Search CCB

 

 Advanced Search

Construction Criteria Base

Unified Facilities Guide Specifications (UFGS)

The DoD Unified Facilities Criteria (UFC) program represents the facilities and infrastructure component of the Defense Standardization Program established by DoD Instruction 4120.24. For more information on the program including annual reports, visit dod.wbdg.org.

UFGS Master Updated May 9, 2014; Posted May 20, 2014

As of June 2008, updated UFGS will be posted quarterly in February, May, August and November.

Unified Facilities Guide Specifications (UFGS) are a joint effort of the U.S. Army Corps of Engineers (USACE), the Naval Facilities Engineering Command (NAVFAC), the Air Force Civil Engineer Center (HQ AFCEC) and the National Aeronautics and Space Administration (NASA). UFGS are for use in specifying construction for the military services.

The Unified Facilities Guide Specifications (UFGS) are published only in electronic format and are intended to be used with SpecsIntact software. The UFGS Master uses the latest CSI MasterFormat, therefore, as of January 2012, the UFGS Working Group decided to discontinue support of MasterFormat 1995. SpecsIntact version 4.5.1 and above will support MasterFormat 2010 and will no longer support the creation of Jobs or Masters using the old MasterFormat 1995 UFGS Master. For backward compatibility, Masters or Jobs created with older versions can still be opened using the latest software versions.

As of May 2013: The May 2013 release incorporates Automatic Paragraph Numbering. Versions of Specsintact older than 4.5.0 are not compatible with this feature. Existing jobs can be converted to the new automatic numbered format. The conversion is a one-way process. To convert, select the job or master, select process menu, choose convert Job/Master to Automatic numbering. More information about Automatic Paragraph Numbering is available on the Specsintact website.

For Specsintact Technical Support, please contact them directly:
Phone: 321-867-8800, E-mail, or visit their Website 

In addition, the SpecsIntact Knowledge Base can be found on their website.  This is the first resource  recommended for those who encounter any problems while using SpecsIntact, including those having problems publishing to Word or PDF formats.

UFGS that have been unified for use by all participating agencies have a level 3 or level 4 MasterFormat™ number. UFGS that are agency-specific have a fifth level number indicating it as an agency specific specification. A specification that has a fifth level number "10" indicates USACE, a "20" indicates NAVFAC, a "30" indicates AFCEC, and a "40" indicates NASA. Preparing agencies are indicated in the UFGS header of each specification. The user should follow this order of precedence in selecting UFGS sections:

1.  Regional UFGS specific to their Agency
2.  UFGS identified as specific to their Agency
3.  Unified UFGS if one is available<
4.  UFGS identified as specific to another DoD Agency (for DoD projects only)
5.  UFGS from another agency.

Points of contact and procedures for the development and maintenance of UFGS documents are prescribed in the latest edition of MIL-STD-3007.

Section templates for MasterFormat 2010 and MasterFormat 1995: These templates are provided to assist the user in creating a new section.

SpecsIntact for NMCI Users

Questions, comments, suggestions and recommended changes for guide specifications are welcome and should be submitted as a Criteria Change Request. To submit a Criteria Change Request, click on the CCR link next to the document below.

View Archived UFGS
These documents are available in the following formats:
Adobe Acrobat (PDF)
|
SpecsIntact (SEC) in compressed ZIP

