000 BTU/HR) | 04-2006 | 101 KB | 29 KB | |||||||
| UFGS 23 54 16.00 10 Heating System; Gas-Fired Heaters | 04-2008 | 42 KB | 8 KB | |||||||
| UFGS 23 54 19 Building Heating Systems, Warm Air | 11-2008 | 85 KB | 22 KB | |||||||
| UFGS 23 57 10.00 10 Forced Hot Water Heating Systems Using Water and Steam Heat Exchangers | 01-2008 | 134 KB | 34 KB | |||||||
| UFGS 23 63 00.00 10 Cold Storage Refrigeration Systems | 10-2007 | 155 KB | 43 KB | |||||||
| UFGS 23 64 00 Packaged Water Chillers, Absorbtion Type | 08-2009 | 65 KB | 16 KB | |||||||
| UFGS 23 64 10 Water Chillers, Vapor Compression Type | 08-2008 | 145 KB | 40 KB | |||||||
| UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems | 08-2009 | 143 KB | 37 KB | |||||||
| UFGS 23 65 00 Cooling Towers | 08-2008 | 75 KB | 19 KB | |||||||
| UFGS 23 69 00.00 20 Refrigeration Equipment for Cold Storage | 07-2006 | 99 KB | 26 KB | |||||||
| UFGS 23 70 01.00 10 Central Steam-Generating System, Coal-Fired | 01-2008 | 323 KB | 96 KB | |||||||
| UFGS 23 70 02.00 10 Central Steam Generating System - Combination Gas and Oil Fired | 01-2008 | 280 KB | 78 KB | |||||||
| UFGS 23 70 03.00 10 Heating and Utilities Systems, Central Steam | 01-2008 | 113 KB | 29 KB | |||||||
| UFGS 23 71 19 Thermal Energy Storage System: Ice-On-Coil | 01-2008 | 54 KB | 12 KB | |||||||
| UFGS 23 72 00.00 10 Energy Recovery Systems | 01-2008 | 67 KB | 17 KB | |||||||
| UFGS 23 72 26.00 10 Desiccant Cooling Systems | 04-2008 | 80 KB | 20 KB | |||||||
| UFGS 23 73 13.00 40 Modular Indoor Central-Station Air-Handling Units | 02-2011 | 57 KB | 13 KB | |||||||
| UFGS 23 74 33.00 40 Packaged, Outdoor Heating and Cooling Makeup Air-Conditioners | 02-2011 | 45 KB | 9 KB | |||||||
| UFGS 23 76 00.00 10 Evaporative Cooling Systems | 04-2008 | 63 KB | 14 KB | |||||||
| UFGS 23 76 00.00 20 Evaporative Cooling System | 07-2006 | 56 KB | 11 KB | |||||||
| UFGS 23 81 00.00 20 Unitary Air Conditioning Equipment | 11-2009 | 94 KB | 22 KB | |||||||
| UFGS 23 81 23.00 20 Computer Room Air Conditioning Units | 02-2010 | 77 KB | 18 KB | |||||||
| UFGS 23 81 47 Water-Loop and Ground-Loop Heat Pump Systems | 08-2008 | 186 KB | 49 KB | |||||||
| UFGS 23 82 00.00 20 Terminal Heating and Cooling Units | 11-2008 | 55 KB | 11 KB | |||||||
| UFGS 23 82 01.00 10 Warm Air Heating Systems | 04-2008 | 79 KB | 20 KB | |||||||
| UFGS 23 82 02.00 10 Unitary Heating and Cooling Equipment | 04-2008 | 140 KB | 34 KB | |||||||
| UFGS 23 82 16.00 40 Air Coils | 05-2013 | 42 KB | 9 KB | |||||||
| UFGS 23 82 19.00 40 Fan Coil Units | 02-2011 | 35 KB | 6 KB | |||||||
| UFGS 23 82 23.00 40 Unit Ventilators | 02-2011 | 52 KB | 10 KB | |||||||
| UFGS 23 82 43.00 40 Electric Duct Heaters | 08-2011 | 30 KB | 5 KB | |||||||
| UFGS 23 82 46.00 40 Electric Unit Heaters | 08-2011 | 29 KB | 5 KB | |||||||
| UFGS 23 83 00.00 20 Electric Space Heating Equipment | 04-2006 | 39 KB | 6 KB | |||||||
| UFGS 23 84 16.00 20 Desiccant Dehumidification Equipment | 11-2008 | 31 KB | 5 KB | |||||||
| Division 25 - Integrated Automation | 05-2013 | 86 KB | |||||||
| UFGS 25 08 10 Utility Monitoring and Control System Testing | 04-2006 | 147 KB | 25 KB | |||||||
| UFGS 25 10 10 Utility Monitoring and Control System (UMCS) Front End Integration | 11-2012 | 222 KB | 59 KB | |||||||
| Division 26 - Electrical | 05-2013 | 1.4 MB | |||||||
| UFGS 26 00 00.00 20 Basic Electrical Materials and Methods | 07-2006 | 34 KB | 6 KB | |||||||
| UFGS 26 05 00.00 40 Common Work Results for Electrical | 11-2010 | 57 KB | 13 KB | |||||||
| UFGS 26 05 13.00 40 Medium-Voltage Cables | 08-2010 | 62 KB | 13 KB | |||||||
| UFGS 26 05 19.00 10 Insulated Wire and Cable | 11-2008 | 56 KB | 12 KB | |||||||
| UFGS 26 05 33 Dockside Power Connections Stations | 01-2007 | 66 KB | 14 KB | |||||||
| UFGS 26 05 48.00 10 Seismic Protection for Electrical Equipment | 10-2007 | 35 KB | 6 KB | |||||||
| UFGS 26 05 70.00 40 High-Voltage Overcurrent Protective Devices | 11-2011 | 71 KB | 15 KB | |||||||
| UFGS 26 05 71.00 40 Low-Voltage Overcurrent Protective Devices | 05-2011 | 69 KB | 15 KB | |||||||
| UFGS 26 08 00 Apparatus Inspection and Testing | 08-2008 | 29 KB | 4 KB | |||||||
| UFGS 26 09 13 Power Monitoring System | 11-2008 | 79 KB | 19 KB | |||||||
| UFGS 26 09 23.00 40 Lighting Control Devices | 08-2010 | 45 KB | 9 KB | |||||||
| UFGS 26 11 13.00 20 Primary Unit Substations | 04-2007 | 135 KB | 33 KB | |||||||
| UFGS 26 11 14.00 10 Main Electric Supply Station and Substation | 10-2007 | 194 KB | 53 KB | |||||||
| UFGS 26 11 16 Secondary Unit Substations | 02-2010 | 124 KB | 30 KB | |||||||
| UFGS 26 12 19.00 40 Pad-Mounted, Liquid-Filled Medium-Voltage Transformers | 02-2011 | 93 KB | 21 KB | |||||||