Title Date Downloads CCR
UFGS MASTER 05-09-2014 15.5 MB
UFGS in PDF - All sections combined into one document. 05-2014 51.7 MB
UFGS Table of Contents 05-2014 63 KB
UFGS Graphics Table of Contents (also includes NAVFAC Regional Specifications Graphics) 05-2014 53 KB
Unified Master Reference List (UMRL) 04-2014 522 KB
UFGS Listing of Revisions and Changes since last update 05-2014 44 KB
UFGS Listing of Revisions, April 2006 to present 05-2014 323 KB
UFGS Master Database Tracking Chart: This document identifies which UFGS sections are currently being edited and at what stage of the review cycle each section is. 05-2014 2.3 MB
PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP
Division 00 - Procurement and Contracting Requirements 05-2014 55 KB
UFGS 00 01 15 List of Drawings 02-2011 21 KB  | 2 KB
UFGS 00 22 13.00 20 Supplementary Instructions to Offerors 02-2014 54 KB  | 9 KB
UFGS 00 41 00 Bid Schedules 01-2007 78 KB  | 6 KB
UFGS 00 73 01 Supplementary Conditions for Guantanamo Bay Projects 08-2008 53 KB  | 12 KB
UFGS 00 73 03 Supplementary Conditions for Azores Projects 08-2008 52 KB  | 12 KB
UFGS 00 73 04 Supplementary Conditions for Projects in Mediterranean Area 08-2008 52 KB  | 11 KB
SPECIFICATIONS GROUP
GENERAL REQUIREMENTS SUBGROUP
Division 01 - General Requirements 05-2014 599 KB
UFGS 01 11 00 Summary of Work 08-2011 43 KB  | 9 KB
UFGS 01 14 00 Work Restrictions 11-2011 149 KB  | 41 KB
UFGS 01 20 00.00 20 Price and Payment Procedures 11-2011 34 KB  | 7 KB
UFGS 01 20 01.00 10 Cost and Performance Report 04-2006 36 KB  | 7 KB
UFGS 01 22 00.00 10 Measurement and Payment 04-2006 33 KB  | 5 KB
UFGS 01 30 00 Administrative Requirements 11-2011 41 KB  | 9 KB
UFGS 01 32 01.00 10 Project Schedule 08-2008 62 KB  | 15 KB
UFGS 01 32 16.00 20 Construction Progress Documentation 11-2009 35 KB  | 3 KB
UFGS 01 32 17.00 20 Network Analysis Schedules (NAS) 08-2010 41 KB  | 9 KB
UFGS 01 33 00 Submittal Procedures 05-2011 85 KB  | 21 KB
UFGS 01 33 23.33 Aviation Fuel System Submittal Requirements 02-2010 24 KB  | 3 KB
UFGS 01 33 29.00 20 Sustainable Requirements 08-2013 55 KB  | 10 KB
UFGS 01 33 29 LEED(TM) Documentation 05-2012 41 KB  | 7 KB
UFGS 01 35 13 Special Project Procedures 11-2011 44 KB  | 10 KB
UFGS 01 35 26 Governmental Safety Requirements 02-2012 101 KB  | 27 KB
UFGS 01 35 29.13 Health, Safety, and Emergency Response Procedures for Contaminated Sites 01-2008 90 KB  | 23 KB
UFGS 01 35 40.00 20 Environmental Management 02-2010 48 KB  | 10 KB
UFGS 01 35 45.00 10 Chemical Data Quality Control 04-2006 60 KB  | 14 KB
UFGS 01 42 00 Sources for Reference Publications 08-2010 98 KB  | 24 KB
UFGS 01 42 15 Metric Measurements 02-2014 25 KB  | 4 KB
UFGS 01 45 00.00 10 Quality Control 02-2010 52 KB  | 12 KB
UFGS 01 45 00.00 20 Quality Control 11-2011 84 KB  | 21 KB
UFGS 01 45 00.00 40 Quality Control 05-2012 33 KB  | 6 KB
UFGS 01 45 00.10 10 Quality Control System (QCS) 02-2010 36 KB  | 7 KB
UFGS 01 45 00.10 20 Quality Control for Minor Construction 02-2010 43 KB  | 9 KB
UFGS 01 45 35 Special Inspections 08-2008 41 KB  | 8 KB
UFGS 01 50 00 Temporary Construction Facilities and Controls 08-2009 73 KB  | 19 KB
UFGS 01 57 16 Temporary Pest Control 04-2008 31 KB  | 5 KB
UFGS 01 57 19.00 20 Temporary Environmental Controls 11-2011 103 KB  | 27 KB
UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls 02-2010 164 KB  | 41 KB
UFGS 01 57 19.02 Temporary Environmental Controls (GTMO) 01-2008 66 KB  | 16 KB
UFGS 01 57 20.00 10 Environmental Protection 04-2006 82 KB  | 21 KB
UFGS 01 57 23 Temporary Storm Water Pollution 04-2008 57 KB  | 13 KB
UFGS 01 58 00 Project Identification 08-2009 39 KB  | 7 KB
UFGS 01 62 35 Recycled/Recovered/Biobased Materials 05-2013 28 KB  | 4 KB
UFGS 01 73 19 Installation of Government-Furnished Medical Equipment 04-2006 26 KB  | 3 KB
UFGS 01 74 19 Construction and Demolition Waste Management 01-2007 38 KB  | 8 KB
UFGS 01 75 00 Starting and Adjusting 05-2012 30 KB  | 4 KB
UFGS 01 78 00 Closeout Submittals 08-2011 62 KB  | 15 KB
UFGS 01 78 23 Operation and Maintenance Data 07-2006 41 KB  | 7 KB
UFGS 01 78 23.33 Operation and Maintenance Manuals for Aviation Fuel Systems 02-2010 51 KB  | 9 KB
UFGS 01 78 24.00 20 Facility Electronic Operation and Maintenance Support Information (eOMSI) 05-2014 60 KB  | 13 KB
UFGS 01 83 00.07 40 Reliability Centered Acceptance for Facility Shells 02-2012 39 KB  | 7 KB
UFGS 01 83 13.07 40 Reliability Centered Acceptance for Superstructure Performance Requirements 02-2012 40 KB  | 7 KB
UFGS 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems 02-2012 60 KB  | 10 KB
UFGS 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems 02-2012 68 KB  | 11 KB
UFGS 01 91 00.00 40 Commissioning 11-2012 51 KB  | 10 KB
FACILITY CONSTRUCTION SUBGROUP
Division 02 - Existing Conditions 05-2014 580 KB
UFGS 02 01 50 Operation, Maintenance and Process Monitoring for Soil Vapor Extraction (SVE) Systems 05-2010 84 KB  | 19 KB
UFGS 02 32 00 Subsurface Drilling, Sampling, and Testing 05-2010 87 KB  | 20 KB
UFGS 02 35 27 Soil-Bentonite (S-B) Slurry Trench 05-2010 77 KB  | 18 KB
UFGS 02 41 00 [Demolition] [and] [Deconstruction] 05-2010 78 KB  | 21 KB
UFGS 02 42 51 Carpet Removal and Reclamation 02-2012 30 KB  | 5 KB
UFGS 02 42 91 Removal and Salvage of Historic Building Materials 05-2010 28 KB  | 4 KB
UFGS 02 51 13 Precipitation/Coagulation/Flocculation Water Treatment 05-2010 119 KB  | 30 KB
UFGS 02 53 13 Remediation of Contaminated Soils and Sludges By Incineration 05-2010 100 KB  | 22 KB
UFGS 02 53 16 Remediation of Contaminated Soils By Thermal Desorption 02-2010 79 KB  | 18 KB
UFGS 02 54 20 Bioremediation of Soils Using Landfarming Systems 02-2010 157 KB  | 43 KB
UFGS 02 54 21 Bioremediation of Soils Using Windrow Composting 02-2010 134 KB  | 35 KB
UFGS 02 54 23 Soil Washing Through Separation/Solubilization 02-2010 102 KB  | 25 KB
UFGS 02 55 00 Solidification/Stabilization (S/S) of Contaminated Material 02-2010 49 KB  | 10 KB
UFGS 02 56 13 Waste Containment Geomembrane 02-2010 77 KB  | 16 KB
UFGS 02 56 14 Clay Barrier Layer 02-2010 53 KB  | 11 KB
UFGS 02 56 15 Geosynthetic Clay Liner (GCL) 02-2010 52 KB  | 11 KB
UFGS 02 61 13 Excavation and Handling of Contaminated Material 02-2010 62 KB  | 13 KB
UFGS 02 61 23 Removal and Disposal of PCB Contaminated Soils 04-2006 54 KB  | 12 KB
UFGS 02 62 16 Commissioning and Demonstration for Soil Vapor Extraction (SVE) Systems 02-2010 99 KB  | 17 KB
UFGS 02 65 00 Underground Storage Tank Removal 02-2010 119 KB  | 30 KB
UFGS 02 66 00 Select Fill and Topsoil for Landfill Cover 02-2010 43 KB  | 8 KB
UFGS 02 66 10 Test Fill 02-2010 41 KB  | 7 KB
UFGS 02 81 00 Transportation and Disposal of Hazardous Materials 02-2010 57 KB  | 12 KB
UFGS 02 82 14.00 10 Asbestos Hazard Control Activities 02-2010 164 KB  | 46 KB
UFGS 02 82 16.00 20 Engineering Control of Asbestos Containing Materials 08-2011 103 KB  | 24 KB
UFGS 02 82 33.13 20 Removal/Control and Disposal of Paint with Lead 08-2011 79 KB  | 18 KB
UFGS 02 83 13.00 20 Lead in Construction 08-2011 73 KB  | 17 KB
UFGS 02 83 19.00 10 Lead Based Paint Hazard Abatement, Target Housing and Child Occupied Facilities 02-2010 54 KB  | 11 KB
UFGS 02 84 16 Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury 04-2006 41 KB  | 7 KB
UFGS 02 84 33 Removal and Disposal of Polychlorinated Biphenyls (PCBs) 04-2006 53 KB  | 11 KB
UFGS 02 85 00.00 20 Mold Remediation 05-2011 95 KB  | 24 KB
Division 03 - Concrete 05-2014 669 KB
UFGS 03 01 30.71 Concrete Rehabilitation 04-2006 42 KB  | 7 KB
UFGS 03 01 30 Restoration of Concrete in Historic Structures 11-2009 81 KB  | 20 KB
UFGS 03 01 32 Concrete Rehabilitation for Civil Works 11-2009 198 KB  | 49 KB
UFGS 03 11 13.00 10 Structural Cast-In-Place Concrete Forming 05-2014 31 KB  | 5 KB
UFGS 03 11 19.00 10 Insulating Concrete Forming 05-2014 48 KB  | 10 KB
UFGS 03 15 00.00 10 Concrete Accessories 05-2014 50 KB  | 11 KB
UFGS 03 20 00.00 10 Concrete Reinforcing 05-2014 50 KB  | 10 KB
UFGS 03 23 00 Steel Stressing Tendons and Accessories for Prestressed Concrete 11-2009 41 KB  | 8 KB
UFGS 03 30 00.00 10 Cast-In-Place Concrete 05-2014 154 KB  | 41 KB
UFGS 03 30 00 Cast-In-Place Concrete 05-2014 188 KB  | 48 KB
UFGS 03 30 53 Miscellaneous Cast-In-Place Concrete 05-2014 69 KB  | 15 KB
UFGS 03 31 01.00 10 Cast-In-Place Structural Concrete for Civil Works 05-2014 104 KB  | 26 KB
UFGS 03 31 29 Marine Concrete 08-2012 188 KB  | 51 KB
UFGS 03 33 00 Cast-In-Place Architectural Concrete 11-2009 30 KB  | 4 KB
UFGS 03 35 00.00 10 Concrete Finishing 05-2014 55 KB  | 12 KB
UFGS 03 37 00 Preplaced-Aggregate Concrete 11-2009 114 KB  | 28 KB
UFGS 03 37 13 Shotcrete 11-2009 61 KB  | 13 KB
UFGS 03 37 23 Roller-Compacted Concrete for Mass Concrete Construction 11-2009 193 KB  | 51 KB
UFGS 03 37 29 Concrete for Concrete Cutoff Walls 11-2009 108 KB  | 26 KB
UFGS 03 39 00.00 10 Concrete Curing 05-2014 27 KB  | 4 KB
UFGS 03 40 00.00 10 Plant-Precast Concrete Products for Below Grade Construction 08-2006 63 KB  | 13 KB
UFGS 03 41 16.08 Precast Concrete Slabs (MAX. SPAN 8'- 0" O.C.) 08-2012 50 KB  | 9 KB
UFGS 03 41 33 Precast Structural Pretensioned Concrete 02-2011 121 KB  | 25 KB
UFGS 03 44 00 Reinforced Autoclave Aerated Concrete Panels 02-2013 83 KB  | 17 KB
UFGS 03 45 00 Precast Architectural Concrete 11-2011 130 KB  | 30 KB
UFGS 03 45 33 Precast [Prestressed] Structural Concrete 04-2008 79 KB  | 18 KB
UFGS 03 47 13 Tilt-Up Concrete 08-2008 41 KB  | 7 KB
UFGS 03 51 01 Precast Roof Decks 01-2008 29 KB  | 5 KB
UFGS 03 52 00 Lightweight Concrete Roof Insulation 08-2011 41 KB  | 7 KB
UFGS 03 52 16.19 Lightweight Insulation Concrete Overlay 08-2011 41 KB  | 7 KB
UFGS 03 52 16 Lightweight Insulation Concrete 04-2008 35 KB  | 6 KB
UFGS 03 53 14.00 20 Light Reflective Nonferrous Metallic Aggregate Floor System 02-2010 33 KB  | 6 KB
UFGS 03 55 16 Gypsum Concrete Floor Planks 04-2008 30 KB  | 5 KB
UFGS 03 62 16 Metallic Non-Shrink Grouting 02-2012 28 KB  | 4 KB
UFGS 03 70 00 Mass Concrete 02-2010 216 KB  | 54 KB
Division 04 - Masonry 05-2014 146 KB
UFGS 04 01 00.91 Restoration and Cleaning of Masonry in Historic Structures 05-2012 102 KB  | 27 KB
UFGS 04 01 20 Rehabilitation of Reinforced and Unreinforced Masonry Walls Using FRP Composite Structural Repointing 10-2007 68 KB  | 16 KB
UFGS 04 01 21 Rehabilitation of Reinforced and Unreinforced Masonry Walls Using Surface Applied FRP Composites 10-2007 79 KB  | 19 KB
UFGS 04 20 00 Masonry 02-2011 180 KB  | 47 KB
UFGS 04 21 13.13 Nonbearing Masonry Veneer/Steel Stud Walls 10-2007 82 KB  | 20 KB
UFGS 04 21 26 Glazed Structural Clay Tile and Prefaced Concrete Masonry Units 11-2009 39 KB  | 7 KB
UFGS 04 23 00 Glass Masonry Units 11-2009 34 KB  | 6 KB
Division 05 - Metals 05-2014 219 KB
UFGS 05 05 23.13 10 Ultrasonic Inspection of Weldments 05-2014 40 KB  | 8 KB
UFGS 05 05 23.16 Structural Welding 05-2014 44 KB  | 9 KB
UFGS 05 12 00 Structural Steel 05-2014 66 KB  | 14 KB
UFGS 05 14 00.13 Welding Structural Aluminum Framing 11-2010 36 KB  | 6 KB
UFGS 05 21 13 Deep Longspan Steel Joist Framing 08-2009 32 KB  | 5 KB
UFGS 05 21 16 Longspan Steel Joist Framing 08-2009 32 KB  | 5 KB
UFGS 05 21 19 Open Web Steel Joist Framing 07-2007 30 KB  | 4 KB
UFGS 05 21 23 Steel Joist Girder Framing 07-2007 30 KB  | 4 KB
UFGS 05 30 00 Steel Decks 11-2011 85 KB  | 19 KB
UFGS 05 40 00 Cold-Formed Metal Framing 05-2010 47 KB  | 9 KB
UFGS 05 50 13 Miscellaneous Metal Fabrications 05-2010 73 KB  | 17 KB
UFGS 05 50 14 Structural Metal Fabrications 05-2014 68 KB  | 17 KB
UFGS 05 50 15 Civil Works Fabrications 05-2014 75 KB  | 17 KB
UFGS 05 51 00 Metal Stairs 02-2012 57 KB  | 11 KB
UFGS 05 51 33 Metal Ladders 05-2010 38 KB  | 7 KB
UFGS 05 52 00 Metal Railings 02-2011 53 KB  | 10 KB
UFGS 05 59 10 Rolling Cover for Aviation Refueling Vaults 02-2010 43 KB  | 9 KB
UFGS 05 59 13 Fabrication of Hydraulic Steel Structures 08-2009 106 KB  | 28 KB
UFGS 05 72 00 Decorative Metal Specialties 02-2012 58 KB  | 11 KB
Division 06 - Wood, Plastics and Composites 05-2014 123 KB
UFGS 06 10 00 Rough Carpentry 02-2012 152 KB  | 36 KB
UFGS 06 13 33 Pier Timberwork 04-2006 41 KB  | 8 KB
UFGS 06 18 00 Glue-Laminated Construction 11-2013 40 KB  | 7 KB
UFGS 06 20 00 Finish Carpentry 02-2012 73 KB  | 16 KB
UFGS 06 41 16.00 10 Laminate Clad Architectural Casework 08-2010 76 KB  | 16 KB
UFGS 06 61 16 Solid Polymer (Solid Surfacing) Fabrications 08-2010 62 KB  | 13 KB
UFGS 06 71 33 Fiberglass Reinforced Plastic (FRP) Ladders 05-2012 41 KB  | 8 KB
UFGS 06 73 01 Fiberglass Reinforced Plastic (FRP) Grating 02-2012 37 KB  | 7 KB
UFGS 06 82 14 Fiberglass Reinforced Plastic (FRP) Pipe and Tube Railings 05-2012 46 KB  | 9 KB
Division 07 - Thermal and Moisture Protection 05-2014 554 KB
UFGS 07 05 23 Pressure Testing an Air Barrier System for Air Tightness 05-2014 90 KB  | 25 KB
UFGS 07 11 13 Bituminous Dampproofing 08-2011 35 KB  | 6 KB
UFGS 07 12 00 Built-Up Bituminous Waterproofing 04-2006 50 KB  | 10 KB
UFGS 07 13 53 Elastomeric Sheet Waterproofing 04-2006 46 KB  | 9 KB
UFGS 07 14 00 Fluid-Applied Waterproofing 02-2012 48 KB  | 10 KB
UFGS 07 16 19 Metallic Oxide Waterproofing 01-2007 39 KB  | 7 KB
UFGS 07 17 00 Bentonite Waterproofing 04-2006 27 KB  | 4 KB
UFGS 07 19 00 Water Repellents 05-2011 50 KB  | 9 KB
UFGS 07 21 13 Board and Block Insulation 05-2011 65 KB  | 12 KB
UFGS 07 21 16 Mineral Fiber Blanket Insulation 11-2011 44 KB  | 9 KB
UFGS 07 21 23 Loose Fill Thermal Insulation 05-2011 44 KB  | 9 KB
UFGS 07 22 00 Roof and Deck Insulation 08-2011 88 KB  | 20 KB
UFGS 07 24 00 Exterior Insulation and Finish Systems 05-2011 79 KB  | 19 KB
UFGS 07 27 10.00 10 Building Air Barrier System 05-2014 61 KB  | 14 KB
UFGS 07 31 13 Asphalt Shingles 11-2011 59 KB  | 12 KB
UFGS 07 31 26 Slate Roofing 08-2009 43 KB  | 9 KB
UFGS 07 32 13 Roof Tiles 04-2006 43 KB  | 7 KB
UFGS 07 32 14 Clay Tile Roofing Replacement or Repair 04-2006 52 KB  | 10 KB
UFGS 07 41 13 Metal Roof Panels 05-2011 111 KB  | 28 KB
UFGS 07 41 63 Fabricated Roof Panel Assemblies 05-2009 95 KB  | 23 KB
UFGS 07 42 13 Metal Wall Panels 05-2011 75 KB  | 17 KB
UFGS 07 42 63 Fabricated Wall Panel Assemblies 05-2011 75 KB  | 17 KB
UFGS 07 51 13 Built-Up Asphalt Roofing 05-2012 115 KB  | 28 KB
UFGS 07 52 00 Modified Bituminous Membrane Roofing 05-2012 132 KB  | 34 KB
UFGS 07 53 23 Ethylene-Propylene-Diene-Monomer Roofing 05-2012 100 KB  | 24 KB
UFGS 07 54 19 Polyvinyl Chloride Roofing 02-2013 91 KB  | 23 KB
UFGS 07 55 00 Protected Membrane Roofing (PMR) 08-2009 43 KB  | 9 KB
UFGS 07 57 13 Sprayed Polyurethane Foam (SPF) Roofing 05-2011 126 KB  | 25 KB
UFGS 07 60 00 Flashing and Sheet Metal 08-2008 103 KB  | 20 KB
UFGS 07 61 01 Copper Roof System 08-2009 40 KB  | 8 KB
UFGS 07 61 14.00 20 Steel Standing Seam Roofing 05-2011 76 KB  | 19 KB
UFGS 07 61 15.00 20 Aluminum Standing Seam Roofing 05-2011 74 KB  | 18 KB
UFGS 07 62 10 Copper Sheet Metal Flashing 08-2009 50 KB  | 11 KB
UFGS 07 72 00 Roof Ventilators, Gravity-Type 08-2009 32 KB  | 5 KB
UFGS 07 81 00 Spray-Applied Fireproofing 02-2011 52 KB  | 10 KB
UFGS 07 84 00 Firestopping 05-2010 43 KB  | 8 KB
UFGS 07 92 00 Joint Sealants 01-2007 48 KB  | 9 KB
Division 08 - Openings 05-2014 588 KB
UFGS 08 11 13 Steel Doors and Frames 02-2010 57 KB  | 12 KB
UFGS 08 11 16 Aluminum Doors and Frames 08-2008 45 KB  | 9 KB
UFGS 08 11 69 Metal Storm Doors 02-2010 36 KB  | 6 KB
UFGS 08 11 73 Sliding Fire Doors 01-2007 42 KB  | 8 KB
UFGS 08 13 73 Sliding Metal Doors 02-2011 60 KB  | 14 KB
UFGS 08 14 00 Wood Doors 08-2011 54 KB  | 11 KB
UFGS 08 22 20 Fiberglass Reinforced Plastic (FRP) Doors and Frames 05-2009 52 KB  | 11 KB
UFGS 08 32 13 Aluminum Sliding Glass Doors 11-2008 37 KB  | 7 KB
UFGS 08 33 13 Metal Rolling Counter Doors 05-2009 37 KB  | 7 KB
UFGS 08 33 23 Overhead Coiling Doors 07-2007 64 KB  | 14 KB
UFGS 08 34 01 Forced Entry Resistant Components 08-2009 77 KB  | 18 KB
UFGS 08 34 02 Bullet-Resistant Components 08-2009 85 KB  | 21 KB
UFGS 08 34 16.10 Steel Sliding Hangar Doors 04-2006 68 KB  | 15 KB
UFGS 08 34 16.20 Vertical Lift Fabric Doors 05-2014 90 KB  | 20 KB
UFGS 08 34 16 Corrosion Control Hangar Doors 04-2006 90 KB  | 25 KB
UFGS 08 34 19.10 20 Rolling Service [and Fire] Doors 02-2012 45 KB  | 9 KB
UFGS 08 34 49.00 20 Hemp Shielded Door 04-2006 68 KB  | 16 KB
UFGS 08 34 53 Security Doors and Frames 08-2008 27 KB  | 4 KB
UFGS 08 34 59 Vault Doors and Day Gates 08-2008 30 KB  | 5 KB
UFGS 08 34 63 Detention Hollow Metal Frames, Doors, and Door Frames 05-2011 41 KB  | 8 KB
UFGS 08 34 73 Sound Control Door Assemblies 05-2012 59 KB  | 12 KB
UFGS 08 36 13 Sectional Overhead Doors 08-2011 45 KB  | 9 KB
UFGS 08 36 19 Vertical Lift Doors 11-2011 41 KB  | 8 KB
UFGS 08 39 53 Blast Resistant Doors (Oval Arch Magazines) 04-2006 38 KB  | 7 KB
UFGS 08 39 54 Blast Resistant Doors 08-2009 90 KB  | 20 KB
UFGS 08 41 13 Aluminum-Framed Entrances and Storefronts 02-2011 47 KB  | 9 KB
UFGS 08 44 00 Curtain Wall and Glazed Assemblies 08-2011 143 KB  | 35 KB
UFGS 08 51 13 Aluminum Windows 05-2011 83 KB  | 19 KB
UFGS 08 51 23 Steel Windows 08-2011 66 KB  | 15 KB
UFGS 08 51 69.10 Aluminum Storm Windows 04-2006 30 KB  | 5 KB
UFGS 08 52 00 Wood Windows 08-2011 51 KB  | 10 KB
UFGS 08 52 70 Wood Windows - Repair and Rehabilitation 08-2009 38 KB  | 7 KB
UFGS 08 53 00 Plastic Windows 08-2011 56 KB  | 12 KB
UFGS 08 56 46.10 20 Radio Frequency Shielded Enclosures, Demountable Type 08-2011 59 KB  | 13 KB
UFGS 08 56 46.20 20 Radio Frequency Shielded Enclosures, Welded Type 08-2011 63 KB  | 15 KB
UFGS 08 56 53 Blast Resistant Tempered Glass Windows 08-2011 54 KB  | 10 KB
UFGS 08 56 63 Detention and Security Windows 04-2006 33 KB  | 5 KB
UFGS 08 60 45 [Skylights] [and] [Translucent Panels] 02-2012 56 KB  | 13 KB
UFGS 08 71 00 Door Hardware 08-2008 73 KB  | 16 KB
UFGS 08 71 63.10 Electrical Locking Control for Brigs 04-2006 58 KB  | 13 KB
UFGS 08 71 63 Detention Hardware 04-2006 57 KB  | 9 KB
UFGS 08 81 00 Glazing 08-2011 96 KB  | 22 KB
UFGS 08 87 16 Fragment Retention Film for Glass 08-2009 43 KB  | 9 KB
UFGS 08 88 53 Detention and Security Glazing 05-2011 34 KB  | 5 KB
UFGS 08 88 58 Air Traffic Control Tower Cab Glass 05-2014 87 KB  | 21 KB
UFGS 08 91 00 Metal [Wall] [and] [Door] Louvers 05-2011 36 KB  | 6 KB
Division 09 - Finishes 05-2014 703 KB
UFGS 09 06 90 Color Schedule 05-2009 46 KB  | 6 KB
UFGS 09 22 00 Supports for Plaster and Gypsum Board 02-2010 30 KB  | 4 KB