| UFGS 26 12 19.10 Three-Phase Pad-Mounted Transformers | 02-2012 | 109 KB | 23 KB | |||||||
| UFGS 26 12 19.20 Single-Phase Pad-Mounted Transformers | 04-2006 | 81 KB | 19 KB | |||||||
| UFGS 26 13 00.00 20 SF6/High-Firepoint Fluids Insulated Pad-Mounted Switchgear | 08-2011 | 48 KB | 9 KB | |||||||
| UFGS 26 18 23.00 40 Medium-Voltage Surge Arresters | 08-2010 | 32 KB | 5 KB | |||||||
| UFGS 26 20 00 Interior Distribution System | 08-2008 | 199 KB | 51 KB | |||||||
| UFGS 26 22 00.00 10 480-Volt Station Service Switchgear and Transformers | 10-2007 | 84 KB | 22 KB | |||||||
| UFGS 26 23 00.00 40 Switchboards and Switchgear | 02-2011 | 94 KB | 22 KB | |||||||
| UFGS 26 23 00 Switchboards and Switchgear | 07-2006 | 88 KB | 20 KB | |||||||
| UFGS 26 24 16.00 40 Panelboards | 08-2010 | 41 KB | 8 KB | |||||||
| UFGS 26 24 19.00 40 Motor-Control Centers | 08-2010 | 94 KB | 25 KB | |||||||
| UFGS 26 27 13.10 30 Electric Meters | 10-2007 | 57 KB | 12 KB | |||||||
| UFGS 26 27 14.00 20 Electricity Metering | 02-2011 | 88 KB | 20 KB | |||||||
| UFGS 26 27 29 Marina Electrical Work | 04-2006 | 76 KB | 17 KB | |||||||
| UFGS 26 28 00.00 10 Motor Control Centers, Switchboards and Panelboards | 10-2007 | 98 KB | 25 KB | |||||||
| UFGS 26 28 01.00 10 Coordinated Power System Protection | 10-2007 | 83 KB | 20 KB | |||||||
| UFGS 26 28 21.00 40 Automatic Transfer Switches | 08-2011 | 36 KB | 6 KB | |||||||
| UFGS 26 29 01.00 10 Electric Motors, 3-Phase Vertical Induction Type | 11-2008 | 66 KB | 16 KB | |||||||
| UFGS 26 29 02.00 10 Electric Motors, 3-Phase Vertical Synchronous Type | 11-2008 | 82 KB | 21 KB | |||||||
| UFGS 26 29 23 Variable Frequency Drive Systems Under 600 Volts | 04-2006 | 43 KB | 9 KB | |||||||
| UFGS 26 32 13.00 20 Single Operation Generator Sets | 04-2007 | 128 KB | 31 KB | |||||||
| UFGS 26 32 14.00 10 Diesel-Generator Set, Stationary 15-300 KW, Standby Applications | 02-2010 | 187 KB | 47 KB | |||||||
| UFGS 26 32 15.00 10 Diesel-Generator Set Stationary 100-2500 KW, with Auxiliaries | 10-2007 | 252 KB | 63 KB | |||||||
| UFGS 26 32 26 Motor-Generator Sets, 400 Hertz (HZ) | 04-2006 | 80 KB | 19 KB | |||||||
| UFGS 26 32 33.00 10 Uninterruptible Power Supply (UPS) System Above 15 KVA Capacity | 10-2007 | 110 KB | 27 KB | |||||||
| UFGS 26 33 53.00 20 Uninterruptible Power Supply (UPS) | 04-2008 | 113 KB | 29 KB | |||||||
| UFGS 26 35 33.00 40 Power Factor Correction Equipment | 08-2010 | 37 KB | 7 KB | |||||||
| UFGS 26 35 43 400-Hertz (HZ) Solid State Frequency Converter | 05-2011 | 87 KB | 20 KB | |||||||
| UFGS 26 35 46.00 20 Radio Frequency Interference Power Line Filters | 04-2006 | 56 KB | 10 KB | |||||||
| UFGS 26 36 00.00 10 Automatic Transfer Switch and By-Pass/Isolation Switch | 10-2007 | 52 KB | 12 KB | |||||||
| UFGS 26 36 23.00 20 Automatic Transfer Switches | 04-2006 | 39 KB | 7 KB | |||||||
| UFGS 26 41 00.00 20 Lightning Protection System | 04-2006 | 53 KB | 12 KB | |||||||
| UFGS 26 41 00.00 40 Lightning Protection System | 11-2008 | 64 KB | 15 KB | |||||||
| UFGS 26 41 01.00 10 Lightning Protection System | 11-2008 | 55 KB | 12 KB | |||||||
| UFGS 26 42 13.00 20 Cathodic Protection by Galvanic Anodes | 04-2006 | 73 KB | 17 KB | |||||||
| UFGS 26 42 14.00 10 Cathodic Protection System (Sacrificial Anode) | 08-2009 | 85 KB | 22 KB | |||||||
| UFGS 26 42 15.00 10 Cathodic Protection System (Steel Water Tanks) | 02-2013 | 69 KB | 17 KB | |||||||
| UFGS 26 42 17.00 10 Cathodic Protection System (Impressed Current) | 11-2008 | 104 KB | 27 KB | |||||||
| UFGS 26 42 19.00 20 Cathodic Protection by Impressed Current | 04-2006 | 101 KB | 24 KB | |||||||
| UFGS 26 42 19.10 Cathodic Protection Systems (Impressed Current) For Lock Miter Gates | 11-2008 | 104 KB | 27 KB | |||||||
| UFGS 26 42 22.00 20 Cathodic Protection System for Steel Water Tanks | 01-2008 | 80 KB | 19 KB | |||||||
| UFGS 26 51 00.00 40 Interior Lighting | 02-2013 | 95 KB | 23 KB | |||||||
| UFGS 26 51 00 Interior Lighting | 07-2007 | 116 KB | 27 KB | |||||||
| UFGS 26 52 00.00 40 Emergency Lighting | 08-2011 | 33 KB | 6 KB | |||||||
| UFGS 26 53 00.00 40 Exit Signs | 11-2008 | 31 KB | 5 KB | |||||||
| UFGS 26 54 21.00 10 Helipad Lighting and Visual Navigation Aids | 10-2007 | 112 KB | 29 KB | |||||||
| UFGS 26 55 53.00 10 Exterior Lighting Including Security and CCTV Applications | 10-2007 | 129 KB | 33 KB | |||||||
| UFGS 26 55 53.00 40 Security Lighting | 05-2011 | 98 KB | 24 KB | |||||||
| UFGS 26 55 80.00 20 Surgical Lighting Fixtures | 04-2006 | 35 KB | 6 KB | |||||||
| UFGS 26 56 00 Exterior Lighting | 05-2013 | 115 KB | 29 KB | |||||||
| UFGS 26 56 13.00 40 Lighting Poles and Standards | 11-2008 | 77 KB | 18 KB | |||||||