UFGS 09 22 36 Lath 01-2008 36 KB  | 6 KB
UFGS 09 23 00 Gypsum Plastering 08-2010 57 KB  | 11 KB
UFGS 09 23 82 Fireproof Gypsum Plastering 05-2010 27 KB  | 4 KB
UFGS 09 24 23 Stucco 05-2009 39 KB  | 7 KB
UFGS 09 26 00 Veneer Plaster 05-2011 43 KB  | 8 KB
UFGS 09 29 00 Gypsum Board 05-2011 74 KB  | 15 KB
UFGS 09 30 13 Ceramic Tiling 11-2013 65 KB  | 14 KB
UFGS 09 35 16 Chemical-Resistant Quarry Tile 08-2010 37 KB  | 7 KB
UFGS 09 51 00 Acoustical Ceilings 08-2010 74 KB  | 16 KB
UFGS 09 62 38 Static-Control Flooring 11-2012 62 KB  | 13 KB
UFGS 09 64 00 Portable (Demountable) Wood Flooring 08-2010 40 KB  | 7 KB
UFGS 09 64 23 Wood Parquet Flooring 08-2010 42 KB  | 8 KB
UFGS 09 64 29 Wood Strip Flooring 08-2010 40 KB  | 8 KB
UFGS 09 64 66 Wood Athletic Flooring 08-2010 66 KB  | 14 KB
UFGS 09 65 00 Resilient Flooring 08-2010 63 KB  | 13 KB
UFGS 09 65 66 Resilient Athletic Flooring 08-2010 42 KB  | 8 KB
UFGS 09 66 13 Portland Cement Terrazzo 08-2010 36 KB  | 6 KB
UFGS 09 66 16 Terrazzo Tile 08-2010 34 KB  | 6 KB
UFGS 09 66 23 Resinous Terrazzo Flooring 08-2010 33 KB  | 6 KB
UFGS 09 67 23.13 Standard Resinous Flooring 08-2010 54 KB  | 10 KB
UFGS 09 67 23.14 Chemical Resistive Resinous Flooring 08-2010 57 KB  | 12 KB
UFGS 09 67 23.15 Fuel Resistive Resinous Flooring, 3-Coat System 08-2010 96 KB  | 19 KB
UFGS 09 67 23.16 Fuel Resistive Resinous Flooring, 5-Coat System 08-2010 115 KB  | 23 KB
UFGS 09 68 00 Carpeting 11-2013 62 KB  | 14 KB
UFGS 09 69 13 Rigid Grid Access Flooring 11-2010 88 KB  | 22 KB
UFGS 09 69 19 Stringerless Access Flooring 11-2010 82 KB  | 20 KB
UFGS 09 72 00 Wallcoverings 11-2012 55 KB  | 12 KB
UFGS 09 83 13 Acoustical Wall Treatment 08-2010 32 KB  | 5 KB
UFGS 09 90 00 Paints and Coatings 05-2011 193 KB  | 41 KB
UFGS 09 96 00 High-Performance Coatings 07-2007 49 KB  | 9 KB
UFGS 09 96 59 High-Build Glaze Coatings 05-2011 42 KB  | 8 KB
UFGS 09 97 01.00 10 Metallizing: Hydraulic Structures 05-2009 92 KB  | 23 KB
UFGS 09 97 02 Painting: Hydraulic Structures 11-2009 231 KB  | 60 KB
UFGS 09 97 13.00 40 Steel Coatings 07-2007 41 KB  | 8 KB
UFGS 09 97 13.15 Epoxy/Fluoropolyurethane Interior Coating of Welded Steel Petroleum Fuel Tanks 02-2010 143 KB  | 33 KB
UFGS 09 97 13.16 Interior Coating of Welded Steel Water Tanks 05-2011 156 KB  | 31 KB
UFGS 09 97 13.17 Three Coat Epoxy Interior Coating of Welded Steel Petroleum Fuel Tanks 02-2010 131 KB  | 30 KB
UFGS 09 97 13.25 Maintenance, Repair, and Coating of Tall Antenna Towers 05-2011 163 KB  | 32 KB
UFGS 09 97 13.26 Coating of Steel Waterfront Structures 04-2006 36 KB  | 6 KB
UFGS 09 97 13.27 Exterior Coating of Steel Structures 02-2010 131 KB  | 31 KB
UFGS 09 97 13.28 Protection of Buried Steel Piping and Steel Bulkhead Tie Rods 02-2010 38 KB  | 6 KB
UFGS 09 97 23.13 Interior Lining For Concrete Storage Tanks (For Petroleum Fuels) 05-2011 74 KB  | 17 KB
UFGS 09 97 23.16 Linseed Oil Protection of Concrete Surfaces 11-2010 24 KB  | 3 KB
UFGS 09 97 23 Metallic Type Conductive/Spark Resistant Concrete Floor Finish 04-2006 46 KB  | 9 KB
UFGS 09 97 30 Preparation of Historic Wood and Metal Surfaces for Painting 05-2009 43 KB  | 9 KB
Division 10 - Specialties 05-2014 154 KB
UFGS 10 10 00 Visual Communications Specialties 02-2009 48 KB  | 10 KB
UFGS 10 14 00.20 Interior Signage 11-2012 58 KB  | 13 KB
UFGS 10 14 01 Exterior Signage 04-2006 59 KB  | 13 KB
UFGS 10 21 13 Toilet Compartments 01-2007 60 KB  | 13 KB
UFGS 10 21 23.16 Cubicle Track and Hardware 04-2006 29 KB  | 4 KB
UFGS 10 22 13 Wire Mesh Partitions 08-2010 36 KB  | 5 KB
UFGS 10 22 19 Demountable Moveable Partitions 08-2010 42 KB  | 8 KB
UFGS 10 22 26.13 Accordion Folding Partitions 08-2010 46 KB  | 8 KB
UFGS 10 22 26.23 Coiling Partitions 08-2010 45 KB  | 8 KB
UFGS 10 22 39 Folding Panel Partitions 05-2011 48 KB  | 10 KB
UFGS 10 22 43 Sliding Partitions 05-2011 49 KB  | 10 KB
UFGS 10 26 13 Wall and Corner Guards 08-2010 42 KB  | 8 KB
UFGS 10 28 13 Toilet Accessories 07-2006 51 KB  | 11 KB
UFGS 10 44 16 Fire Extinguishers 05-2012 35 KB  | 5 KB
UFGS 10 51 13 Metal Lockers 05-2011 40 KB  | 6 KB
UFGS 10 56 13 Steel Shelving 04-2006 29 KB  | 4 KB
UFGS 10 71 13.13 Storm Shutters 04-2006 49 KB  | 9 KB
Division 11 - Equipment 05-2014 260 KB
UFGS 11 05 40 Common Work Results for Foodservice Equipment 08-2008 76 KB  | 18 KB
UFGS 11 06 40.13 Foodservice Equipment Schedule 01-2008 55 KB  | 8 KB
UFGS 11 13 10 Dock Levelers 08-2009 57 KB  | 13 KB
UFGS 11 24 27 Air Stripper 10-2007 77 KB  | 19 KB
UFGS 11 27 13 Radiographic Darkroom Equipment 04-2006 41 KB  | 7 KB
UFGS 11 31 13 Electric Kitchen Equipment 08-2008 37 KB  | 7 KB
UFGS 11 41 11 Refrigerated and Frozen Food Storage Equipment 01-2008 49 KB  | 10 KB
UFGS 11 42 00 Food Preparation Equipment 01-2008 34 KB  | 5 KB
UFGS 11 44 00 Food Cooking Equipment 01-2008 75 KB  | 14 KB
UFGS 11 46 00 Food Dispensing Equipment 01-2008 36 KB  | 6 KB
UFGS 11 47 00 Ice Machines 02-2009 32 KB  | 5 KB
UFGS 11 48 00 Cleaning and Disposal Equipment 01-2008 83 KB  | 18 KB
UFGS 11 53 00 Laboratory Equipment and Fumehoods 05-2011 50 KB  | 9 KB
UFGS 11 68 13 Playground Equipment 02-2009 72 KB  | 16 KB
UFGS 11 70 00 General Requirements for Medical and Dental Equipment 05-2011 39 KB  | 8 KB
UFGS 11 71 00 Warming Cabinets, Sterilizers, and Associated Equipment 02-2009 83 KB  | 21 KB
UFGS 11 72 13 Medical Equipment, Miscellaneous 04-2006 43 KB  | 8 KB
UFGS 11 74 00 Dental Equipment 04-2006 34 KB  | 6 KB
UFGS 11 82 20 Incinerators, General Purpose 08-2008 182 KB  | 54 KB
Division 12 - Furnishings 05-2014 163 KB
UFGS 12 21 00 Window Blinds 08-2010 43 KB  | 9 KB
UFGS 12 22 00 Curtains and Drapes 08-2010 49 KB  | 10 KB
UFGS 12 24 13 Roller Window Shades 08-2010 39 KB  | 9 KB
UFGS 12 31 00 Manufactured Metal Casework 05-2009 69 KB  | 15 KB
UFGS 12 32 00 Manufactured Wood Casework 11-2013 64 KB  | 11 KB
UFGS 12 34 00 Manufactured Plastic Casework 05-2010 40 KB  | 7 KB
UFGS 12 35 20 Foodservice Casework, Countertops and Accessories 08-2010 45 KB  | 8 KB
UFGS 12 35 70 Medical and Dental Casework 08-2010 33 KB  | 6 KB
UFGS 12 36 00.00 20 Manufactured Vanities 08-2011 26 KB  | 3 KB
UFGS 12 36 00 Countertops 05-2009 52 KB  | 10 KB
UFGS 12 48 13 Entrance Floor Mats and Frames 02-2014 34 KB  | 6 KB
UFGS 12 50 00 Furniture Systems 02-2009 97 KB  | 26 KB
UFGS 12 55 00 Detention Furniture and Accessories 04-2006 29 KB  | 5 KB
UFGS 12 65 00 Fixed Seating 08-2008 50 KB  | 11 KB
UFGS 12 93 00 Site Furnishings 02-2009 94 KB  | 20 KB
Division 13 - Special Construction 05-2014 127 KB
UFGS 13 17 43 Hydrotherapy Equipment 02-2011 31 KB  | 5 KB
UFGS 13 21 26 Cold-Storage Rooms (Prefabricated Panel Type) 04-2006 33 KB  | 5 KB
UFGS 13 21 48 Prefabricated Audiometric Rooms 04-2006 45 KB  | 8 KB
UFGS 13 27 54.00 10 Electromagnetic (EM) Shielding 10-2007 157 KB  | 44 KB
UFGS 13 34 19 Metal Building Systems 11-2011 115 KB  | 28 KB
UFGS 13 48 00.00 10 Seismic Protection for Mechanical Equipment 10-2007 49 KB  | 9 KB
UFGS 13 48 00 Seismic Protection for Miscellaneous Equipment 08-2008 53 KB  | 11 KB
UFGS 13 49 19 X-Ray Shielding 02-2009 61 KB  | 13 KB
Division 14 - Conveying Equipment 05-2014 91 KB
UFGS 14 21 00.00 20 Electric Traction Elevators 05-2012 85 KB  | 19 KB
UFGS 14 21 13 Electric Traction Freight Elevators 02-2009 81 KB  | 19 KB
UFGS 14 21 23 Electric Traction Passenger Elevators 02-2009 84 KB  | 19 KB
UFGS 14 24 00 Hydraulic Elevators 08-2010 93 KB  | 22 KB
UFGS 14 92 00 Pneumatic-Tube System 02-2009 45 KB  | 10 KB
FACILITY SERVICES SUBGROUP
Division 21 - Fire Suppression 05-2014 439 KB
UFGS 21 12 00 Standpipe Systems 05-2011 63 KB  | 13 KB
UFGS 21 13 00.00 40 Fire-Suppression Sprinkler Systems 08-2013 93 KB  | 22 KB
UFGS 21 13 13.00 10 Wet Pipe Sprinkler System, Fire Protection 05-2009 89 KB  | 22 KB
UFGS 21 13 13.00 20 Wet-Pipe Sprinkler System, Fire Protection 04-2008 76 KB  | 18 KB
UFGS 21 13 16.00 20 Dry-Pipe Fire Sprinkler Systems 04-2006 58 KB  | 14 KB
UFGS 21 13 17.00 10 Dry Pipe Sprinkler System, Fire Protection 05-2009 85 KB  | 21 KB
UFGS 21 13 18.00 10 Preaction and Deluge Sprinkler Systems, Fire Protection 05-2009 106 KB  | 27 KB
UFGS 21 13 19.00 20 [Deluge] [Preaction] Fire Sprinkler Systems 11-2009 71 KB  | 17 KB
UFGS 21 13 20.00 20 Foam Fire Extinguishing for Aircraft Hangars 11-2009 123 KB  | 31 KB
UFGS 21 13 21.00 20 Foam Fire Extinguishing for Fuel Tank Protection 11-2009 121 KB  | 30 KB
UFGS 21 13 22.00 20 Foam Fire Extinguishing for Haz/Flam Material Facility 11-2009 127 KB  | 32 KB
UFGS 21 13 24.00 10 Aqueous Film-Forming Foam (AFFF) Fire Protection System 10-2007 105 KB  | 28 KB
UFGS 21 13 26.00 40 Deluge Fire-Suppression Sprinkler Systems 08-2013 69 KB  | 16 KB
UFGS 21 21 00.00 40 Carbon-Dioxide Fire Extinguishing Systems 11-2013 52 KB  | 11 KB
UFGS 21 21 00 Fire Extinguishing Sprinkler Systems (Residential) 04-2006 57 KB  | 12 KB
UFGS 21 21 01.00 20 Carbon Dioxide Fire Extinguishing (High Pressure) 11-2009 68 KB  | 16 KB
UFGS 21 21 02.00 20 Carbon Dioxide Fire Extinguishing (Low Pressure) 11-2009 83 KB  | 20 KB
UFGS 21 21 03.00 10 Wet Chemical Fire Extinguishing System 02-2009 35 KB  | 6 KB
UFGS 21 22 00.00 20 Halon 1301 Fire Extinguishing 05-2011 75 KB  | 18 KB
UFGS 21 22 00.00 40 Clean Agent Fire Extinguishing Systems 05-2013 71 KB  | 17 KB
UFGS 21 23 00.00 20 Wet Chemical Fire Extinguishing for Kitchen Cabinet 04-2006 37 KB  | 7 KB
UFGS 21 30 00 Fire Pumps 04-2008 118 KB  | 31 KB
Division 22 - Plumbing 05-2014 543 KB
UFGS 22 00 00 Plumbing, General Purpose 11-2011 287 KB  | 73 KB
UFGS 22 00 70 Plumbing, Healthcare Facilities 11-2011 246 KB  | 67 KB
UFGS 22 05 48.00 20 Mechanical Sound, Vibration, and Seismic Control 04-2006 217 KB  | 26 KB
UFGS 22 05 83.63 Cured-In Place Pipe (CIPP) Lining 11-2013 37 KB  | 7 KB
UFGS 22 07 19.00 40 Plumbing Piping Insulation 08-2013 65 KB  | 13 KB
UFGS 22 10 00.00 10 Vertical Pumps, Axial-Flow and Mixed-Flow Impeller-Type 07-2007 153 KB  | 42 KB
UFGS 22 11 23.00 10 Submersible Pump, Axial-Flow and Mixed-Flow Type 07-2007 91 KB  | 24 KB
UFGS 22 13 29 Sanitary Sewerage Pumps 02-2011 96 KB  | 20 KB
UFGS 22 13 36 Pneumatic Sewage Ejectors 02-2009 44 KB  | 9 KB
UFGS 22 14 29.00 40 Sump Pumps 08-2011 60 KB  | 12 KB
UFGS 22 15 09.00 40 General Service Compressed-Air Systems Cleaning Procedures 02-2014 52 KB  | 10 KB
UFGS 22 15 13.16 40 High-Pressure Compressed-Air Piping and Valves, Stainless 02-2011 102 KB  | 22 KB
UFGS 22 15 14.00 40 General Service Compressed-Air Systems, Low Pressure 02-2011 103 KB  | 27 KB
UFGS 22 15 19.13 20 Large Nonlubricated Reciprocating Air Compressors (Over 300 HP) 11-2009 85 KB  | 21 KB
UFGS 22 15 19.19 20 Nonlubricated Rotary Screw Air Compressors (100 HP and Larger) 05-2011 83 KB  | 21 KB
UFGS 22 15 26.00 20 High and Medium Pressure Compressed Air Piping 04-2006 151 KB  | 36 KB
UFGS 22 16 19.26 20 Large Centrifugal Air Compressors (Over 200 HP) 11-2009 83 KB  | 21 KB
UFGS 22 31 00 Water Softeners, Cation-Exchange (Sodium Cycle) 02-2009 67 KB  | 17 KB
UFGS 22 33 30.00 10 Solar Water Heating Equipment 04-2008 91 KB  | 22 KB
UFGS 22 60 70 Gas and Vacuum Systems for Healthcare Facilities 05-2009 178 KB  | 40 KB
UFGS 22 66 53.00 40 Laboratory Chemical Waste and Vent Piping 02-2011 34 KB  | 5 KB
Division 23 - Heating, Ventilating, and Air Conditioning 05-2014 2.1 MB
UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems 08-2010 230 KB  | 62 KB
UFGS 23 01 30.41 HVAC System Cleaning 08-2010 47 KB  | 9 KB
UFGS 23 03 00.00 20 Basic Mechanical Materials and Methods 08-2010 36 KB  | 7 KB
UFGS 23 05 15 Common Piping for HVAC 02-2014 131 KB  | 32 KB
UFGS 23 05 48.00 40 Vibration and Seismic Controls for HVAC Piping and Equipment 02-2011 62 KB  | 10 KB
UFGS 23 05 93 Testing, Adjusting, and Balancing for HVAC 08-2009 167 KB  | 35 KB
UFGS 23 07 00 Thermal Insulation for Mechanical Systems 02-2013 199 KB  | 42 KB
UFGS 23 08 00.00 10 Commissioning of HVAC Systems 01-2008 118 KB  | 18 KB
UFGS 23 08 01.00 20 Testing Industrial Ventilation Systems 04-2006 105 KB  | 18 KB
UFGS 23 09 13.34 40 Control Valves, Self-Contained 02-2011 35 KB  | 6 KB
UFGS 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC 08-2009 170 KB  | 49 KB
UFGS 23 09 23 Lonworks Direct Digital Control for HVAC and Other Building Control Systems 05-2011 316 KB  | 67 KB
UFGS 23 09 33.00 40 Electric and Electronic Control System for HVAC 08-2010 90 KB  | 22 KB
UFGS 23 09 53.00 20 Space Temperature Control Systems 02-2010 143 KB  | 37 KB
UFGS 23 11 25 Facility Gas Piping 11-2008 87 KB  | 21 KB
UFGS 23 21 13.00 20 Low Temperature Water (LTW) Heating System 04-2006 87 KB  | 22 KB
UFGS 23 21 13.23 20 [High] [Medium] Temperature Water System Within Buildings 07-2007 67 KB  | 15 KB
UFGS 23 22 13.35 40 Steam Traps 02-2014 29 KB  | 4 KB
UFGS 23 22 23.00 40 Steam Condensate Pumps 02-2011 43 KB  | 9 KB
UFGS 23 22 25.00 40 Steam Valves 02-2011 55 KB  | 8 KB
UFGS 23 22 26.00 20 Steam System and Terminal Units 02-2010 84 KB  | 20 KB
UFGS 23 23 00 Refrigerant Piping 10-2007 87 KB  | 23 KB
UFGS 23 25 00 Chemical Treatment of Water for Mechanical Systems 11-2008 89 KB  | 16 KB
UFGS 23 31 13.00 40 Metal Ducts 11-2012 91 KB  | 20 KB
UFGS 23 33 56 Self-Acting Blast Valves 02-2009 50 KB  | 10 KB
UFGS 23 34 23.00 40 HVAC Power Ventilators 05-2014 41 KB  | 7 KB
UFGS 23 35 00.00 10 Overhead Vehicle Tailpipe [and Welding Fume] Exhaust Removal System(s) 02-2009 57 KB  | 13 KB
UFGS 23 35 19.00 20 Industrial Ventilation and Exhaust 02-2010 150 KB  | 38 KB
UFGS 23 36 00.00 40 Air Terminal Units 02-2011 84 KB  | 13 KB
UFGS 23 37 13.00 40 Diffusers, Registers and Grills 05-2010 38 KB  | 6 KB
UFGS 23 40 00.00 10 Chemical, Biological and Radiological (CBR) Air Filtration System 10-2007 70 KB  | 17 KB
UFGS 23 41 13.00 40 Panel Filters 05-2010 45 KB  | 9 KB
UFGS 23 51 43.00 20 Dust and Gas Collector, Dry Scrubber and Fabric Filter Type 02-2010 343 KB  | 104 KB
UFGS 23 51 43.01 20 Mechanical Cyclone Dust Collector of Flue Gas Particulates 04-2006 110 KB  | 26 KB
UFGS 23 51 43.02 20 Electrostatic Dust Collector of Flue Gas Particulates 04-2006 137 KB  | 35 KB
UFGS 23 51 43.03 20 Fabric Filter Dust Collector of Fly Ash Particles in Flue Gas 02-2010 150 KB  | 38 KB
UFGS 23 52 00 Heating Boilers 04-2008 220 KB  | 60 KB
UFGS 23 52 33.01 20 Steam Heating Plant Watertube (Shop Assembled) Coal/Oil or Coal 11-2008 447 KB  | 120 KB
UFGS 23 52 33.02 20 Steam Heating Plant Watertube (Field Erected) Coal/Oil or Coal 11-2008 513 KB  | 139 KB
UFGS 23 52 33.03 20 Water-Tube Boilers, Oil/Gas or Oil 11-2008 264 KB  | 69 KB
UFGS 23 52 43.00 10 Heat Recovery Boilers 04-2008 194 KB  | 56 KB
UFGS 23 52 43.00 20 Low Pressure Water Heating Boilers (Under 800,000 BTU/HR Output) 07-2006 54 KB  | 11 KB
UFGS 23 52 46.00 20 Low Pressure Water Heating Boilers (Over 800,000 BTU/HR Output) 04-2006 50 KB  | 10 KB
UFGS 23 52 49.00 20 Steam Boilers and Equipment (500,000 - 18,000,000 BTU/HR) 11-2008 88 KB  | 24 KB
UFGS 23 52 53.00 20 Steam Boilers and Equipment (18,000,000 - 60,000,000 BTU/HR) 04-2006 101 KB  | 29 KB
UFGS 23 54 16.00 10 Heating System; Gas-Fired Heaters 04-2008 42 KB  | 8 KB
UFGS 23 54 19 Building Heating Systems, Warm Air 11-2008 85 KB  | 22 KB
UFGS 23 57 10.00 10 Forced Hot Water Heating Systems Using Water and Steam Heat Exchangers 01-2008 138 KB  | 35 KB
UFGS 23 63 00.00 10 Cold Storage Refrigeration Systems 10-2007 156 KB  | 44 KB
UFGS 23 64 00 Packaged Water Chillers, Absorbtion Type 08-2009 65 KB  | 16 KB
UFGS 23 64 10 Water Chillers, Vapor Compression Type 08-2008 146 KB  | 39 KB
UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems 08-2009 148 KB  | 39 KB
UFGS 23 65 00 Cooling Towers 08-2008 75 KB  | 19 KB
UFGS 23 69 00.00 20 Refrigeration Equipment for Cold Storage 07-2006 99 KB  | 26 KB
UFGS 23 70 01.00 10 Central Steam-Generating System, Coal-Fired 01-2008 342 KB  | 100 KB
UFGS 23 70 02.00 10 Central Steam Generating System - Combination Gas and Oil Fired 01-2008 286 KB  | 80 KB
UFGS 23 70 03.00 10 Heating and Utilities Systems, Central Steam 01-2008 116 KB  | 30 KB
UFGS 23 71 19 Thermal Energy Storage System: Ice-On-Coil 01-2008 58 KB  | 13 KB
UFGS 23 72 00.00 10 Energy Recovery Systems 01-2008 67 KB  | 17 KB
UFGS 23 72 26.00 10 Desiccant Cooling Systems 04-2008 80 KB  | 20 KB
UFGS 23 73 13.00 40 Modular Indoor Central-Station Air-Handling Units 05-2014 60 KB  | 13 KB
UFGS 23 74 33.00 40 Packaged, Outdoor Heating and Cooling Makeup Air-Conditioners 02-2011 45 KB  | 9 KB
UFGS 23 76 00.00 10 Evaporative Cooling Systems 04-2008 64 KB  | 15 KB
UFGS 23 76 00.00 20 Evaporative Cooling System 07-2006 56 KB  | 12 KB
UFGS 23 81 00.00 20 Unitary Air Conditioning Equipment 11-2009 92 KB  | 22 KB
UFGS 23 81 23.00 20 Computer Room Air Conditioning Units 02-2010 77 KB  | 18 KB
UFGS 23 81 47 Water-Loop and Ground-Loop Heat Pump Systems 08-2008 186 KB  | 49 KB
UFGS 23 82 00.00 20 Terminal Heating and Cooling Units 11-2008 54 KB  | 11 KB
UFGS 23 82 01.00 10 Warm Air Heating Systems 04-2008 78 KB  | 20 KB
UFGS 23 82 02.00 10 Unitary Heating and Cooling Equipment 04-2008 140 KB  | 35 KB
UFGS 23 82 16.00 40 Air Coils 05-2013 42 KB  | 8 KB
UFGS 23 82 19.00 40 Fan Coil Units 05-2014 37 KB  | 6 KB
UFGS 23 82 23.00 40 Unit Ventilators 05-2014 55 KB  | 10 KB
UFGS 23 82 43.00 40 Electric Duct Heaters 08-2011 30 KB  | 5 KB
UFGS 23 82 46.00 40 Electric Unit Heaters 08-2011 29 KB  | 4 KB
UFGS 23 83 00.00 20 Electric Space Heating Equipment 04-2006 39 KB  | 6 KB
UFGS 23 84 16.00 20 Desiccant Dehumidification Equipment 11-2008 31 KB  | 5 KB
Division 25 - Integrated Automation 05-2014 86 KB
UFGS 25 08 10 Utility Monitoring and Control System Testing 04-2006 150 KB  | 25 KB
UFGS 25 10 10 Utility Monitoring and Control System (UMCS) Front End Integration 11-2012 225 KB  | 60 KB
Division 26 - Electrical 05-2014 1.3 MB
UFGS 26 00 00.00 20 Basic Electrical Materials and Methods 07-2006 34 KB  | 6 KB
UFGS 26 05 00.00 40 Common Work Results for Electrical 08-2013 59 KB  | 13 KB
UFGS 26 05 13.00 40 Medium-Voltage Cables 11-2013 64 KB  | 13 KB
UFGS 26 05 19.00 10 Insulated Wire and Cable 11-2008 59 KB  | 12 KB
UFGS 26 05 33 Dockside Power Connections Stations 01-2007 66 KB  | 14 KB
UFGS 26 05 48.00 10 Seismic Protection for Electrical Equipment 10-2007 35 KB  | 6 KB
UFGS 26 05 70.00 40 High-Voltage Overcurrent Protective Devices 11-2011 71 KB  | 15 KB
UFGS 26 05 71.00 40 Low-Voltage Overcurrent Protective Devices 02-2014 72 KB  | 16 KB