| UFGS 26 56 19.00 40 Roadway Lighting | 05-2013 | 39 KB | 8 KB | |||||||
| UFGS 26 56 20.00 10 Airfield and Heliport Lighting and Visual Navigation Aids | 10-2007 | 130 KB | 34 KB | |||||||
| UFGS 26 56 23.00 40 Area Lighting | 11-2008 | 50 KB | 10 KB | |||||||
| UFGS 26 56 36.00 40 Flood Lighting | 02-2013 | 54 KB | 11 KB | |||||||
| UFGS 26 60 13.00 40 Low-Voltage Motors | 11-2011 | 54 KB | 10 KB | |||||||
| Division 27 - Communications | 05-2013 | 346 KB | |||||||
| UFGS 27 05 13.00 10 Two-Way Radio Data Ethernet Transmission System | 04-2006 | 54 KB | 11 KB | |||||||
| UFGS 27 05 14.00 10 Cable Television Premises Distribution System | 04-2006 | 36 KB | 7 KB | |||||||
| UFGS 27 05 28.36 40 Cable Trays for Communications Systems | 08-2011 | 28 KB | 4 KB | |||||||
| UFGS 27 05 29.00 10 Protective Distribution System (PDS) for SIPRNET Communication Systems | 08-2011 | 43 KB | 8 KB | |||||||
| UFGS 27 10 00 Building Telecommunications Cabling System | 08-2011 | 113 KB | 26 KB | |||||||
| UFGS 27 13 23.00 40 Communications Optical Backbone Cabling | 11-2008 | 92 KB | 24 KB | |||||||
| UFGS 27 15 19.00 10 Wire Line Data Transmission System | 04-2006 | 59 KB | 13 KB | |||||||
| UFGS 27 21 00.00 20 Intercommunication System | 04-2006 | 63 KB | 13 KB | |||||||
| UFGS 27 21 00.00 40 Intercommunication System | 02-2011 | 60 KB | 13 KB | |||||||
| UFGS 27 21 10.00 10 Fiber Optic Data Transmission System | 07-2006 | 108 KB | 28 KB | |||||||
| UFGS 27 21 10.00 40 Fiber Optic Data Transmission System | 05-2013 | 105 KB | 28 KB | |||||||
| UFGS 27 33 30.00 10 Stand-Alone One-Way Radio Control System | 04-2006 | 46 KB | 9 KB | |||||||
| UFGS 27 33 31.00 10 One-Way FM Radio Data Control System (UMCS) | 04-2006 | 59 KB | 14 KB | |||||||
| UFGS 27 41 00.00 10 Nurse Call Audio-Visual (NCAV) System | 04-2006 | 150 KB | 40 KB | |||||||
| UFGS 27 41 16.00 10 Television Signal Reception System | 04-2006 | 59 KB | 13 KB | |||||||
| UFGS 27 51 13.00 10 Radio Paging System | 04-2006 | 46 KB | 10 KB | |||||||
| UFGS 27 51 16 Radio and Public Address Systems | 04-2006 | 54 KB | 12 KB | |||||||
| UFGS 27 51 23.10 Intercommunication System | 05-2011 | 69 KB | 12 KB | |||||||
| UFGS 27 52 23.00 20 Nurse Call System | 04-2006 | 47 KB | 9 KB | |||||||
| UFGS 27 52 32.00 10 Nurse Call Tone-Visual (NCTV) System | 10-2007 | 122 KB | 30 KB | |||||||
| UFGS 27 54 00.00 20 Community Antenna Television (CATV) | 04-2006 | 59 KB | 11 KB | |||||||
| Division 28 - Electronic Safety and Security | 05-2013 | 550 KB | |||||||
| UFGS 28 05 26.00 40 Grounding and Bonding for Electronic Safety and Security | 08-2010 | 44 KB | 9 KB | |||||||
| UFGS 28 16 00.00 20 Basic Intrusion Detection Systems (IDS) | 04-2006 | 115 KB | 34 KB | |||||||
| UFGS 28 16 01.00 10 Small Intrusion Detection System | 11-2008 | 91 KB | 23 KB | |||||||
| UFGS 28 20 00.00 20 Electronic Security System (ESS), Commercial | 04-2006 | 208 KB | 68 KB | |||||||
| UFGS 28 20 01.00 10 Electronic Security System | 10-2007 | 249 KB | 67 KB | |||||||
| UFGS 28 20 02 Central Monitoring Services for Electronic Security Systems | 11-2008 | 40 KB | 7 KB | |||||||
| UFGS 28 23 23.00 10 Closed Circuit Television Systems | 02-2011 | 123 KB | 31 KB | |||||||
| UFGS 28 26 23 Duress Signal System (For Brig Facilities) | 04-2006 | 32 KB | 5 KB | |||||||
| UFGS 28 31 00.00 10 Fire Detection and Alarm System, Direct Current Loop | 11-2008 | 90 KB | 23 KB | |||||||
| UFGS 28 31 02.00 20 Fire Alarm Reporting Systems - Digital Communicators | 02-2010 | 58 KB | 13 KB | |||||||
| UFGS 28 31 13.00 40 Fire Detection and Alarm Control, GUI and Logic Systems | 05-2013 | 174 KB | 47 KB | |||||||
| UFGS 28 31 33.00 10 Fire Alarm Reporting System, Radio Type | 11-2008 | 59 KB | 13 KB | |||||||
| UFGS 28 31 33.13 20 Exterior Fire Reporting System, Radio Type | 04-2006 | 115 KB | 29 KB | |||||||
| UFGS 28 31 49 Carbon Monoxide Detectors | 04-2006 | 25 KB | 3 KB | |||||||
| UFGS 28 31 63.00 20 Analog/Addressable Interior Fire Alarm System | 10-2007 | 114 KB | 30 KB | |||||||
| UFGS 28 31 64.00 10 Fire Detection and Alarm System, Addressable | 08-2009 | 95 KB | 25 KB | |||||||
| UFGS 28 31 73.00 20 Exterior Fire Alarm System, Closed Circuit Telegraphic Type | 02-2010 | 79 KB | 20 KB | |||||||
| UFGS 28 31 74.00 20 Interior Fire Detection and Alarm System | 02-2010 | 107 KB | 27 KB | |||||||
| UFGS 28 31 75.00 10 Central Fire Alarm System, Digital Alarm Communicator Type | 11-2008 | 54 KB | 12 KB | |||||||
| UFGS 28 31 76 Interior Fire Alarm and Mass Notification System | 08-2011 | 156 KB | 41 KB | |||||||
| UFGS 28 33 00.00 40 Fuel-Gas Detection and Alarm | 02-2011 | 35 KB | 6 KB | |||||||
| UFGS 28 40 01 Watchtour System (For Brig Facilities) | 04-2006 | 35 KB | 6 KB | |||||||