UFGS 26 08 00 Apparatus Inspection and Testing 08-2008 29 KB  | 4 KB
UFGS 26 09 13 Power Monitoring System 11-2008 79 KB  | 19 KB
UFGS 26 09 23.00 40 Lighting Control Devices 08-2013 46 KB  | 9 KB
UFGS 26 11 13.00 20 Primary Unit Substations 04-2007 135 KB  | 34 KB
UFGS 26 11 14.00 10 Main Electric Supply Station and Substation 10-2007 203 KB  | 55 KB
UFGS 26 11 16 Secondary Unit Substations 02-2010 123 KB  | 30 KB
UFGS 26 12 19.00 40 Pad-Mounted, Liquid-Filled Medium-Voltage Transformers 02-2011 92 KB  | 21 KB
UFGS 26 12 19.10 Three-Phase Pad-Mounted Transformers 02-2012 108 KB  | 23 KB
UFGS 26 12 21 Single-Phase Pad-Mounted Transformers 11-2013 94 KB  | 22 KB
UFGS 26 13 00.00 20 SF6/High-Firepoint Fluids Insulated Pad-Mounted Switchgear 08-2011 48 KB  | 9 KB
UFGS 26 13 01 Pad-Mounted Dead-Front Air Insulated Switchgear 08-2013 50 KB  | 9 KB
UFGS 26 18 23.00 40 Medium-Voltage Surge Arresters 08-2013 32 KB  | 5 KB
UFGS 26 20 00 Interior Distribution System 02-2014 202 KB  | 51 KB
UFGS 26 22 00.00 10 480-Volt Station Service Switchgear and Transformers 10-2007 87 KB  | 23 KB
UFGS 26 23 00.00 40 Switchboards and Switchgear 02-2011 94 KB  | 22 KB
UFGS 26 23 00 Switchboards and Switchgear 07-2006 88 KB  | 20 KB
UFGS 26 24 16.00 40 Panelboards 08-2013 41 KB  | 8 KB
UFGS 26 24 19.00 40 Motor-Control Centers 08-2010 94 KB  | 25 KB
UFGS 26 27 13.10 30 Electric Meters 10-2007 58 KB  | 12 KB
UFGS 26 27 14.00 20 Electricity Metering 02-2011 88 KB  | 20 KB
UFGS 26 27 29 Marina Electrical Work 04-2006 76 KB  | 17 KB
UFGS 26 28 00.00 10 Motor Control Centers, Switchboards and Panelboards 10-2007 101 KB  | 26 KB
UFGS 26 28 01.00 10 Coordinated Power System Protection 10-2007 88 KB  | 20 KB
UFGS 26 28 21.00 40 Automatic Transfer Switches 08-2011 36 KB  | 6 KB
UFGS 26 29 01.00 10 Electric Motors, 3-Phase Vertical Induction Type 11-2008 67 KB  | 16 KB
UFGS 26 29 02.00 10 Electric Motors, 3-Phase Vertical Synchronous Type 11-2008 83 KB  | 22 KB
UFGS 26 29 23 Variable Frequency Drive Systems Under 600 Volts 04-2006 43 KB  | 9 KB
UFGS 26 32 13.00 20 Single Operation Generator Sets 04-2007 128 KB  | 31 KB
UFGS 26 32 14.00 10 Diesel-Generator Set, Stationary 15-300 KW, Standby Applications 02-2010 191 KB  | 48 KB
UFGS 26 32 15.00 10 Diesel-Generator Set Stationary 100-2500 KW, with Auxiliaries 10-2007 253 KB  | 64 KB
UFGS 26 32 26 Motor-Generator Sets, 400 Hertz (HZ) 04-2006 80 KB  | 19 KB
UFGS 26 32 33.00 10 Uninterruptible Power Supply (UPS) System Above 15 KVA Capacity 10-2007 118 KB  | 29 KB
UFGS 26 33 53.00 20 Uninterruptible Power Supply (UPS) 04-2008 113 KB  | 29 KB
UFGS 26 35 33.00 40 Power Factor Correction Equipment 08-2013 38 KB  | 7 KB
UFGS 26 35 43 400-Hertz (HZ) Solid State Frequency Converter 05-2011 87 KB  | 20 KB
UFGS 26 35 46.00 20 Radio Frequency Interference Power Line Filters 04-2006 56 KB  | 10 KB
UFGS 26 36 00.00 10 Automatic Transfer Switch and By-Pass/Isolation Switch 10-2007 54 KB  | 12 KB
UFGS 26 36 23.00 20 Automatic Transfer Switches 04-2006 38 KB  | 7 KB
UFGS 26 41 00 Lightning Protection System 11-2013 46 KB  | 9 KB
UFGS 26 41 00.00 40 Lightning Protection System 11-2008 64 KB  | 15 KB
UFGS 26 42 13.00 20 Cathodic Protection by Galvanic Anodes 04-2006 74 KB  | 17 KB
UFGS 26 42 14.00 10 Cathodic Protection System (Sacrificial Anode) 08-2009 88 KB  | 23 KB
UFGS 26 42 15.00 10 Cathodic Protection System (Steel Water Tanks) 02-2013 69 KB  | 17 KB
UFGS 26 42 17.00 10 Cathodic Protection System (Impressed Current) 11-2008 108 KB  | 28 KB
UFGS 26 42 19.00 20 Cathodic Protection by Impressed Current 04-2006 101 KB  | 24 KB
UFGS 26 42 19.10 Cathodic Protection Systems (Impressed Current) For Lock Miter Gates 11-2008 104 KB  | 27 KB
UFGS 26 42 22.00 20 Cathodic Protection System for Steel Water Tanks 01-2008 80 KB  | 19 KB
UFGS 26 51 00.00 40 Interior Lighting 02-2013 95 KB  | 22 KB
UFGS 26 51 00 Interior Lighting 07-2007 116 KB  | 27 KB
UFGS 26 52 00.00 40 Emergency Lighting 08-2011 33 KB  | 6 KB
UFGS 26 53 00.00 40 Exit Signs 11-2008 31 KB  | 5 KB
UFGS 26 54 21.00 10 Helipad Lighting and Visual Navigation Aids 10-2007 112 KB  | 30 KB
UFGS 26 55 53.00 40 Security Lighting 05-2011 98 KB  | 24 KB
UFGS 26 55 80.00 20 Surgical Lighting Fixtures 04-2006 35 KB  | 6 KB
UFGS 26 56 00 Exterior Lighting 05-2013 116 KB  | 28 KB
UFGS 26 56 13.00 40 Lighting Poles and Standards 11-2008 77 KB  | 17 KB
UFGS 26 56 19.00 40 Roadway Lighting 05-2013 39 KB  | 7 KB
UFGS 26 56 20.00 10 Airfield and Heliport Lighting and Visual Navigation Aids 10-2007 130 KB  | 34 KB
UFGS 26 56 23.00 40 Area Lighting 11-2008 50 KB  | 10 KB
UFGS 26 56 36.00 40 Flood Lighting 02-2013 54 KB  | 11 KB
UFGS 26 60 13.00 40 Low-Voltage Motors 11-2011 54 KB  | 10 KB
Division 27 - Communications 05-2014 308 KB
UFGS 27 05 13.00 10 Two-Way Radio Data Ethernet Transmission System 04-2006 54 KB  | 12 KB
UFGS 27 05 14.00 10 Cable Television Premises Distribution System 04-2006 36 KB  | 7 KB
UFGS 27 05 28.36 40 Cable Trays for Communications Systems 08-2011 28 KB  | 4 KB
UFGS 27 05 29.00 10 Protective Distribution System (PDS) for SIPRNET Communication Systems 08-2011 43 KB  | 8 KB
UFGS 27 10 00 Building Telecommunications Cabling System 08-2011 112 KB  | 26 KB
UFGS 27 13 23.00 40 Communications Optical Backbone Cabling 11-2008 92 KB  | 24 KB
UFGS 27 21 00.00 20 Intercommunication System 04-2006 63 KB  | 13 KB
UFGS 27 21 00.00 40 Intercommunication System 02-2011 60 KB  | 13 KB
UFGS 27 21 10.00 40 Fiber Optic Data Transmission System 05-2013 105 KB  | 27 KB
UFGS 27 33 30.00 10 Stand-Alone One-Way Radio Control System 04-2006 47 KB  | 10 KB
UFGS 27 33 31.00 10 One-Way FM Radio Data Control System (UMCS) 04-2006 62 KB  | 15 KB
UFGS 27 41 00.00 10 Nurse Call Audio-Visual (NCAV) System 04-2006 160 KB  | 42 KB
UFGS 27 41 16.00 10 Television Signal Reception System 04-2006 69 KB  | 15 KB
UFGS 27 51 13.00 10 Radio Paging System 04-2006 47 KB  | 10 KB
UFGS 27 51 16 Radio and Public Address Systems 04-2006 62 KB  | 13 KB
UFGS 27 51 23.10 Intercommunication System 05-2011 69 KB  | 12 KB
UFGS 27 52 23.00 20 Nurse Call System 04-2006 47 KB  | 9 KB
UFGS 27 52 32.00 10 Nurse Call Tone-Visual (NCTV) System 10-2007 123 KB  | 30 KB
UFGS 27 54 00.00 20 Community Antenna Television (CATV) 04-2006 58 KB  | 11 KB
Division 28 - Electronic Safety and Security 05-2014 551 KB
UFGS 28 05 26.00 40 Grounding and Bonding for Electronic Safety and Security 08-2013 45 KB  | 9 KB
UFGS 28 16 00.00 20 Basic Intrusion Detection Systems (IDS) 04-2006 115 KB  | 34 KB
UFGS 28 16 01.00 10 Small Intrusion Detection System 11-2008 93 KB  | 23 KB
UFGS 28 20 00.00 20 Electronic Security System (ESS), Commercial 04-2006 208 KB  | 68 KB
UFGS 28 20 01.00 10 Electronic Security System 10-2007 255 KB  | 67 KB
UFGS 28 20 02 Central Monitoring Services for Electronic Security Systems 11-2008 40 KB  | 7 KB
UFGS 28 23 23.00 10 Closed Circuit Television Systems 02-2011 122 KB  | 31 KB
UFGS 28 26 23 Duress Signal System (For Brig Facilities) 04-2006 32 KB  | 5 KB
UFGS 28 31 00.00 10 Fire Detection and Alarm System, Direct Current Loop 11-2008 89 KB  | 23 KB
UFGS 28 31 02.00 20 Fire Alarm Reporting Systems - Digital Communicators 02-2010 58 KB  | 13 KB
UFGS 28 31 13.00 40 Fire Detection and Alarm Control, GUI and Logic Systems 05-2013 174 KB  | 46 KB
UFGS 28 31 33.00 10 Fire Alarm Reporting System, Radio Type 11-2008 59 KB  | 14 KB
UFGS 28 31 33.13 20 Exterior Fire Reporting System, Radio Type 04-2006 116 KB  | 29 KB
UFGS 28 31 49 Carbon Monoxide Detectors 04-2006 25 KB  | 3 KB
UFGS 28 31 63.00 20 Analog/Addressable Interior Fire Alarm System 10-2007 114 KB  | 30 KB
UFGS 28 31 64.00 10 Fire Detection and Alarm System, Addressable 08-2009 95 KB  | 25 KB
UFGS 28 31 73.00 20 Exterior Fire Alarm System, Closed Circuit Telegraphic Type 02-2010 79 KB  | 20 KB
UFGS 28 31 74.00 20 Interior Fire Detection and Alarm System 02-2010 107 KB  | 27 KB
UFGS 28 31 75.00 10 Central Fire Alarm System, Digital Alarm Communicator Type 11-2008 54 KB  | 12 KB
UFGS 28 31 76 Interior Fire Alarm and Mass Notification System 08-2011 156 KB  | 42 KB
UFGS 28 33 00.00 40 Fuel-Gas Detection and Alarm 02-2014 35 KB  | 6 KB
UFGS 28 40 01 Watchtour System (For Brig Facilities) 04-2006 35 KB  | 6 KB
SITE AND INFRASTRUCTURE SUBGROUP
Division 31 - Earthwork 05-2014 576 KB
UFGS 31 00 00 Earthwork 08-2008 134 KB  | 35 KB
UFGS 31 05 19 Geotextile 08-2008 46 KB  | 9 KB
UFGS 31 05 20 Geosynthetic Drainage Layer 08-2008 40 KB  | 7 KB
UFGS 31 05 21 Geogrid Soil Reinforcement 08-2008 42 KB  | 9 KB
UFGS 31 05 22 Geotextiles Used as Filters 08-2008 55 KB  | 12 KB
UFGS 31 10 00 Clearing for Civil Works 08-2008 38 KB  | 7 KB
UFGS 31 11 00 Clearing and Grubbing 08-2008 33 KB  | 6 KB
UFGS 31 21 00 Piping; Off-Gas 08-2008 88 KB  | 22 KB
UFGS 31 21 13 Radon Mitigation 08-2011 97 KB  | 19 KB
UFGS 31 23 00.00 20 Excavation and Fill 02-2011 131 KB  | 32 KB
UFGS 31 31 16.19 Termite Control Barrier System 04-2006 33 KB  | 6 KB
UFGS 31 31 16.20 Basaltic Termite Barrier 04-2006 28 KB  | 4 KB
UFGS 31 31 16.21 Mesh Termite Barrier 08-2008 28 KB  | 4 KB
UFGS 31 31 16 Soil Treatment for Subterranean Termite Control 08-2008 41 KB  | 8 KB
UFGS 31 32 11 Soil Surface Erosion Control 08-2008 112 KB  | 24 KB