| SITE AND INFRASTRUCTURE SUBGROUP | |||||||||
| Division 31 - Earthwork | 05-2013 | 568 KB | |||||||
| UFGS 31 00 00 Earthwork | 08-2008 | 133 KB | 34 KB | |||||||
| UFGS 31 05 19 Geotextile | 08-2008 | 46 KB | 9 KB | |||||||
| UFGS 31 05 20 Geosynthetic Drainage Layer | 08-2008 | 40 KB | 7 KB | |||||||
| UFGS 31 05 21 Geogrid Soil Reinforcement | 08-2008 | 42 KB | 9 KB | |||||||
| UFGS 31 05 22 Geotextiles Used as Filters | 08-2008 | 54 KB | 12 KB | |||||||
| UFGS 31 10 00 Clearing for Civil Works | 08-2008 | 37 KB | 7 KB | |||||||
| UFGS 31 11 00 Clearing and Grubbing | 08-2008 | 33 KB | 6 KB | |||||||
| UFGS 31 21 00 Piping; Off-Gas | 08-2008 | 85 KB | 21 KB | |||||||
| UFGS 31 21 13 Radon Mitigation | 08-2011 | 97 KB | 19 KB | |||||||
| UFGS 31 23 00.00 20 Excavation and Fill | 02-2011 | 130 KB | 32 KB | |||||||
| UFGS 31 31 16.19 Termite Control Barrier System | 04-2006 | 33 KB | 6 KB | |||||||
| UFGS 31 31 16.20 Basaltic Termite Barrier | 04-2006 | 28 KB | 4 KB | |||||||
| UFGS 31 31 16.21 Mesh Termite Barrier | 08-2008 | 28 KB | 4 KB | |||||||
| UFGS 31 31 16 Soil Treatment for Subterranean Termite Control | 08-2008 | 41 KB | 8 KB | |||||||
| UFGS 31 32 11 Soil Surface Erosion Control | 08-2008 | 112 KB | 24 KB | |||||||
| UFGS 31 32 23 Foundation Drilling and Grouting | 08-2008 | 80 KB | 19 KB | |||||||
| UFGS 31 32 39 Bioengineering Practices for Stream Bank and Shoreline Stabilization | 08-2008 | 210 KB | 56 KB | |||||||
| UFGS 31 36 00 Wire Mesh Gabions [And Mattresses] | 08-2008 | 79 KB | 18 KB | |||||||
| UFGS 31 41 16 Metal Sheet Piling | 08-2009 | 68 KB | 16 KB | |||||||
| UFGS 31 60 00 Foundation Preparation | 11-2008 | 46 KB | 8 KB | |||||||
| UFGS 31 62 13.13 Cast-In-Place Concrete Piles | 04-2006 | 47 KB | 9 KB | |||||||
| UFGS 31 62 13.20 Precast/Prestressed Concrete Piles | 08-2009 | 116 KB | 29 KB | |||||||
| UFGS 31 62 13.24 Concrete Cylinder Piles | 08-2011 | 137 KB | 36 KB | |||||||
| UFGS 31 62 13.26 Pressure-Injected Footings | 04-2006 | 43 KB | 8 KB | |||||||
| UFGS 31 62 16.16 Steel H Piles | 11-2011 | 81 KB | 20 KB | |||||||
| UFGS 31 62 19.13 Wood Marine Piles | 04-2006 | 77 KB | 18 KB | |||||||
| UFGS 31 62 19 Timber Piles | 01-2008 | 70 KB | 15 KB | |||||||
| UFGS 31 62 21 Piling: Composite, Wood and Cast In-Place Concrete | 11-2008 | 49 KB | 11 KB | |||||||
| UFGS 31 62 23.13 Cast-In-Place Concrete Piles, Steel Casing | 11-2008 | 46 KB | 10 KB | |||||||
| UFGS 31 63 16 Auger Cast Grout Piles | 11-2008 | 54 KB | 12 KB | |||||||
| UFGS 31 63 26 Drilled Caissons | 08-2008 | 54 KB | 11 KB | |||||||
| UFGS 31 63 29 Drilled Concrete Piers and Shafts | 05-2009 | 49 KB | 9 KB | |||||||
| UFGS 31 68 13 Soil and Rock Anchors | 11-2008 | 111 KB | 26 KB | |||||||
| UFGS 31 73 00 Tunnel and Shaft Grouting | 11-2008 | 76 KB | 19 KB | |||||||
| Division 32 - Exterior Improvements | 05-2013 | 1 MB | |||||||
| UFGS 32 01 11.51 Rubber and Paint Removal From Airfield Pavements | 04-2006 | 31 KB | 5 KB | |||||||
| UFGS 32 01 11.52 Runway Rubber Removal | 08-2008 | 26 KB | 4 KB | |||||||
| UFGS 32 01 13.00 20 Emulsified Asphalt Seal Coats [With] [Without] Aggregate | 02-2012 | 67 KB | 15 KB | |||||||
| UFGS 32 01 13 Bituminous Seal and Fog Coats | 08-2008 | 60 KB | 13 KB | |||||||
| UFGS 32 01 16.17 Cold Milling of Bituminous Pavements | 08-2008 | 27 KB | 4 KB | |||||||
| UFGS 32 01 17.16 Sealing of Cracks in Bituminous Pavements | 08-2008 | 42 KB | 8 KB | |||||||
| UFGS 32 01 17.62 Stress-Absorbing Membrane Interlayer | 05-2011 | 46 KB | 9 KB | |||||||
| UFGS 32 01 17 Cold-Mix Recycling | 08-2008 | 59 KB | 13 KB | |||||||
| UFGS 32 01 19.61 Resealing of Joints in Rigid Pavement | 04-2006 | 62 KB | 13 KB | |||||||
| UFGS 32 01 19 Field Molded Sealants for Sealing Joints in Rigid Pavements | 08-2008 | 55 KB | 12 KB | |||||||
| UFGS 32 01 22 Bituminous Rejuvenation | 08-2008 | 34 KB | 6 KB | |||||||
| UFGS 32 01 24 Hot In-Place Recycling of Bituminous Pavements | 08-2008 | 48 KB | 9 KB | |||||||
| UFGS 32 01 25 Heater Scarifying of Bituminous Pavements | 08-2008 | 34 KB | 6 KB | |||||||
| UFGS 32 01 26.71 Grooving for Airfield Pavements | 08-2008 | 28 KB | 4 KB | |||||||
| UFGS 32 01 29.61 Partial Depth Patching of Rigid Paving | 11-2008 | 80 KB | 18 KB | |||||||
| UFGS 32 01 29.62 Slabjacking Rigid Pavements | 08-2008 | 47 KB | 10 KB | |||||||
| UFGS 32 05 33 Landscape Establishment | 02-2010 | 57 KB | 13 KB | |||||||
| UFGS 32 10 00 [Pervious] Bituminous Concrete Pavement | 08-2008 | 60 KB | 11 KB | |||||||
| UFGS 32 11 10 Drainage Layer | 08-2008 | 68 KB | 15 KB | |||||||
| UFGS 32 11 16.13 Sand-Clay [Base] [Subbase] Course | 04-2006 | 31 KB | 5 KB | |||||||