UFGS 31 32 23 Foundation Drilling and Grouting 08-2008 80 KB  | 19 KB
UFGS 31 32 39 Bioengineering Practices for Stream Bank and Shoreline Stabilization 08-2008 214 KB  | 58 KB
UFGS 31 36 00 Wire Mesh Gabions [And Mattresses] 08-2008 83 KB  | 19 KB
UFGS 31 41 16 Metal Sheet Piling 08-2009 86 KB  | 17 KB
UFGS 31 60 00 Foundation Preparation 11-2008 48 KB  | 9 KB
UFGS 31 62 13.13 Cast-In-Place Concrete Piles 04-2006 47 KB  | 9 KB
UFGS 31 62 13.20 Precast/Prestressed Concrete Piles 08-2009 116 KB  | 29 KB
UFGS 31 62 13.24 Concrete Cylinder Piles 08-2011 137 KB  | 36 KB
UFGS 31 62 13.26 Pressure-Injected Footings 04-2006 43 KB  | 8 KB
UFGS 31 62 16.16 Steel H Piles 11-2011 81 KB  | 20 KB
UFGS 31 62 19.13 Wood Marine Piles 04-2006 77 KB  | 18 KB
UFGS 31 62 19 Timber Piles 01-2008 70 KB  | 15 KB
UFGS 31 62 21 Piling: Composite, Wood and Cast In-Place Concrete 11-2008 49 KB  | 11 KB
UFGS 31 62 23.13 Cast-In-Place Concrete Piles, Steel Casing 11-2008 47 KB  | 10 KB
UFGS 31 63 16 Auger Cast Grout Piles 11-2008 55 KB  | 12 KB
UFGS 31 63 26 Drilled Caissons 08-2008 55 KB  | 11 KB
UFGS 31 63 29 Drilled Concrete Piers and Shafts 05-2009 49 KB  | 9 KB
UFGS 31 68 13 Soil and Rock Anchors 11-2008 111 KB  | 27 KB
UFGS 31 73 00 Tunnel and Shaft Grouting 11-2008 78 KB  | 20 KB
Division 32 - Exterior Improvements 05-2014 1 MB
UFGS 32 01 11.51 Rubber and Paint Removal From Airfield Pavements 04-2006 31 KB  | 5 KB
UFGS 32 01 11.52 Runway Rubber Removal 08-2008 26 KB  | 4 KB
UFGS 32 01 13.00 20 Emulsified Asphalt Seal Coats [With] [Without] Aggregate 02-2012 67 KB  | 15 KB
UFGS 32 01 13 Bituminous Seal and Fog Coats 08-2008 62 KB  | 14 KB
UFGS 32 01 16.17 Cold Milling of Bituminous Pavements 08-2008 27 KB  | 4 KB
UFGS 32 01 17.16 Sealing of Cracks in Bituminous Pavements 08-2008 42 KB  | 9 KB
UFGS 32 01 17.62 Stress-Absorbing Membrane Interlayer 05-2011 46 KB  | 9 KB
UFGS 32 01 17 Cold-Mix Recycling 08-2008 61 KB  | 14 KB
UFGS 32 01 19.61 Resealing of Joints in Rigid Pavement 04-2006 60 KB  | 13 KB
UFGS 32 01 19 Field Molded Sealants for Sealing Joints in Rigid Pavements 08-2008 55 KB  | 12 KB
UFGS 32 01 22 Bituminous Rejuvenation 08-2008 35 KB  | 6 KB
UFGS 32 01 24 Hot In-Place Recycling of Bituminous Pavements 08-2008 48 KB  | 10 KB
UFGS 32 01 25 Heater Scarifying of Bituminous Pavements 08-2008 34 KB  | 6 KB
UFGS 32 01 26.71 Grooving for Airfield Pavements 08-2008 28 KB  | 4 KB
UFGS 32 01 29.61 Partial Depth Patching of Rigid Paving 11-2008 82 KB  | 19 KB
UFGS 32 01 29.62 Slabjacking Rigid Pavements 08-2008 47 KB  | 10 KB
UFGS 32 05 33 Landscape Establishment 02-2010 57 KB  | 13 KB
UFGS 32 10 00 [Pervious] Bituminous Concrete Pavement 08-2008 60 KB  | 11 KB
UFGS 32 11 10 Drainage Layer 08-2008 72 KB  | 16 KB
UFGS 32 11 16.13 Sand-Clay [Base] [Subbase] Course 04-2006 31 KB  | 5 KB
UFGS 32 11 16.16 [Base Course for Rigid] [and Subbase Course for Flexible] [Subbase Course for Pervious] Paving 11-2011 40 KB  | 8 KB
UFGS 32 11 16 [Base Course for Rigid] [and Subbases for Flexible] Paving 08-2008 55 KB  | 11 KB
UFGS 32 11 23 Aggregate and/or Graded-Crushed Aggregate Base Course 08-2008 68 KB  | 15 KB
UFGS 32 11 24 Graded Crushed Aggregate Base Course for [Pervious] [Flexible] Pavement 11-2011 50 KB  | 10 KB
UFGS 32 11 26.16 Bituminous Concrete Base Course 04-2006 52 KB  | 12 KB
UFGS 32 11 26 Bituminous Base Course 08-2008 60 KB  | 13 KB
UFGS 32 11 27 Bituminous-Stabilized Base Course, Subbase, or Subgrade 08-2008 56 KB  | 12 KB
UFGS 32 11 29 Lime-[Stabilized] [Modified] Subgrade 11-2009 67 KB  | 16 KB
UFGS 32 11 30 Lime Treated Subgrade [Lime Modified Soils] 08-2008 50 KB  | 11 KB
UFGS 32 11 33 Cement Stabilized [Base] [Subbase] Course at Airfields and Roads 08-2008 78 KB  | 17 KB
UFGS 32 11 34 Portland Cement-Stabilized Base or Subbase Course 08-2008 63 KB  | 14 KB
UFGS 32 11 36.13 Lean Concrete Base Course 04-2006 54 KB  | 12 KB
UFGS 32 12 10 Bituminous Tack and Prime Coats 08-2008 54 KB  | 11 KB
UFGS 32 12 11 Bituminous Surface Treatment 11-2008 50 KB  | 10 KB
UFGS 32 12 15.13 Hot-Mix Asphalt Airfield Paving 11-2012 125 KB  | 31 KB
UFGS 32 12 15.16 Warm-Mix Asphalt Airfield Paving 11-2012 122 KB  | 30 KB
UFGS 32 12 16 Hot-Mix Asphalt (HMA) for Roads 08-2009 102 KB  | 27 KB
UFGS 32 12 17 Hot Mix Bituminous Pavement 04-2008 89 KB  | 21 KB
UFGS 32 12 18 Resin Modified Pavement Surfacing Material 08-2008 78 KB  | 19 KB
UFGS 32 12 19 Bituminous Binder and Wearing Courses (Central-Plant Cold-Mix) 08-2008 59 KB  | 12 KB
UFGS 32 12 21 Bituminous Road-Mix Surface Course 08-2008 59 KB  | 13 KB
UFGS 32 12 22.00 10 Polymer Concrete-Micro-Overlay (PCMO) For Fuel and Abrasion Resistant Wearing Surfaces 08-2008 52 KB  | 11 KB
UFGS 32 12 36.19 Coal Tar Seal Coat with Unvulcanized Rubber 04-2006 37 KB  | 7 KB
UFGS 32 12 37 Fuel-Resistant (Coal Tar) Sealer 08-2008 46 KB  | 9 KB
UFGS 32 12 43.16 Porous Friction Course for Airfields and Roads 08-2008 74 KB  | 18 KB
UFGS 32 13 11 Concrete Pavement for Airfields and Other Heavy-Duty Pavement 11-2012 235 KB  | 67 KB
UFGS 32 13 13.06 Portland Cement Concrete Pavement for Roads and Site Facilities 11-2011 93 KB  | 23 KB
UFGS 32 13 15.20 Concrete Pavement for Containment Dikes 11-2010 61 KB  | 14 KB
UFGS 32 13 16.16 Roller Compacted Concrete (RCC) Pavement 11-2008 179 KB  | 52 KB
UFGS 32 13 17 Stone Matrix Asphalt (SMA) for Airfield Pavements 08-2008 97 KB  | 26 KB
UFGS 32 13 43 Pervious Concrete Paving 11-2011 69 KB  | 16 KB
UFGS 32 13 73 Compression Joint Seals for Concrete Pavements 04-2008 53 KB  | 12 KB
UFGS 32 15 00 Aggregate Surface Course 04-2008 43 KB  | 8 KB
UFGS 32 16 13 Concrete Sidewalks and Curbs and Gutters 04-2008 59 KB  | 13 KB
UFGS 32 16 15 Concrete Block Pavements 04-2008 38 KB  | 7 KB
UFGS 32 17 23.00 20 Pavement Markings 04-2006 79 KB  | 19 KB
UFGS 32 17 24.00 10 Pavement Markings 04-2008 60 KB  | 14 KB
UFGS 32 18 16.13 Playground Protective Surfacing 04-2008 72 KB  | 16 KB
UFGS 32 31 13.53 High-Security Chain Link Fences and Gates 04-2008 59 KB  | 13 KB
UFGS 32 31 13 Chain Link Fences and Gates 08-2010 66 KB  | 13 KB
UFGS 32 31 26 Wire Fences and Gates 04-2008 37 KB  | 7 KB
UFGS 32 32 23 Segmental Concrete Block Retaining Wall 04-2008 80 KB  | 20 KB
UFGS 32 84 23 Underground Sprinkler Systems 04-2008 74 KB  | 17 KB
UFGS 32 84 24 Irrigation Sprinkler Systems 08-2011 97 KB  | 21 KB
UFGS 32 92 19 Seeding 10-2006 59 KB  | 11 KB
UFGS 32 92 23 Sodding 04-2006 50 KB  | 9 KB
UFGS 32 92 26 Sprigging 04-2006 55 KB  | 11 KB
UFGS 32 93 00 Exterior Plants 02-2010 104 KB  | 25 KB
UFGS 32 96 00 Transplanting Exterior Plants 02-2010 72 KB  | 17 KB
Division 33 - Utilities 05-2014 1.3 MB
UFGS 33 01 50.01 Cleaning Fuel Storage Tanks 02-2010 40 KB  | 8 KB
UFGS 33 01 98 Slip Lining of Existing Piping for Levee Applications 05-2013 69 KB  | 16 KB
UFGS 33 01 99 Slip Lining of Existing Piping 05-2009 40 KB  | 8 KB
UFGS 33 05 16 Concrete Poles 08-2008 33 KB  | 5 KB
UFGS 33 05 23.13 Utility Horizontal Directional Drilling 11-2013 32 KB  | 6 KB
UFGS 33 05 23.19 Trenchless Excavation Using Microtunneling 04-2006 78 KB  | 19 KB
UFGS 33 08 53 Aviation Fuel Distribution System Start-Up 02-2010 52 KB  | 11 KB
UFGS 33 08 55 Commissioning of Fuel Facility Systems 07-2007 65 KB  | 15 KB
UFGS 33 09 53 Aviation Fuel Pump Control and Annunciation System 02-2010 126 KB  | 29 KB
UFGS 33 09 54 Aviation Fuel Pump Control and Annunciation System (Type [IV][V]) 02-2010 128 KB  | 30 KB
UFGS 33 09 55 Aviation Fuel Pump Control and Annunciation System (Cut-N-Cover Tanks) 02-2010 129 KB  | 30 KB
UFGS 33 11 00 Water Distribution 02-2011 177 KB  | 41 KB
UFGS 33 11 23 Natural Gas and Liquid Petroleum Piping 11-2009 61 KB  | 13 KB
UFGS 33 12 33.00 30 Water Utility Metering 11-2011 66 KB  | 15 KB
UFGS 33 16 13.16 Wire-Wound Circular Prestressed-Concrete Water Tank 04-2006 31 KB  | 4 KB
UFGS 33 16 15 Water Storage Steel Tanks 04-2008 66 KB  | 15 KB
UFGS 33 20 00 Water Wells 04-2008 124 KB  | 34 KB
UFGS 33 24 00.00 20 [Extraction] [Monitoring] Wells 04-2006 55 KB  | 12 KB
UFGS 33 24 13 Groundwater Monitoring Wells 08-2008 105 KB  | 28 KB
UFGS 33 26 00.00 10 Relief Wells 04-2008 77 KB  | 20 KB
UFGS 33 30 00 Sanitary Sewers 04-2008 111 KB  | 26 KB
UFGS 33 32 13.13 Packaged Sewage Lift Stations, Wet Well Type 05-2009 47 KB  | 9 KB
UFGS 33 32 13.14 Package Sewage Lift Stations, Grinder Pump Type 01-2008 47 KB  | 10 KB
UFGS 33 34 00 Force Mains and Inverted Siphons; Sewer 04-2008 60 KB  | 13 KB
UFGS 33 34 13 Siphons, Dosing 04-2008 29 KB  | 4 KB
UFGS 33 40 00 Storm Drainage Utilities 02-2010 122 KB  | 30 KB
UFGS 33 45 00.00 10 Speed Reducers for Storm Water Pumps 04-2008 62 KB  | 14 KB
UFGS 33 46 13 Foundation Drainage System 04-2008 42 KB  | 7 KB
UFGS 33 46 16 Subdrainage System 04-2008 71 KB  | 16 KB
UFGS 33 47 13 Pond and Reservoir Liners 04-2006 42 KB  | 7 KB
UFGS 33 51 13.00 30 Natural-Gas Metering 05-2010 48 KB  | 10 KB
UFGS 33 51 15 Natural-Gas / Liquid Petroleum Gas Distribution 11-2008 90 KB  | 23 KB
UFGS 33 52 10 Service Piping, Fuel Systems 04-2008 120 KB  | 30 KB
UFGS 33 52 43.11 Aviation Fuel Mechanical Equipment 02-2010 119 KB  | 29 KB
UFGS 33 52 43.12 Aviation Fuel Pantograph 02-2010 55 KB  | 10 KB
UFGS 33 52 43.13 Aviation Fuel Piping 02-2010 123 KB  | 34 KB
UFGS 33 52 43.14 Aviation Fuel Control Valves 02-2010 69 KB  | 13 KB
UFGS 33 52 43.23 Aviation Fuel Pumps 02-2010 83 KB  | 18 KB
UFGS 33 52 43.28 Filter Separator, Aviation Fueling System 11-2010 53 KB  | 10 KB
UFGS 33 52 43 Aviation Fuel Distribution (Non-Hydrant) 05-2011 109 KB  | 28 KB
UFGS 33 52 80 Liquid Fuels Pipeline Coating Systems 02-2010 62 KB  | 13 KB
UFGS 33 52 90.00 20 Welding for POL Service Piping 02-2010 68 KB  | 16 KB
UFGS 33 56 10 Factory-Fabricated Fuel Storage Tanks 01-2008 88 KB  | 21 KB
UFGS 33 56 13.13 Steel Tanks With Fixed Roofs 05-2012 115 KB  | 29 KB
UFGS 33 56 13.15 Undertank Interstitial Space 05-2012 62 KB  | 13 KB
UFGS 33 56 53 Pressure Vessels for Storage of Compressed Gases 04-2008 71 KB  | 17 KB
UFGS 33 56 63 Fuel Impermeable Liner System 04-2006 43 KB  | 8 KB
UFGS 33 57 00 Bulk Fuel Receiving / Dispensing Equipment 08-2011 104 KB  | 27 KB
UFGS 33 58 00 Leak Detection for Fueling Systems 04-2008 47 KB  | 10 KB
UFGS 33 59 00 Tightness of Existing Underground Fuel Systems 04-2007 40 KB  | 8 KB
UFGS 33 60 00.00 10 Central High Temperature Water (HTW) Generating Plant and Auxiliaries 04-2008 298 KB  | 85 KB
UFGS 33 60 01 Valves, Piping, and Equipment in Valve Manholes 04-2008 94 KB  | 23 KB
UFGS 33 60 02 Aboveground Heat Distribution System 04-2008 78 KB  | 19 KB
UFGS 33 61 00 Prefabricated Underground Heating/Cooling Distribution System 04-2008 65 KB  | 15 KB
UFGS 33 61 13 Pre-Engineered Underground Heat Distribution System 08-2010 124 KB  | 32 KB
UFGS 33 61 14 Exterior Buried Preinsulated Water Piping 02-2010 44 KB  | 9 KB
UFGS 33 61 15 Heat Distribution Systems in Concrete Trenches 07-2006 93 KB  | 23 KB
UFGS 33 63 13 Exterior Underground Steam Distribution System 04-2006 148 KB  | 35 KB
UFGS 33 63 14 Exterior Buried Pumped Condensate Return 04-2006 52 KB  | 11 KB
UFGS 33 63 16 Exterior Shallow Trench Steam Distribution 07-2006 55 KB  | 12 KB
UFGS 33 63 23 Exterior Aboveground Steam Distribution 04-2006 68 KB  | 15 KB
UFGS 33 65 00 Cleaning Petroleum Storage Tanks 08-2011 95 KB  | 23 KB
UFGS 33 71 01.00 40 Overhead Transmission and Distribution 11-2008 142 KB  | 37 KB
UFGS 33 71 01 Overhead Transmission and Distribution 07-2006 145 KB  | 38 KB
UFGS 33 71 02 Underground Electrical Distribution 02-2014 152 KB  | 40 KB
UFGS 33 73 00.00 40 Utility Transformers 11-2008 49 KB  | 10 KB
UFGS 33 75 00.00 40 Switchgear and Protection Devices 11-2008 59 KB  | 14 KB
UFGS 33 77 19.00 40 Medium-Voltage Gas Switch 08-2013 37 KB  | 7 KB
UFGS 33 77 36.00 40 Medium-Voltage Utility Fuses 05-2014 27 KB  | 4 KB
UFGS 33 81 27 Pier Telephone Distribution Systems 04-2006 35 KB  | 6 KB
UFGS 33 82 00 Telecommunications Outside Plant (OSP) 04-2006 105 KB  | 26 KB
Division 34 - Transportation 05-2014 177 KB
UFGS 34 11 00 Railroad Track and Accessories 04-2008 257 KB  | 70 KB
UFGS 34 11 19.00 20 Welding Crane and Railroad Rail - Thermite Method 04-2006 35 KB  | 6 KB
UFGS 34 41 26.00 10 Access Control Point Control System 02-2009 170 KB  | 46 KB
UFGS 34 43 00.00 20 Airfield Lighting 02-2010 117 KB  | 29 KB
UFGS 34 71 13.19 Active Vehicle Barriers 04-2008 78 KB  | 16 KB
UFGS 34 73 13 Mooring and Grounding Points for Aircraft 04-2008 38 KB  | 7 KB
Division 35 - Waterway and Marine Construction 05-2014 468 KB
UFGS 35 01 41.00 10 Electromechanical Operating Machinery for Locks 04-2008 87 KB  | 23 KB
UFGS 35 01 42.00 10 Vertical Gate Lift Systems 04-2008 71 KB  | 18 KB
UFGS 35 01 70.13 Wire Rope for Gate Operating Devices 05-2014 46 KB  | 9 KB
UFGS 35 05 40.14 10 Hydraulic Power Systems for Civil Works Structures 05-2014 145 KB  | 41 KB
UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling and Assembly 05-2014 64 KB  | 14 KB
UFGS 35 20 14 Stoplogs 04-2008 44 KB  | 8 KB
UFGS 35 20 16.33 Miter Gates 01-2008 67 KB  | 15 KB
UFGS 35 20 16.39 Sector Gates 01-2008 59 KB  | 13 KB
UFGS 35 20 16.46 Tainter Gates and Anchorages 01-2008 70 KB  | 16 KB
UFGS 35 20 16.53 Vertical Lift Gates 01-2008 75 KB  | 16 KB
UFGS 35 20 16.59 Closure Gates 01-2008 71 KB  | 17 KB
UFGS 35 20 20 Electrical Equipment for Gate Hoist 01-2008 103 KB  | 23 KB
UFGS 35 20 23 Dredging 04-2006 42 KB  | 8 KB
UFGS 35 31 19.20 Articulating Concrete Block Revetments 01-2008 64 KB  | 15 KB
UFGS 35 31 19 Stone, Channel, Shoreline/Coastal Protection for Structures 01-2008 273 KB  | 71 KB
UFGS 35 41 00 Levee Construction 01-2008 165 KB  | 42 KB
UFGS 35 42 34 Reinforced Soil Slope 01-2008 65 KB  | 15 KB
UFGS 35 51 13.00 20 Concrete Floating Pier for Small Craft 04-2006 70 KB  | 16 KB
UFGS 35 59 13.13 Prestressed Concrete Fender Piling 08-2009 88 KB  | 21 KB
UFGS 35 59 13.14 20 Polymeric Fender Piles 02-2010 64 KB  | 14 KB
UFGS 35 59 13.16 Marine Fenders 05-2011 82 KB  | 17 KB
UFGS 35 59 13.19 Arch-Type Rubber Marine Fenders 04-2006 32 KB  | 5 KB
UFGS 35 73 13 Embankment for Earth Dams 01-2008 85 KB  | 19 KB
PROCESS EQUIPMENT SUBGROUP
Division 40 - Process Integration 05-2014 206 KB
UFGS 40 05 13 Pipelines, Liquid Process Piping 10-2007 303 KB  | 73 KB
UFGS 40 05 13.96 Welding Process Piping 05-2010 59 KB  | 13 KB
UFGS 40 17 26.00 20 Welding Pressure Piping 04-2006 84 KB  | 14 KB
UFGS 40 17 30.00 40 Welding General Piping 08-2010 40 KB  | 6 KB
UFGS 40 18 00.00 40 Vacuum Systems Process Piping 05-2014 105 KB  | 25 KB
UFGS 40 95 00 Process Control 10-2007 206 KB  | 58 KB
UFGS 40 95 33.23 20 Fiber Optic (FO) Outside Plant (OSP) Media 04-2006 56 KB  | 13 KB
Division 41 - Material Processing and Handling Equipment 05-2014 228 KB
UFGS 41 22 13.13 Bridge Cranes 04-2008 142 KB  | 35 KB
UFGS 41 22 13.14 Bridge Cranes, Overhead Electric, Top Running 04-2008 82 KB  | 20 KB
UFGS 41 22 13.15 Bridge Cranes, Overhead Electric, Under Running 04-2008 84 KB  | 21 KB
UFGS 41 22 13.16 Gantry Cranes 04-2008 132 KB  | 34 KB
UFGS 41 22 13.33 Portal Crane Track Installation 05-2010 77 KB  | 17 KB
UFGS 41 22 23.19 Monorail Hoists 04-2008 98 KB  | 21 KB
UFGS 41 24 26 Hydraulic Fluid Power Systems 01-2008 97 KB  | 27 KB
UFGS 41 36 30.00 10 Ultrasonic Inspection of Plates 01-2008 71 KB  | 16 KB
UFGS 41 65 10.00 10 Diesel/Natural Gas Fueled Engine Pump Drives 05-2009 124 KB  | 33 KB
Division 42 - Process Heating, Cooling and Drying Equipment 05-2014 52 KB
UFGS 42 22 00.00 40 Process Chillers and Coolers 05-2014 97 KB  | 25 KB
UFGS 42 22 13.00 40 Centrifugal Process Chillers and Coolers 02-2011 51 KB  | 11 KB
UFGS 42 22 16.00 40 Reciprocating Process Chillers and Coolers 05-2011 42 KB  | 8 KB
UFGS 42 23 13.00 40 Process Condensers 02-2011 41 KB  | 7 KB
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment 05-2014 196 KB
UFGS 43 11 00 Fans/Blowers/Pumps; Off-Gas 04-2008 115 KB  | 29 KB
UFGS 43 13 13.13 Vapor Phase Activated Carbon Adsorption Units 10-2007 75 KB  | 18 KB
UFGS 43 15 00.00 20 Low Pressure Compressed Air Piping (Non-Breathing Air Type) 04-2006 102 KB  | 24 KB
UFGS 43 21 13 Pumps: Water, Centrifugal 01-2008 76 KB  | 20 KB
UFGS 43 21 29 Flow Measuring Equipment (Potable Water) (Sewage Treatment Plant) 04-2006 48 KB  | 10 KB
UFGS 43 21 39 Pumps: Water, Vertical Turbine 04-2008 91 KB  | 22 KB
UFGS 43 31 13.14 Downflow Liquid Activated Carbon Adsorption Units 10-2007 98 KB  | 23 KB
UFGS 43 31 14 Trickling Filter 04-2006 44 KB  | 10 KB
UFGS 43 32 69 Chemical Feed Systems 04-2006 80 KB  | 16 KB
UFGS 43 32 76 Chlorine-Feeding Machines (Automatic, Semiautomatic and Manual) 01-2008 46 KB  | 10 KB
UFGS 43 41 16.16 40 Vertical Atmospheric Tanks and Vessels 02-2011 47 KB  | 9 KB
Division 44 - Pollution and Waste Control Equipment 05-2014 59 KB
UFGS 44 10 00 Air Pollution Control 10-2007 149 KB  | 37 KB
UFGS 44 13 52 Thermal (Catalytic) Oxidation Systems 02-2011 90 KB  | 22 KB
Division 46 - Water and Wastewater Equipment 05-2014 395 KB
UFGS 46 07 53.13 Packaged Wastewater Treatment Equipment, Aeration 02-2011 329 KB  | 76 KB
UFGS 46 07 53.16 Packaged Wastewater Treatment Equipment, Biochemical 02-2011 89 KB  | 20 KB
UFGS 46 07 53.19 Composting Toilet 02-2011 49 KB  | 11 KB
UFGS 46 20 20 Sewage Bar Screen and Mechanical Shredder 02-2011 43 KB  | 9 KB
UFGS 46 23 00 Grit Removal and Handling Equipment 02-2011 110 KB  | 24 KB
UFGS 46 24 16 Comminutors 02-2011 41 KB  | 8 KB
UFGS 46 25 14 Coalescing [or Vertical Tube] Oil-Water Separators 02-2011 68 KB  | 16 KB
UFGS 46 30 13 Advanced Oxidation Processes (AOP) 02-2011 120 KB  | 30 KB
UFGS 46 43 21 Circular Clarifier Equipment 02-2011 92 KB  | 21 KB
UFGS 46 51 00.00 10 Air and Gas Diffusion Equipment 02-2011 90 KB  | 22 KB
UFGS 46 53 62 Continuous Loop Reactor Wastewater Treatment System 02-2011 98 KB  | 23 KB
UFGS 46 61 00 Filtration Equipment 02-2011 110 KB  | 26 KB
UFGS 46 66 56 Open-Channel Disinfection Equipment 02-2011 63 KB  | 16 KB
UFGS 46 71 16 Gravity Belt Thickeners 02-2011 100 KB  | 25 KB
UFGS 46 73 00.35 Sludge-Digester Gas, Heating, and Mixing System 02-2011 70 KB  | 16 KB
UFGS 46 73 10 Floating Cover for Sludge-Digestion Tanks 02-2011 46 KB  | 10 KB
UFGS 46 76 23.16 Recessed Chamber Filter Presses 02-2011 139 KB  | 36 KB
Division 48 - Electrical Power Generation 05-2014 24 KB
UFGS 48 06 15 Turbine Oil 05-2014 38 KB  | 6 KB
UFGS 48 14 13.00 20 Solar Liquid Flat Plate Collectors 05-2011 77 KB  | 17 KB