| UFGS 32 11 16.16 [Base Course for Rigid] [and Subbase Course for Flexible] [Subbase Course for Pervious] Paving | 11-2011 | 40 KB | 8 KB | |||||||
| UFGS 32 11 16 [Base Course for Rigid] [and Subbases for Flexible] Paving | 08-2008 | 55 KB | 11 KB | |||||||
| UFGS 32 11 23 Aggregate and/or Graded-Crushed Aggregate Base Course | 08-2008 | 66 KB | 15 KB | |||||||
| UFGS 32 11 24 Graded Crushed Aggregate Base Course for [Pervious] [Flexible] Pavement | 11-2011 | 50 KB | 10 KB | |||||||
| UFGS 32 11 26.16 Bituminous Concrete Base Course | 04-2006 | 52 KB | 12 KB | |||||||
| UFGS 32 11 26 Bituminous Base Course | 08-2008 | 56 KB | 12 KB | |||||||
| UFGS 32 11 27 Bituminous-Stabilized Base Course, Subbase, or Subgrade | 08-2008 | 54 KB | 12 KB | |||||||
| UFGS 32 11 29 Lime-[Stabilized] [Modified] Subgrade | 11-2009 | 66 KB | 16 KB | |||||||
| UFGS 32 11 30 Lime Treated Subgrade [Lime Modified Soils] | 08-2008 | 50 KB | 11 KB | |||||||
| UFGS 32 11 33 Cement Stabilized [Base] [Subbase] Course at Airfields and Roads | 08-2008 | 78 KB | 17 KB | |||||||
| UFGS 32 11 34 Portland Cement-Stabilized Base or Subbase Course | 08-2008 | 62 KB | 13 KB | |||||||
| UFGS 32 11 36.13 Lean Concrete Base Course | 04-2006 | 54 KB | 12 KB | |||||||
| UFGS 32 12 10 Bituminous Tack and Prime Coats | 08-2008 | 52 KB | 11 KB | |||||||
| UFGS 32 12 11 Bituminous Surface Treatment | 11-2008 | 50 KB | 10 KB | |||||||
| UFGS 32 12 15.13 Hot-Mix Asphalt Airfield Paving | 11-2012 | 125 KB | 30 KB | |||||||
| UFGS 32 12 15.16 Warm-Mix Asphalt Airfield Paving | 11-2012 | 122 KB | 30 KB | |||||||
| UFGS 32 12 16 Hot-Mix Asphalt (HMA) for Roads | 08-2009 | 102 KB | 26 KB | |||||||
| UFGS 32 12 17 Hot Mix Bituminous Pavement | 04-2008 | 89 KB | 21 KB | |||||||
| UFGS 32 12 18 Resin Modified Pavement Surfacing Material | 08-2008 | 78 KB | 19 KB | |||||||
| UFGS 32 12 19 Bituminous Binder and Wearing Courses (Central-Plant Cold-Mix) | 08-2008 | 59 KB | 12 KB | |||||||
| UFGS 32 12 21 Bituminous Road-Mix Surface Course | 08-2008 | 59 KB | 13 KB | |||||||
| UFGS 32 12 22.00 10 Polymer Concrete-Micro-Overlay (PCMO) For Fuel and Abrasion Resistant Wearing Surfaces | 08-2008 | 52 KB | 11 KB | |||||||
| UFGS 32 12 36.19 Coal Tar Seal Coat with Unvulcanized Rubber | 04-2006 | 37 KB | 7 KB | |||||||
| UFGS 32 12 37 Fuel-Resistant (Coal Tar) Sealer | 08-2008 | 46 KB | 9 KB | |||||||
| UFGS 32 12 43.16 Porous Friction Course for Airfields and Roads | 08-2008 | 74 KB | 18 KB | |||||||
| UFGS 32 13 11 Concrete Pavement for Airfields and Other Heavy-Duty Pavement | 11-2012 | 236 KB | 67 KB | |||||||
| UFGS 32 13 13.06 Portland Cement Concrete Pavement for Roads and Site Facilities | 11-2011 | 90 KB | 22 KB | |||||||
| UFGS 32 13 15.20 Concrete Pavement for Containment Dikes | 11-2010 | 61 KB | 14 KB | |||||||
| UFGS 32 13 16.16 Roller Compacted Concrete (RCC) Pavement | 11-2008 | 179 KB | 51 KB | |||||||
| UFGS 32 13 17 Stone Matrix Asphalt (SMA) for Airfield Pavements | 08-2008 | 97 KB | 26 KB | |||||||
| UFGS 32 13 43 Pervious Concrete Paving | 11-2011 | 69 KB | 16 KB | |||||||
| UFGS 32 13 73 Compression Joint Seals for Concrete Pavements | 04-2008 | 53 KB | 12 KB | |||||||
| UFGS 32 15 00 Aggregate Surface Course | 04-2008 | 43 KB | 8 KB | |||||||
| UFGS 32 16 13 Concrete Sidewalks and Curbs and Gutters | 04-2008 | 59 KB | 13 KB | |||||||
| UFGS 32 16 15 Concrete Block Pavements | 04-2008 | 38 KB | 7 KB | |||||||
| UFGS 32 17 23.00 20 Pavement Markings | 04-2006 | 79 KB | 19 KB | |||||||
| UFGS 32 17 24.00 10 Pavement Markings | 04-2008 | 60 KB | 14 KB | |||||||
| UFGS 32 18 16.13 Playground Protective Surfacing | 04-2008 | 71 KB | 16 KB | |||||||
| UFGS 32 31 13.53 High-Security Chain Link Fences and Gates | 04-2008 | 59 KB | 13 KB | |||||||
| UFGS 32 31 13 Chain Link Fences and Gates | 08-2010 | 67 KB | 13 KB | |||||||
| UFGS 32 31 26 Wire Fences and Gates | 04-2008 | 37 KB | 7 KB | |||||||
| UFGS 32 32 23 Segmental Concrete Block Retaining Wall | 04-2008 | 80 KB | 20 KB | |||||||
| UFGS 32 84 23 Underground Sprinkler Systems | 04-2008 | 74 KB | 17 KB | |||||||
| UFGS 32 84 24 Irrigation Sprinkler Systems | 08-2011 | 97 KB | 21 KB | |||||||
| UFGS 32 92 19 Seeding | 10-2006 | 59 KB | 11 KB | |||||||
| UFGS 32 92 23 Sodding | 04-2006 | 50 KB | 9 KB | |||||||
| UFGS 32 92 26 Sprigging | 04-2006 | 55 KB | 11 KB | |||||||
| UFGS 32 93 00 Exterior Plants | 02-2010 | 104 KB | 25 KB | |||||||
| UFGS 32 96 00 Transplanting Exterior Plants | 02-2010 | 72 KB | 17 KB | |||||||
| Division 33 - Utilities | 05-2013 | 1.4 MB | |||||||
| UFGS 33 01 50.01 Cleaning Fuel Storage Tanks | 02-2010 | 40 KB | 8 KB | |||||||
| UFGS 33 01 98 Slip Lining of Existing Piping for Levee Applications | 05-2013 | 69 KB | 17 KB | |||||||
| UFGS 33 01 99 Slip Lining of Existing Piping | 05-2009 | 40 KB | 8 KB | |||||||
| UFGS 33 05 16 Concrete Poles | 08-2008 | 32 KB | 5 KB | |||||||
| UFGS 33 05 23.13 Utility Horizontal Directional Drilling | 02-2010 | 32 KB | 6 KB | |||||||
| UFGS 33 05 23.19 Trenchless Excavation Using Microtunneling | 04-2006 | 78 KB | 19 KB | |||||||
| UFGS 33 08 53 Aviation Fuel Distribution System Start-Up | 02-2010 | 52 KB | 11 KB | |||||||
| UFGS 33 08 55 Commissioning of Fuel Facility Systems | 07-2007 | 65 KB | 15 KB | |||||||
| UFGS 33 09 53 Aviation Fuel Pump Control and Annunciation System | 02-2010 | 126 KB | 29 KB | |||||||
| UFGS 33 09 54 Aviation Fuel Pump Control and Annunciation System (Type [IV][V]) | 02-2010 | 128 KB | 30 KB | |||||||
| UFGS 33 09 55 Aviation Fuel Pump Control and Annunciation System (Cut-N-Cover Tanks) | 02-2010 | 129 KB | 30 KB | |||||||
| UFGS 33 11 00 Water Distribution | 02-2011 | 175 KB | 41 KB | |||||||
| UFGS 33 11 23 Natural Gas and Liquid Petroleum Piping | 11-2009 | 61 KB | 13 KB | |||||||
| UFGS 33 12 33.00 30 Water Utility Metering | 11-2011 | 66 KB | 14 KB | |||||||
| UFGS 33 16 13.16 Wire-Wound Circular Prestressed-Concrete Water Tank | 04-2006 | 31 KB | 4 KB | |||||||
| UFGS 33 16 15 Water Storage Steel Tanks | 04-2008 | 66 KB | 15 KB | |||||||
| UFGS 33 20 00 Water Wells | 04-2008 | 124 KB | 33 KB | |||||||
| UFGS 33 24 00.00 20 [Extraction] [Monitoring] Wells | 04-2006 | 55 KB | 12 KB | |||||||
| UFGS 33 24 13 Groundwater Monitoring Wells | 08-2008 | 105 KB | 27 KB | |||||||
| UFGS 33 26 00.00 10 Relief Wells | 04-2008 | 78 KB | 20 KB | |||||||
| UFGS 33 30 00 Sanitary Sewers | 04-2008 | 111 KB | 25 KB | |||||||
| UFGS 33 32 13.13 Packaged Sewage Lift Stations, Wet Well Type | 05-2009 | 47 KB | 9 KB | |||||||
| UFGS 33 32 13.14 Package Sewage Lift Stations, Grinder Pump Type | 01-2008 | 48 KB | 10 KB | |||||||
| UFGS 33 34 00 Force Mains and Inverted Siphons; Sewer | 04-2008 | 60 KB | 12 KB | |||||||
| UFGS 33 34 13 Siphons, Dosing | 04-2008 | 29 KB | 4 KB | |||||||
| UFGS 33 40 00 Storm Drainage Utilities | 02-2010 | 122 KB | 30 KB | |||||||
| UFGS 33 45 00.00 10 Speed Reducers for Storm Water Pumps | 04-2008 | 62 KB | 14 KB | |||||||
| UFGS 33 46 13 Foundation Drainage System | 04-2008 | 42 KB | 7 KB | |||||||
| UFGS 33 46 16 Subdrainage System | 04-2008 | 71 KB | 16 KB | |||||||
| UFGS 33 47 13 Pond and Reservoir Liners | 04-2006 | 42 KB | 7 KB | |||||||
| UFGS 33 51 13.00 30 Natural-Gas Metering | 05-2010 | 48 KB | 10 KB | |||||||
| UFGS 33 51 15 Natural-Gas / Liquid Petroleum Gas Distribution | 11-2008 | 90 KB | 23 KB | |||||||
| UFGS 33 52 10 Service Piping, Fuel Systems | 04-2008 | 120 KB | 30 KB | |||||||
| UFGS 33 52 43.11 Aviation Fuel Mechanical Equipment | 02-2010 | 119 KB | 28 KB | |||||||
| UFGS 33 52 43.12 Aviation Fuel Pantograph | 02-2010 | 55 KB | 10 KB | |||||||
| UFGS 33 52 43.13 Aviation Fuel Piping | 02-2010 | 122 KB | 34 KB | |||||||
| UFGS 33 52 43.14 Aviation Fuel Control Valves | 02-2010 | 68 KB | 13 KB | |||||||
| UFGS 33 52 43.23 Aviation Fuel Pumps | 02-2010 | 83 KB | 18 KB | |||||||
| UFGS 33 52 43.28 Filter Separator, Aviation Fueling System | 11-2010 | 53 KB | 10 KB | |||||||
| UFGS 33 52 43 Aviation Fuel Distribution (Non-Hydrant) | 05-2011 | 108 KB | 28 KB | |||||||
| UFGS 33 52 80 Liquid Fuels Pipeline Coating Systems | 02-2010 | 62 KB | 13 KB | |||||||
| UFGS 33 52 90.00 20 Welding for POL Service Piping | 02-2010 | 68 KB | 16 KB | |||||||
| UFGS 33 56 10 Factory-Fabricated Fuel Storage Tanks | 01-2008 | 88 KB | 21 KB | |||||||
| UFGS 33 56 13.13 Steel Tanks With Fixed Roofs | 05-2012 | 115 KB | 29 KB | |||||||
| UFGS 33 56 13.15 Undertank Interstitial Space | 05-2012 | 62 KB | 13 KB | |||||||
| UFGS 33 56 53 Pressure Vessels for Storage of Compressed Gases | 04-2008 | 71 KB | 17 KB | |||||||
| UFGS 33 56 63 Fuel Impermeable Liner System | 04-2006 | 43 KB | 8 KB | |||||||
| UFGS 33 57 00 Bulk Fuel Receiving / Dispensing Equipment | 08-2011 | 104 KB | 26 KB | |||||||
| UFGS 33 58 00 Leak Detection for Fueling Systems | 04-2008 | 46 KB | 9 KB | |||||||
| UFGS 33 59 00 Tightness of Existing Underground Fuel Systems | 04-2007 | 40 KB | 8 KB | |||||||
| UFGS 33 60 00.00 10 Central High Temperature Water (HTW) Generating Plant and Auxiliaries | 04-2008 | 298 KB | 84 KB | |||||||
| UFGS 33 60 01 Valves, Piping, and Equipment in Valve Manholes | 04-2008 | 94 KB | 23 KB | |||||||
| UFGS 33 60 02 Aboveground Heat Distribution System | 04-2008 | 78 KB | 19 KB | |||||||
| UFGS 33 61 00 Prefabricated Underground Heating/Cooling Distribution System | 04-2008 | 65 KB | 15 KB | |||||||
| UFGS 33 61 13 Pre-Engineered Underground Heat Distribution System | 08-2010 | 124 KB | 32 KB | |||||||
| UFGS 33 61 14 Exterior Buried Preinsulated Water Piping | 02-2010 | 44 KB | 9 KB | |||||||
| UFGS 33 61 15 Heat Distribution Systems in Concrete Trenches | 07-2006 | 93 KB | 23 KB | |||||||
| UFGS 33 63 13 Exterior Underground Steam Distribution System | 04-2006 | 148 KB | 35 KB | |||||||
| UFGS 33 63 14 Exterior Buried Pumped Condensate Return | 04-2006 | 52 KB | 11 KB | |||||||
| UFGS 33 63 16 Exterior Shallow Trench Steam Distribution | 07-2006 | 55 KB | 12 KB | |||||||
| UFGS 33 63 23 Exterior Aboveground Steam Distribution | 04-2006 | 68 KB | 15 KB | |||||||
| UFGS 33 65 00 Cleaning Petroleum Storage Tanks | 08-2011 | 95 KB | 23 KB | |||||||
| UFGS 33 70 02.00 10 Electrical Distribution System, Underground | 11-2008 | 184 KB | 49 KB | |||||||
| UFGS 33 71 01.00 40 Overhead Transmission and Distribution | 11-2008 | 142 KB | 38 KB | |||||||
| UFGS 33 71 01 Overhead Transmission and Distribution | 07-2006 | 145 KB | 37 KB | |||||||
| UFGS 33 71 02.00 20 Underground Electrical Distribution | 08-2008 | 141 KB | 37 KB | |||||||
| UFGS 33 73 00.00 40 Utility Transformers | 11-2008 | 49 KB | 10 KB | |||||||
| UFGS 33 75 00.00 40 Switchgear and Protection Devices | 11-2008 | 59 KB | 14 KB | |||||||
| UFGS 33 77 19.00 40 Medium-Voltage Gas Switch | 08-2010 | 36 KB | 7 KB | |||||||
| UFGS 33 77 36.00 40 Medium-Voltage Utility Fuses | 05-2010 | 27 KB | 4 KB | |||||||
| UFGS 33 81 27 Pier Telephone Distribution Systems | 04-2006 | 35 KB | 6 KB | |||||||
| UFGS 33 82 00 Telecommunications Outside Plant (OSP) | 04-2006 | 106 KB | 26 KB | |||||||
| UFGS 33 82 33.00 10 Coaxial Cable Data Transmission Media | 04-2006 | 83 KB | 19 KB | |||||||
| Division 34 - Transportation | 05-2013 | 176 KB | |||||||
| UFGS 34 11 00 Railroad Track and Accessories | 04-2008 | 257 KB | 69 KB | |||||||
| UFGS 34 11 19.00 20 Welding Crane and Railroad Rail - Thermite Method | 04-2006 | 35 KB | 6 KB | |||||||
| UFGS 34 41 26.00 10 Access Control Point Control System | 02-2009 | 169 KB | 45 KB | |||||||
| UFGS 34 43 00.00 20 Airfield Lighting | 02-2010 | 117 KB | 29 KB | |||||||
| UFGS 34 71 13.19 Active Vehicle Barriers | 04-2008 | 78 KB | 16 KB | |||||||
| UFGS 34 73 13 Mooring and Grounding Points for Aircraft | 04-2008 | 38 KB | 7 KB | |||||||
| Division 35 - Waterway and Marine Construction | 05-2013 | 408 KB | |||||||
| UFGS 35 01 41.00 10 Electromechanical Operating Machinery for Locks | 04-2008 | 87 KB | 22 KB | |||||||
| UFGS 35 01 42.00 10 Vertical Gate Lift Systems | 04-2008 | 71 KB | 18 KB | |||||||
| UFGS 35 01 43 Wire Rope for Gate Operating Devices | 04-2008 | 44 KB | 8 KB | |||||||
| UFGS 35 20 14 Stoplogs | 04-2008 | 44 KB | 8 KB | |||||||
| UFGS 35 20 16.33 Miter Gates | 01-2008 | 66 KB | 15 KB | |||||||
| UFGS 35 20 16.39 Sector Gates | 01-2008 | 59 KB | 12 KB | |||||||
| UFGS 35 20 16.46 Tainter Gates and Anchorages | 01-2008 | 70 KB | 16 KB | |||||||
| UFGS 35 20 16.53 Vertical Lift Gates | 01-2008 | 75 KB | 15 KB | |||||||
| UFGS 35 20 16.59 Closure Gates | 01-2008 | 71 KB | 17 KB | |||||||
| UFGS 35 20 20 Electrical Equipment for Gate Hoist | 01-2008 | 103 KB | 23 KB | |||||||
| UFGS 35 20 23 Dredging | 04-2006 | 42 KB | 8 KB | |||||||
| UFGS 35 31 19.20 Articulating Concrete Block Revetments | 01-2008 | 64 KB | 15 KB | |||||||
| UFGS 35 31 19 Stone, Channel, Shoreline/Coastal Protection for Structures | 01-2008 | 273 KB | 70 KB | |||||||
| UFGS 35 41 00 Levee Construction | 01-2008 | 165 KB | 42 KB | |||||||
| UFGS 35 42 34 Reinforced Soil Slope | 01-2008 | 65 KB | 15 KB | |||||||
| UFGS 35 51 13.00 20 Concrete Floating Pier for Small Craft | 04-2006 | 70 KB | 16 KB | |||||||
| UFGS 35 59 13.13 Prestressed Concrete Fender Piling | 08-2009 | 87 KB | 21 KB | |||||||
| UFGS 35 59 13.14 20 Polymeric Fender Piles | 02-2010 | 64 KB | 14 KB | |||||||
| UFGS 35 59 13.16 Marine Fenders | 05-2011 | 81 KB | 17 KB | |||||||
| UFGS 35 59 13.19 Arch-Type Rubber Marine Fenders | 04-2006 | 32 KB | 5 KB | |||||||
| UFGS 35 73 13 Embankment for Earth Dams | 01-2008 | 85 KB | 19 KB | |||||||
| PROCESS EQUIPMENT SUBGROUP | |||||||||
| Division 40 - Process Integration | 05-2013 | 204 KB | |||||||
| UFGS 40 05 13 Pipelines, Liquid Process Piping | 10-2007 | 303 KB | 72 KB | |||||||
| UFGS 40 05 13.96 Welding Process Piping | 05-2010 | 59 KB | 13 KB | |||||||
| UFGS 40 17 26.00 20 Welding Pressure Piping | 04-2006 | 84 KB | 15 KB | |||||||
| UFGS 40 17 30.00 40 Welding General Piping | 08-2010 | 40 KB | 6 KB | |||||||
| UFGS 40 18 00.00 40 Vacuum Systems Process Piping | 02-2011 | 95 KB | 25 KB | |||||||
| UFGS 40 95 00 Process Control | 10-2007 | 206 KB | 58 KB | |||||||
| UFGS 40 95 33.23 20 Fiber Optic (FO) Outside Plant (OSP) Media | 04-2006 | 56 KB | 12 KB | |||||||
| Division 41 - Material Processing and Handling Equipment | 05-2013 | 256 KB | |||||||
| UFGS 41 22 13.13 Bridge Cranes | 04-2008 | 143 KB | 35 KB | |||||||
| UFGS 41 22 13.14 Bridge Cranes, Overhead Electric, Top Running | 04-2008 | 82 KB | 20 KB | |||||||
| UFGS 41 22 13.15 Bridge Cranes, Overhead Electric, Under Running | 04-2008 | 84 KB | 21 KB | |||||||
| UFGS 41 22 13.16 Gantry Cranes | 04-2008 | 131 KB | 34 KB | |||||||
| UFGS 41 22 13.33 Portal Crane Track Installation | 05-2010 | 77 KB | 17 KB | |||||||
| UFGS 41 22 23.19 Monorail Hoists | 04-2008 | 98 KB | 21 KB | |||||||
| UFGS 41 24 26 Hydraulic Fluid Power Systems | 01-2008 | 97 KB | 27 KB | |||||||
| UFGS 41 24 27.00 10 Hydraulic Power Systems for Civil Works Structures | 01-2008 | 105 KB | 27 KB | |||||||
| UFGS 41 36 30.00 10 Ultrasonic Inspection of Plates | 01-2008 | 71 KB | 16 KB | |||||||
| UFGS 41 65 10.00 10 Diesel/Natural Gas Fueled Engine Pump Drives | 05-2009 | 124 KB | 32 KB | |||||||
| Division 42 - Process Heating, Cooling and Drying Equipment | 05-2013 | 54 KB | |||||||
| UFGS 42 22 00.00 40 Process Chillers and Coolers | 05-2011 | 98 KB | 25 KB | |||||||
| UFGS 42 22 13.00 40 Centrifugal Process Chillers and Coolers | 02-2011 | 51 KB | 11 KB | |||||||
| UFGS 42 22 16.00 40 Reciprocating Process Chillers and Coolers | 05-2011 | 42 KB | 8 KB | |||||||
| UFGS 42 23 13.00 40 Process Condensers | 02-2011 | 41 KB | 7 KB | |||||||
| Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment | 05-2013 | 195 KB | |||||||
| UFGS 43 11 00 Fans/Blowers/Pumps; Off-Gas | 04-2008 | 115 KB | 29 KB | |||||||
| UFGS 43 13 13.13 Vapor Phase Activated Carbon Adsorption Units | 10-2007 | 75 KB | 18 KB | |||||||
| UFGS 43 15 00.00 20 Low Pressure Compressed Air Piping (Non-Breathing Air Type) | 04-2006 | 102 KB | 24 KB | |||||||
| UFGS 43 21 13 Pumps: Water, Centrifugal | 01-2008 | 76 KB | 20 KB | |||||||
| UFGS 43 21 29 Flow Measuring Equipment (Potable Water) (Sewage Treatment Plant) | 04-2006 | 48 KB | 10 KB | |||||||
| UFGS 43 21 39 Pumps: Water, Vertical Turbine | 04-2008 | 91 KB | 22 KB | |||||||
| UFGS 43 31 13.14 Downflow Liquid Activated Carbon Adsorption Units | 10-2007 | 98 KB | 23 KB | |||||||
| UFGS 43 31 14 Trickling Filter | 04-2006 | 44 KB | 10 KB | |||||||
| UFGS 43 32 69 Chemical Feed Systems | 04-2006 | 80 KB | 15 KB | |||||||
| UFGS 43 32 76 Chlorine-Feeding Machines (Automatic, Semiautomatic and Manual) | 01-2008 | 46 KB | 10 KB | |||||||
| UFGS 43 41 16.16 40 Vertical Atmospheric Tanks and Vessels | 02-2011 | 47 KB | 9 KB | |||||||
| Division 44 - Pollution and Waste Control Equipment | 05-2013 | 59 KB | |||||||
| UFGS 44 10 00 Air Pollution Control | 10-2007 | 149 KB | 37 KB | |||||||
| UFGS 44 13 52 Thermal (Catalytic) Oxidation Systems | 02-2011 | 90 KB | 21 KB | |||||||
| Division 46 - Water and Wastewater Equipment | 05-2013 | 393 KB | |||||||
| UFGS 46 07 53.13 Packaged Wastewater Treatment Equipment, Aeration | 02-2011 | 330 KB | 76 KB | |||||||
| UFGS 46 07 53.16 Packaged Wastewater Treatment Equipment, Biochemical | 02-2011 | 89 KB | 20 KB | |||||||
| UFGS 46 07 53.19 Composting Toilet | 02-2011 | 49 KB | 11 KB | |||||||
| UFGS 46 20 20 Sewage Bar Screen and Mechanical Shredder | 02-2011 | 43 KB | 9 KB | |||||||
| UFGS 46 23 00 Grit Removal and Handling Equipment | 02-2011 | 109 KB | 24 KB | |||||||
| UFGS 46 24 16 Comminutors | 02-2011 | 41 KB | 8 KB | |||||||
| UFGS 46 25 14 Coalescing [or Vertical Tube] Oil-Water Separators | 02-2011 | 68 KB | 16 KB | |||||||
| UFGS 46 30 13 Advanced Oxidation Processes (AOP) | 02-2011 | 120 KB | 30 KB | |||||||
| UFGS 46 43 21 Circular Clarifier Equipment | 02-2011 | 92 KB | 21 KB | |||||||
| UFGS 46 51 00.00 10 Air and Gas Diffusion Equipment | 02-2011 | 90 KB | 21 KB | |||||||
| UFGS 46 53 62 Continuous Loop Reactor Wastewater Treatment System | 02-2011 | 98 KB | 23 KB | |||||||
| UFGS 46 61 00 Filtration Equipment | 02-2011 | 110 KB | 26 KB | |||||||
| UFGS 46 66 56 Open-Channel Disinfection Equipment | 02-2011 | 63 KB | 16 KB | |||||||
| UFGS 46 71 16 Gravity Belt Thickeners | 02-2011 | 100 KB | 24 KB | |||||||
| UFGS 46 73 00.35 Sludge-Digester Gas, Heating, and Mixing System | 02-2011 | 70 KB | 15 KB | |||||||
| UFGS 46 73 10 Floating Cover for Sludge-Digestion Tanks | 02-2011 | 46 KB | 10 KB | |||||||
| UFGS 46 76 23.16 Recessed Chamber Filter Presses | 02-2011 | 139 KB | 36 KB | |||||||
| Division 48 - Electrical Power Generation | 05-2013 | 25 KB | |||||||
| UFGS 48 13 19.00 10 Turbine Oil | 11-2008 | 38 KB | 6 KB | |||||||
| UFGS 48 14 13.00 20 Solar Liquid Flat Plate Collectors | 05-2011 | 77 KB | 17 KB | |||||||